Items - CERTAIN REPAIR TO DRAINS AND CULVERTS AT DEFENCE LAB JODHPUR
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: ASSISTANT GARRISON ENGINEER (I) R&D JODHPUR | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work : Certain repair to drains & culverts at Defence Lab Jodhpur | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: AGE(I)R&D/JODH - OF 2025-26 Serial Page No ___ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder Name : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1.00 | Dismantling stone slab,interlocking paver blocks & tiles of any description or thickness in floors, aprons etc laid dry or laid dry and pointed, stacking serviceable material and removal unserviceable materials, debris and rubbish to a distance not exceeding 100m complete all as specified & directed by Engineer in charge. | 16.00 | Per 10 Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
2.00 | M&L machine cut stone slab 35 to 40 mm thick dressed true & square, in one length not less than 60 cm & n exc, 300 cm as in sun-shades, chajjas, shelves, cills, landings, cover stones for drains,manhole cover, templates, coping of boundary wall etc, set in cement mortar 1:4 complete all as specified & directed by Engineer-in-charge. | 20.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
3.00 | M&L Machine cut stone slab 75 mm thick dressed true & square, in one length not less than 60 cm & n exc, 300 cm as in sun-shades, chajjas, shelves, cills, landings, cover stones for drains,manhole cover, templates, coping of boundary wall etc, set in cement mortar 1:4 complete all as specified & directed by Engineer-in-charge. | 80.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
4.00 | S&F 7.50 cm thick sand stone slabs as in sun-shades, chajjas, shelves, cills, landings, cover stones for drains,manhole cover, templates, etc not exceeding 2m in length, punched dressed on face and along exposed edges, self faced on other side and set and pointed in cement mortar (1:4) complete all as specified & directed by Engineer-in-charge. | 40.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
5.00 | S&F 7.50 cm thick sand stone slabs as in sun-shades, chajjas, shelves, cills, landings, cover stones for drains,manhole cover, templates, etc not exceeding 2m in length, punched dressed on face and along exposed edges, self faced on other side and set and pointed in cement mortar (1:4) except stone slab complete all as specified & directed by Engineer-in-charge. | 20.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
6.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for | 1.00 | Qtl | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
7.00 | S&F Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 | 500.00 | Kg | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
8.00 | Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins arches, pillers etc but excluding ashlar facings, dressed stone work and precast concrete articles and removal of debris and rubbish to a distance not exceeding 100m complete all as specified & directed by Engineer-in-charge. | 17.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
9.00 | M&L squared rubble walling, Jodhpur type, regular courses, well bonded, bedded and solidly hearted, built in cement mortar (1:6) complete all as specified & directed by Engineer-in-charge. | 15.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
10.00 | M&L squared rubble walling, Jodhpur type, regular courses, well bonded, bedded and solidly hearted, built in cement mortar (1:6) except stone complete all as specified & directed by Engineer-in-charge. | 2.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
11.00 | Extra over stone walling for hammer dressing to face stones with maximum depression on face from a straight edge not exceeding 20mm & dressing face beds and joints as specified to squared rubble walling Jodhpur type brought up to courses or regular course complete all as specified & directed by Engineer-in-charge. | 30.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
12.00 | Racking out joints/ pointing to squared rubble masonry built in cement mortar or cement lime mortar, coursed or uncoursed in walls not less than 12mm deep, washing the joints, removing rubbish off the premises and keeping the surface to pointed or plastered wet for two days prior to re-pointing or plastering complete all as specified & directed by Engineer-in-charge. | 50.00 | 10 sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
13.00 | M&L keyed pointing in cement mortar (1:3) to squraded rubble masonary coursed or un coursed complete all as specified & directed by Engineer-in-charge. | 50.00 | 10 sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
14.00 | Taking down cement or cement lime plaster, any description on brick or stone walls/ceilings etc including racking out joints, hacking for key, scrubbing down with water etc removal of rubbish off the premises, removal and depositing where directed and leaving the site clean complete all as specified and directed by Engineer-in-charge. | 100.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
15.00 | M&L 15 mm thick , plaster in cement mortar (1:4) on stone masonry wall surfaces or surfaces other than fair faces of brick work or one side of lathing and finishing the surface even and smooth without using extra cement complete all as specified & directed by Engineer-in-charge. | 100.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
16.00 | M&L preparation of new plastered surfaces of wall and applying two coats of cement base paint complete all as specified and directed by Engineer-in-charge. | 100.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
17.00 | Demolition of cement concrete unreinforced in ground floors and pavings not exceeding 15cm thickness (below or above ground level) and removal unserviceable materials, debris and rubbish to a distance not exceeding 100m complete all as specified & directed by Engineer-in-charge. | 47.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
18.00 | M&L plain cement concrete (1:4:8) type D-2 using 40 mm graded crushed stone aggregate as in foundation, filling and mass concrete complete all as specified & directed by Engineer-in-charge. | 12.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
19.00 | M&L plain cement concrete 1:2:4 type B-0 using 20 mm graded crushed stone aggregate as in floors complete all as specified & directed by Engineer-in-charge. | 10.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||||
20.00 | M&L plain cement concrete (1:3:6) type C-2 using 40 mm graded crushed stone aggregate as in foundations,surface channels and drains, filling & mass concrete complete all as specified & directed by Engineer-in-Charge. | 10.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
21.00 | M&L precast cement concrete (1:2:4) type B-1 using 20 mm graded crushed stone aggregate as lintels,bressumers,steps,quoin blocks,string courses,copings,kneelers,apex stone,pier caps, columns ,posts, boundary pillers,bed plates,pintle blocks,ancho-rage blocks,boulders, corbels, brackets,etc with plain fair faces,including chamfers,weatherings,kerb stone ,throat-ing etc.and setting in cement mortar 1:4 complete all as specified & directed by Engineer in charge. | 5.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
22.00 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete complete all as specified & directed by Engineer in charge. | 10.00 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
23.00 | M&L preparing new plastered or unplastered surfaces of walls and applying two coats of synthetic enamel paint over a coat primer complete all as specified & directed by Engineer-in-charge. | 30.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
24.00 | M&L preparing old painted plastered or unplastered surfaces of walls and kerb stones and applying two coats of synthetic enamel paint complete all as specified & directed by Engineer-in-charge. | 370.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
25.00 | M&L preparing old plaster/ concrete/stone surfaces of walls by brooming down or steel wire brushing, scrapping down smoke soof, moulds, moss and efflorescent salts and trading oil and greasing spots and applying two coat of cement base paint complete all as specified & directed by Engineer-in-charge. Note :- Work will be executed up to 10.00 metre height quoted rate deemed to include scaffolding/ladders and safety equipments.. | 1500.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
26.00 | Complete removal of strains,dirts,black spots,insoluble black/white blooms visible on the rock face/keyed pointed jodhpur stone surfaces clean with chemical or scrubbing with steel brush washing and fresh water till original sand stone appearance comes complete all as specified & directed by Engineer-in-charge | 1000.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
27.00 | Cleaning grass,vegetation,saplings,shrubs,brushwood, undergrowth,roots,and trees not exceeding 30 cm girth(measured one metre above ground level) and removing rubbish upto a distance of 100 metres outside the periphery of the area under clearance complete all as specified and directed by Engineer in charge. | 1000.00 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |