Items - REPAIRS TO ROOF TREATMENT TO ACCESSIBLE AND NON-ACCESSIBLE ROOF IN CERTAIN BUILDING OF B , C JCOS AND ORS TYPE QTRS IN ZONE A AT, UNDER AGE B/R-I, KANCHANBAGH, HYDERABAD
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: GE(I) R&D KANCHANBAGH | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: REPAIRS TO ROOF TREATMENT TO ACCESSIBLE AND NON-ACCESSIBLE ROOF IN CERTAIN BUILDING OF 'B' , 'C' JCOS AND ORS TYPE QTRS IN ZONE 'A' AT, UNDER AGE B/R-I, KANCHANBAGH, HYDERABAD. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: GE(I)/K'BAGH/TOKEN/73 OF 2025-2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder Name : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Conversion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e. DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit, if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 3 | 4 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 5 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 6 | 7 |
0.01 | Note:-(Work shall be carried out upto G+3 storey bldg, contractor to quote rates accordingly). | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1.00 | Demolition of cement concrete as in roofs, floors (other than ground floors), beams stair cases, landing, chajjas and similar suspended work . | 90.76 | CUM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
2.00 | Dismantling of existing roof treatment including tar felt/cement plaster/concrete tiles/stone slabs/brick tiles etc from roof surfaces including cleaning the surface and removing the debris from site complete all as specified and as directed by Engr-in-charge. | 2194.00 | SQM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
3.00 | M&L for Plain Cement Concrete Type B0 (1:2:4) (using 12.5 mm graded CRUSHED stone aggregate) as in padding concrete, coving of vertical junctions on roof top incl dismantling old loose /cracked cement concrete complete all as directed by Engr-in-charge. | 87.76 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
4.00 | M&L for brushing neat cement slurry with 3 Kg of cement per Sqm over the RCC slab and sides complete all as directed by Engineer -in- Charge. | 2194.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
5.00 | M&L for rendering 10mm in CM (1:3) over concrete surfaces on RCC roof slabS and parapets mixed with WPC @ 2% by weight of cement shall be carried out complete all as specified and directed by Engr-in-Charge. Note : IWPC will be measured under separate item of this schedule. | 2194.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
6.00 | Supply only Integral water proofing compound | 368.85 | Kgs | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
7.00 | Providing and applying brush applied water based PU dispersed polymer modified elastomeric liquid membrane, ShaliUrethane BTD White Color with Zero VOC to from the membrane in situ at site with 3 layers of monolithic, seam less finish having > 500% elongation. The first layer is to be apply primer Shaliprime BTD @200 Gms per sqm and shall act as the prime coat to fill in the cavities. This can be brush or roller applied. For spray application, using any airless spary system with recommended nozzle size at 30:1 at 2 bar pressure. Providing and applying the 2nd coat @ 1 kg per sqm using the soft brush, roller or Spray system with the recommended nozzle size on to the primed surface . Providing and applying 45 Gsm Fiber cloth over the 1st coat, when substrate till the coat is tacky. Providing and applying 3rd coat @ 1 kg per sqm to finish the application for a thickness of 1.2 mm membrane formed in place. The second coat should be applied perpendicular to the first coat for cross linkage and complete as per the specification. | 1744.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
8.00 | Cement concrete tiles 25cm x 25cm x 20mm thick, m a c h i n e pressed; set jointed and pointed in neat cement slurry in roofs with white cement & pigment, and cut and polished complete, on 15 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). and dismantling of existing tiles | 480.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
9.00 | M&L water proofing treatment with polymeric standard membrane of weight not less than 3kg per sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt not less than 150gms/sqm) laid over primed surface by forced application complete. Shall be fused uniformly by LPG torch flame on horizontal/vertical/slope surface on roof complete and preparation of surfaces of any description, over 10cm in width or girth otherwise described and appplying two coat of aluminium paint @100ml per sqm over APP membrabe sheet complete all as specified and directed by Engr-in-Charge. Water proof treatment consist of as under: - (i) Applying one coat of bitumous primer conforming to IS 3384 @ 0.3 ltrs per sqm (ii) Laying APP based memberane as specified thickness and weight. (iii) Appplying one coat of bitumen grade 85/25 @1.20Kg per sqm. (iv) Two coats of aluminium paint | 450.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
10.00 | M&L for cutting grooves in brick wall 75mm wide and 65mm deep and sweeping horizontal face of groove with cement mortar (1:3) and making good in CM 1:3 after inserting membrane into the groove complete all as specified and directed by Engr-in-Charge. | 350.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
11.00 | M&L for cutting out cracks to 'V' - section in existing roof or terracing, cleaning out, wetting grouting with cement and sand slurry (1:3) . | 74.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
12.00 | Taking down cement or cement lime plaster on brick or concrete surfaces etc including racking out joints hacking for keys, scrubbing down with water etc. | 50.00 | SQM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
13.00 | Demolition of brick work built in cement mortar or cement lime mortar including all quoins, arches, pillars etc | 5.00 | CUM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
