Items - AS PER TENDER DOCUMENTS
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: CWE DEOLALI | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: PROVN OF INTERLOCKING TILES FROM BLACK TOP RD NEAR OP SHED TOWARDS SERVING POINT AT FIRING RANGE , SCHOOL OF ARTY UNDER GE DEOLALI | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: 86057/E8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Rs. P | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1 | Excavation over areas n exc 1.50 m deep and getting out in any type of soil complete all as specified and directed. | 139.00 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
2 | M & L for Moorum/red bajri filling in floors or pavings laid in layers n exc 15 cm thick watered and rammed to a true surface complete all as specified and directed. | 62.00 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
3 | M & L for Cement concrete 1:4:8 Type D-2 (using 40mm graded agg) as in sub base foundation filling and mass concrete complete all as specified and as directed. | 31.00 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
4 | M & L for hard core n exc 63mm (broken stone or boulders) deposite spread & levelled, water rammed to a true surface complete all as specified and directed | 31.00 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
5 | M & L for sand cushioning 25mm thick filling under floors including watering and consolidation complete all as specified and as directed. | 7.75 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
6 | M & L for glossy finish Machine pressed precast concrete interlocking paver block (two colour combination) any shape and size confirming to IS 15658-2006 of 60 mm thickness, M-35 Grade with grey cement & pigment complete all as specified and as directed. | 315.00 | Sqm | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
7 | M & L for PCC type B 1 (1:2:4) using 20 mm graded agg as in benching at edges, in roof kerbs or mud stops, rounded or chamfered on edges of the path for bonding of the tiles complete all as specified and as directed. | 2.00 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
8 | M&L for Brickwork with fly ash old size bricks, straight or curved on plan exc 6m mean radius, built in CM (1:6) complete all as specified and as directed. | 4.17 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
9 | M&L for rendering 15mm thick in CM 1:4 on brick or concrete surfaces rendering is to be finished even and smooth without using extra cement complete all as spd and directed. | 20.00 | Sqm | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
10 | Removal of surplus excavated soil to a distance n. exc. 50 m and depositing where directed at a level n. exc. 1.5 m above starting point complete. | 139.00 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
11 | M&L for preparing new plastered or un plastered surfaces of wall and applying three coat of white wash including prepretion of newly plastered surfaces complete. | 20.00 | Sqm | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | |||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Note :- Schedule of Credit of Amount Rs.NIL shall be deducted from total amount. |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |