Bidhelp
Department of Defence Research and Development||Defence Research and Development Organisation||DFMM||Office of DG(ECS)||LRDE
Department of Defence Research and Development||Defence Research and Development Organisation||DFMM||Office of DG(ECS)||LRDE
The Director
Karnataka QTY :

Items - Processing Visualisation and Avionics Software Development, Testing Integration and IVV Support

Tender Details
Costs
Documents
BOQ

BoQ1

Item Wise BoQ
BoQ_Ver4.0Item WiseNormalINR OnlyINR
Select, Excess (+), Less (-)
Tender Inviting Authority: DIRECTOR, LRDE, DRDO
Name of Work: "Processing, Visualisation and Avionics Software Development, Testing, Integration and IVV support" Qty 1 Job
Contract No: LRDE/MMFD-PUR/25-26/26ATT011
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder in Rs. P GST (If applicable in Percentage)GST Amount in Rs. PHSN / SAC CodeTOTAL AMOUNT excluding taxes in Rs. PTOTAL AMOUNT including taxes Rs. PTOTAL AMOUNT In Words
12345678910111278916171819202122232425262728293031323334353637383940414243444546474849501052111213
1"Processing, Visualisation and Avionics Software Development, Testing, Integration and IVV support" Qty 1 Job1Construction of chamber for 100mm sluices valveitem1101 Nos
1.01Processing, Visualisation and Avionics Software Development, Testing, Integration and IVV supportService 11.00Job0.00Excess(+)1Full ConversionINR0.000.000.000.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect%00 Zero Only
Quoted Rate in WordsINR Zero Only

Cost Breakup

Tender Inviting Authority: DIRECTOR, LRDE, DRDO
Name of Work:"Processing, Visualisation and Avionics Software Development, Testing, Integration and IVV support" Qty 1 Job
Contract No: Tender Enquiry No. LRDE/MMFD-PUR/25-26/26ATT011
Bidder Name :
COST BREAK UP
Sl NoItem Name Item CodeQty A/UUnit Price (Rs.)Total Basic Price (Rs.)GST(%)GST amount (Rs.)Total Price (Rs.)
1.1Software Requirement Stage a. Software Requirement for CSCIs i. System Segment Specifications (SSS) Document ii. Interface Design Description (IDD) Document iii. Software Integration Plan (SIP) Document iv. Software Requirement Document (SRD) for each CSCI v. Software Test Plan (STP) for each CSCI vi. Software Configuration Management (SCM) reports b. Software Requirement for Simulators i. Software Requirement Document (SRD) for each simulator ii. Software Test Plan (STP) for each simulator iii. Software Configuration Management (SCM) reports (soft copy of set to be provided in External storage device) Item 11set0.0000.00
1.2Design and Implementation Stage a. Design and Implementation for CSCI i. Software Source Code and executable for each CSCI ii. Software Architecture Design (SAD) for each CSCI iii. Software Design Document (SDD) for each CSCI iv. Unit Test Plan (UTP) Document for each CSCI v. Integration Test Plan (ITP) document for each CSCI vi. Parameter Data Item Document vii. Software Configuration Management (SCM) report viii. Traceability analysis report b. Design and Implementation Stage for Simulators i. Software Source Code and executable for each simulator ii. Software Architecture Design (SAD) document of each Simulator iii. SCM report (soft copy of set to be provided in External storage device) Item 21set0.0000.00
1.3Software Testing Stage a. Simulators Testing Stage i. Software Test Reports for each simulator ii. SCM reports b. Unit Testing Stage of CSCIs i. Unit Test Report (UTR) for each CSCI ii. Static and Dynamic Test Report for each CSCI iii. SCM reports iv. Traceability analysis report (soft copy of set to be provided in External storage device) Item 31set0.0000.00
1.4Integration Testing i. Integration Test Report for each CSCI ii. Software Test Reports (standalone) for each CSCI iii. Software Integration Report iv. SCM reports v. Code Coverage Analysis Report vi. End to End Consolidated Traceability matrix as per certification requirement vii. Requirement Coverage Analysis Report viii. VDD, SAS, SCI, and SECI (soft copy of set to be provided in External storage device)Item 41set0.0000.00
1.5Field Trial Support Software i. Visualisation and mission planning Software for field support ii. Software Requirement Document (SRD) iii. Software Test Plan (STP) iv. Software Test Report (STR) (soft copy of set to be provided in External storage device)Item 51set0.0000.00
2Total cost0.000.00
Note 1 : Total cost of Cost break up should match with the total cost in BOQ1
Note 2 : Only Colored cells to be filled. Other cells not to be edited