14.00 | M&L for brick work built in CM (1:4) with sub clas 'B' bricks, old size bricks, straight or curved on plan exc 6m mean radius complete . | 5.00 | CUM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
15.00 | M&L for rendering 15mm thick in cement mortar (1:4) on fair faces of brick work finished even and smooth w/o using extra cement complete all as specified. | 125.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
16.00 | M & L for Preparation of new plastered surfaces and applying two coats of weather proof antifungal Acrylic Exterior emulsion paint of Apex Ultima and shade over a coat of approved primer as recommended by the manufacturer over a coat of putty to make surfaces smooth all as required and as directed. | 125.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
17.00 | Disconnecting existing tanks of exc 500 & n exc 1000 ltr capacity , setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position. (Cleaning repairing, etc. measured separately) | 128.00 | Each | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
18.00 | Cleaning and removing all scale and dirt, etc, from tanks of exc 500 & nesc 1000 ltr capacity and from mouths of circulating pipes, etc | 93.00 | Each | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
19.00 | M & L in repairs rotational moulded polyethylene water storage tanks capacity 1000ltr (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I | 44.00 | Each | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
20.00 | Taking up or down steel tubing of 25 mm bore and connections, including cleaning for re- fixing or removal to store | 40.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
21.00 | Refixing old steel tubing of 25 mm bore and connections in new or old position (Walls, ceiling, floors, etc.) | 10.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
22.00 | S&F 25 mm bore Tubes, 'medium grade' galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors etc | 30.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
23.00 | Taking up or down steel tubing of 20mm bore and connections, including cleaning for re- fixing or removal to store | 50.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
24.00 | Refixing old steel tubing of 20 mm bore and connections in new or old position (Walls, ceiling, floors, etc.) | 20.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
25.00 | S&F 20 mm bore Tubes, 'medium grade' galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors etc | 30.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
26.00 | Taking up or down steel tubing of 15 mm bore and connections, including cleaning for re- fixing or removal to store | 20.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
27.00 | Refixing old steel tubing of 15 mm bore and connections in new or old position (Walls, ceiling, floors, etc.) | 30.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
28.00 | S&F 15 mm bore Tubes, 'medium grade' galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors etc | 20.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
29.00 | S&F in repair 20 mm Stop valves, cast copper alloy, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed | 13.00 | Each | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
30.00 | S&F in repair 25 mm Stop valves, cast copper alloy, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed | 22.00 | Each | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
31.00 | S&F in repair 20 mm bore Ball valves high pressure of PTMT with epoxy coat ed Aluminium rod & highdensity plastic ball screwed for iron pipe and fixed. (Minimum weight 15mm-142gms/ 2 0mm-210gms./ 25mm-455gms) | 70.00 | Each | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
32.00 | Taking down caves gutters and rain water pipes (any size or pattern), including all fittings, heads, shoes, bends, swan necks, etc including cleaning or refixing or removal to store (measured overall as fixed along the centre line over fittings and accessories) all as specified & directed. | 120.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
33.00 | S&F PVC SWR pipes 110mm dia pipe single socketed in any length with rubber ring joints fixed to walls all as specified & directed. | 120.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
34.00 | S&F 110mm PVC (SWR )bends with access door of any radius all as specified & directed. | 40.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
35.00 | Demolition of reinforced cement concrete is (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors), beams stair cases, landing, chajjas and similar suspended work . | 3.00 | CUM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
36.00 | Dismantling Asbestos Cement (Corrugated, Semi corrugated etc.) sheets in roof coverings. | 50.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
37.00 | M & L Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws as specified | 50.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
38.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for | 2.50 | Per quintal | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
39.00 | S&F framed work such as grills, gratings, etc with ends of bars shouldered and/ or riveted, or forged into spikes, framed guard bars, barred iron doors, ladders, framed balusters walk ways, railing, frame work of water tanks and similar works conforming to Fe-290, Gde -E- 165 | 250.00 | Kg | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
40.00 | Supply and Laying in repairs CPVC Pipes 16mm dia & fittings on walls/ceiling or laying in floors complete all fiitings as specified | 25.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
41.00 | Supplying and laying in repairs CPVC pipes 20mm outer dia SDR 11 & Plain CPVC SDR 11 fittings in trenches complete all as specified. | 258.00 | RM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |