Kerala QTY :

Items - TERM CONTRACT FOR ARTIFICERS WORKS FOR MD OTM ACCN AT RESIDENTIAL TECHNICAL AREAS UNDER AGE I R D KOCHI

Tender Details
Costs
Documents
BOQ

BoQ1

BoQ_Ver3.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: ASSISTANT GARRISON ENGINEER (I) R&D KOCHI
Name of Work: TERM CONTRACT FOR ARTIFICERS WORKS FOR MD/ OTM ACCN AT RESIDENTIAL / TECHNICAL AREAS UNDER AGE (I) R&D KOCHI
Contract No: 8383E8AGERDK
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQtyUnitsEstimated RateAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNTTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1Schedule of WorksBI01010001010000000000000515BI01000011121Construction of chamber for 100mm sluices valveitem1101 Nos
1.01Execution of works ordered by various work orders through requisitions placed (IAFW-1833) with limitation of amount as per terms and conditions of IAFW-2249 forming part of contract including errata 1 to 20 and amendments 1 to 49 all as per terms and conditions contained or referred to in the tender documents at the rates contained in the MES Standard Schedule of rates Part II - 2020 ( Rates) including amendments 1 to 122 including Preambles of Standard schedule of Rates part I-2009 (specification) including errata 1 to 3 for part-I complete all as specified and as directed by Engr-in-Charge. Note - (I) Tenderer shall insert percentage at the appropriate cell in this BOQ excel sheet (ii) Tenderer shall refer and select the option Excess (+) or less (-) to quote the percentage above or below SSR Part-II - 2020(Rates), if '0' % quoted the same shall be treated at par with SSR Part-II 2020(Rates). (iii) Amount inserted by the MES in respective column and the total amount reflected in this page is approximate and for reference only. Being Term Contract, work orders are priced at rates given in SSR and adjusted by the percentage quoted by the contractor on this page. (iv) The cumulative amount of work orders shall not exceed the amount mentioned in notice of tender. BI01010001010000000000000515BI01000011131.00Twelve Months100.00Excess(+)1Full ConversionINR100.00100.0000INR One Hundred Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
1.02Execution of works ordered by various work orders through requistions placed (IAFW-1833) with limitation of amount as per terms and conditions of IAFW-2249 forming part of contract including errata and amendments as applicable there to, all as per terms and conditions contained or referred to in the tender documents at the rates contained in the MES Standard Schedule of rates Part II - 2010 ( Rates) and Preambles of Standard schedule of ates part I-2009 (specification including errata nd amendments as applicable thereto complete all as specified and as directed by Engr-in-Charge. Note - (I) Tendderr shall insert percentage at the 4th row and under F column of this BOQ excel sheet (ii) Tenderer shall refer and selct the option Excess (+) or less (-) to quote the oercentage above or below SSR Part-II - 2010(Rates), if '0' % quoted the shall be treated at par with SSR Part-II 2010(Rates). (iii) Amount inserted by the MES at eigth row under column 'E' and the total amount reflected in this page is approximate and for reference only. Being Term Contract worrk is priced at rates goven in SSR and adjusted by the percentage quoted by the contractor on this page.BI01010001010000000000000515BI010000111425.0000Nos300.0000Excess(+)1Full ConversionINR7500.00007500.0000INR Seven Thousand Five Hundred Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.03Execution of works ordered by various work orders through requistions placed (IAFW-1833) with limitation of amount as per terms and conditions of IAFW-2249 forming part of contract including errata and amendments as applicable there to, all as per terms and conditions contained or referred to in the tender documents at the rates contained in the MES Standard Schedule of rates Part II - 2010 ( Rates) and Preambles of Standard schedule of ates part I-2009 (specification including errata nd amendments as applicable thereto complete all as specified and as directed by Engr-in-Charge. Note - (I) Tendderr shall insert percentage at the 4th row and under F column of this BOQ excel sheet (ii) Tenderer shall refer and selct the option Excess (+) or less (-) to quote the oercentage above or below SSR Part-II - 2010(Rates), if '0' % quoted the shall be treated at par with SSR Part-II 2010(Rates). (iii) Amount inserted by the MES at eigth row under column 'E' and the total amount reflected in this page is approximate and for reference only. Being Term Contract worrk is priced at rates goven in SSR and adjusted by the percentage quoted by the contractor on this page.BI01010001010000000000000515BI010000111520.0000Nos10.0000Excess(+)1Full ConversionINR200.0000200.0000INR Two Hundred Only2Construction of chamber for 100mm sluices valveitem310Nos
1.04Execution of works ordered by various work orders through requistions placed (IAFW-1833) with limitation of amount as per terms and conditions of IAFW-2249 forming part of contract including errata and amendments as applicable there to, all as per terms and conditions contained or referred to in the tender documents at the rates contained in the MES Standard Schedule of rates Part II - 2010 ( Rates) and Preambles of Standard schedule of ates part I-2009 (specification including errata nd amendments as applicable thereto complete all as specified and as directed by Engr-in-Charge. Note - (I) Tendderr shall insert percentage at the 4th row and under F column of this BOQ excel sheet (ii) Tenderer shall refer and selct the option Excess (+) or less (-) to quote the oercentage above or below SSR Part-II - 2010(Rates), if '0' % quoted the shall be treated at par with SSR Part-II 2010(Rates). (iii) Amount inserted by the MES at eigth row under column 'E' and the total amount reflected in this page is approximate and for reference only. Being Term Contract worrk is priced at rates goven in SSR and adjusted by the percentage quoted by the contractor on this page.BI01010001010000000000000515BI01000011161.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.05b) CI bend 22.5° (250mm dia)BI01010001010000000000000515BI01000011171.5645Nos50.0000Excess(+)1Full ConversionINR78.225078.2250INR Seventy Eight and Paise Twenty Two Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
2Execution of works ordered by various work orders through requistions placed (IAFW-1833) with limitation of amount as per terms and conditions of IAFW-2249 forming part of contract including errata and amendments as applicable there to, all as per terms and conditions contained or referred to in the tender documents at the rates contained in the MES Standard Schedule of rates Part II - 2010 ( Rates) and Preambles of Standard schedule of ates part I-2009 (specification including errata nd amendments as applicable thereto complete all as specified and as directed by Engr-in-Charge. Note - (I) Tendderr shall insert percentage at the 4th row and under F column of this BOQ excel sheet (ii) Tenderer shall refer and selct the option Excess (+) or less (-) to quote the oercentage above or below SSR Part-II - 2010(Rates), if '0' % quoted the shall be treated at par with SSR Part-II 2010(Rates). (iii) Amount inserted by the MES at eigth row under column 'E' and the total amount reflected in this page is approximate and for reference only. Being Term Contract worrk is priced at rates goven in SSR and adjusted by the percentage quoted by the contractor on this page.BI01010001010000000000000515BI01000011181.0000Nos20.0000Excess(+)1Full ConversionINR20.000020.0000INR Twenty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
3Construction of chamber for 100mm sluices valveBI01010001010000000000000515BI01000011191.0000Nos20.0000Excess(+)1Full ConversionINR20.000020.0000INR Twenty Only2Construction of chamber for 100mm sluices valveitem310Nos
4Supplying, Conveying and fixing spls. Including eaBI01010001010000000000000515BI01000011201.0000Nos21.0000Excess(+)1Full ConversionINR21.000021.0000INR Twenty One Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
5Supplying, Conveying and fixing spls. Including eartBI01010001010000000000000515BI01000011211.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
6Construction of chamber for 100mm sluice platesBI01010001010000000000000515BI01000011221.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
7Construction of chamber for 100mm sluices valveBI01010001010000000000000515BI01000011231.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only2Construction of chamber for 100mm sluices valveitem310Nos
8Laying and Jointing PVC Pipe. HeadingBI01010001010000000000000515BI01000011243Supplying, Conveying and fixing spls. Including eaitem410Nos
8.01Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using BI01010001010000000000000515BI01000011251.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
8.02Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including costBI01010001010000000000000515BI01000011261.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
8.03Construction of chamber for 100mm sluices valveBI01010001010000000000000515BI01000011271.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only2Construction of chamber for 100mm sluices valveitem310Nos
9The Total value of Schedule1BI01010001010000000000000515BI01000011281.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
10The Total value of Schedule4BI01010001010000000000000515BI01000011291.0000Nos10.0000Excess(+)1Full ConversionINR10.000010.0000INR Ten Only4Construction of chamber for 100mm sluice platesitem510Nos
Total in Figures100.008029.2250INR One Hundred Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.0000INR Zero Only
Quoted Rate in WordsINR Zero Only