Items - REPAIRS AND MAINTENANCE OF HT LT UNDERGROUND CABLES EARTHING AND REPAIR AND MAINT OF AVR SUBSTATION HT PRIMARY PROTECTION RELAYS HT VCB OCBs RMUs TRANSFORMERS CAPACITOR BANK VOLTAGE STABILIZERS OF VARIOUS CAPACITIES AND PREVENTIVE ALLIED WORKS AT
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: GARRISON ENGINEER (I) R&D (EAST), BANGALORE-560093 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: REPAIRS AND MAINTENANCE OF HT / LT UNDERGROUND CABLES, EARTHING AND REPAIR AND MAINT OF AVR SUBSTATION, HT PRIMARY PROTECTION / RELAYS, HT VCB / OCBs, RMUs TRANSFORMERS, CAPACITOR BANK, VOLTAGE STABILIZERS OF VARIOUS CAPACITIES AND PREVENTIVE ALLIED WORKS AT GTRE BANGALORE. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: GE (I) R&D (EAST)/TOKEN/52 OF 2025-2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder Name : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT With Taxes | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 3 | 4 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 5 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 6 | 54 | 7 |
1.00 | Supply and fix HT digital display voltmeter suitable for HT OCBs, HT VCBs at various substation suitable for HT panel 1100 / 100 volts (auxiliary volts) including necessary connections and taking out old unserviceable complete all as specified and as directed. | 20.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
2.00 | Supply and fix HT digital type Ammeter suitable for CT ratio 50 / 100 / 200 Amps including necessary connections and taking out unserviceable ammeter complete all as specified and as directed. | 20.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
3.00 | Excavation in trenches n.exc. 1.5m wide and n.exc. 1.5m in depth for laying cables / poles foundation / stay assembly and getting out in hard / dense soil complete all as specified and as directed. | 200.00 | CUBIC METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
4.00 | Removing excavated material not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and as directed. | 63.00 | CUBIC METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
5.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers n.exc. 25cm thick complete all as specified and as directed. | 137.00 | CUBIC METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
6.00 | Material and labour for sand cushioning to under ground cable providing with a layer 8cm thick before laying the cable and 15 cm thick after laying the cable complete all as specified and as directed. NOTE : Punned thickness only will be measured for the purpose of payment. | 56.00 | CUBIC METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
7.00 | Material and labour for un-reinforced pre cast concrete covers class HV type 300mmx 180mm x 40mm size factory made for cable protection complete all as specified and as directed. | 1200.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
8.00 | Material and labour for un-reinforced pre cast concrete covers class LV type 250mm x 150mm x 40mm size factory made for cable protection complete all as specified and as directed. | 3300.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
9.00 | Material and labour for filtration / dehydration of transformer oil including checking di-electric strength of oil before and after filtration for transformers located in GTRE area with suitable machine having filtration, heating and pumping facility to improve the dielectric strength/ insulation value of oil complete all as specified and as directed. NOTE :- (i) Di-electric strength of oil after filtration/ dehydration shall not be less than 60 KV/min. (ii) The contactor shall take shut down orders in working before commencement of the work in writing from Engineer-in-Charge. (iii) The contractor shall ensure no wastage of existing transformer oil. (iv) The di-electric strength of oil shall be tested before & after filtration and test results shall be submitted to Engineer-in-Charge. (v) The contractor shall ensure that the conservator tank are full to its level before starting the dehydration. | 26000.00 | LITRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
10.00 | Supply and filling new transformer oil for topping up the transformers duly filtered with filtration plant having dielectric strength not less than 60 KV complete all as specified and as directed. [MAKE : POWEROIL / ELECTROL / SERVO]. NOTE :- (a) The transformer oil shall be type EHV confirming to IS - 335/1983. (b) Mineral oil grade shall be used. (c) The IR value of transformer oil shall not be less than 60KV/min. (d) The unit rate shall be deemed to include the cost of filtration to achieve desired di-electric strength. | 1050.00 | LITRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
11.00 | Maintenance/servicing of existing transformer of capacity up to 500 KVA including following works / operations all as directed and to the entre satisfaction of Engineer-in-Charge :- (a) Opening of top plate after disconnection from HT/LT side. (b) Decaning of old transformer oil & keeping it for reuse after centrifuging to required dielectric strength as per IS schedules (c) Checking maintenance of all internal parts as HT/LT coils of all places, HT bushing, internal electrical connections, tap changing gear box. (d) Internal cleaning of tank by taking of complete coil/core of transformer outside and also cleaning of cooling tubes and make it free from sludge deposition. (e) Refilling of oil after repairs / maintenance work. (f) Change of cork Gasket of top cover. (g) Taking meggar value by applying not less than 5000 Volts meggar on HT side and not more than LT side from 500 Volts meggar & recording results. (h) Change of silica jel and glass of oil level indicator of cover both. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
12.00 | All as per Sl Item No 11 above but of capacity above 500 KVA to 750 KVA | 15.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
13.00 | All as per Sl Item No 11 above but of capacity above 750 KVA to 2000 KVA | 12.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
14.00 | Material and labour for opening and dismantling of all electrical connection from buck /boost transformer of 11/11 KV capacity 4 MVA for servicing purpose for checking of complete bushing assy including removing leakage of oil / replacement of top gasket and assembling the same after servicing and complete testing of buck /boost transformer by the authorized company representative and test certificate shall be furnished all as directed by the Engineer-in-Charge. (a) Insulation resistance test (b) Oil temperature alarm trip (c) Winding temperature alarm trip (d) Bucholtz relay alarm trip (e) Low oil level alarm trip (MOG) (f) Vector group (g) Di-electric test of transformer oil (h) Short circuit test (j) Magnetic core balance test (MBT) | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
15.00 | Material and labour for opening of all electrical connections from 11 KV automatic voltage regulator and drain out complete oil from the tanks for servicing purpose including opening of top cover and lift the core with help of crane carefully for servicing purpose including servicing of three Nos synchronising motor for its better functioning including testing of carbon roller assembly / cleaning of control contact assembly and replacement of the same if required and replacement of minor worn out parts and replacing of top gas kit complete and reassembling the same including making all connection and testing complete for entire satisfaction of Engineer-in-charge. NOTE :- (i) Rate quoted by the contractor shall be deemed to include for repairing of AVR at site only. (ii) Major parts replaced shall be paid separately under relevant items of this BOQedule. (iii) Test certificate shall be provide by the contractor after serving job done. | 2.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
16.00 | Supply and fix in replacement of step synchronise motor with gear box assembly and shaft sprocket 1 Ph, 230 v, 50 Hz, 10/15 RPM suitable for 11 KV AVR complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
17.00 | Supply and fix in replacement of electronic Auto control PCB suitable for 11 KV Automatic voltage regulator including removing the unserviceable one and making all connections as per existing complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
18.00 | Supply and fix in replacement of flip flop relay suitable for 11 KV automatic voltage regulator complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
19.00 | Supply and fix in replacement of carbon roller assembly of 11 KV automatic voltage regulator including making all connection and testing complete all as specified and as directed. | 20.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
20.00 | Supply and fix in replacement tag and tail with sleeving of 11 KV automatic voltage regulator including making all connection and testing complete all as specified and as directed. | 20.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
21.00 | Supply and fix in replacement of pneumatic type on delay timer working on 230V 50 HZ of 11 KV automatic voltage regulator including making all connection and testing complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
22.00 | Material and labour for taking out bottom trolley of HT OCB / VCB11 KV 400 / 800 Amps capacity after disconnecting power supply and carrying out servicing and maintenance of operating mechanism, latch assembly spring mechanism, checking of electrical control wiring of OCB/VCB and checking for proper functioning of shunt trip coil, lubricating of all moving parts and checking /cleaning of alignment of moving contacts with fixed contact assembly for proper functioning of operation, reassembling of bottom trolley of HT OCB fixed in it's original position and testing for smooth functioning complete all as specified and as directed. | 30.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
23.00 | Material and labour for calibration of IDMT relays set of three, through relay test kit including other required measuring equipment to the site by secondary injection method and testing for proper functioning / tripping systems of relays complete all as specified and as directed. NOTE :- The rate quoted by the contractor is deemed to be included for quarterly checking of relays in VCB/OBC for its proper setting/functioning and tripping of VCB/OCB during over load/earth fault. | 20.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
24.00 | Supply and fix HT current transformer of capacity 200 / 100 / 5-5 including testing and commissioning of through primary injection method with suitable testing kit and also checking the control panel wiring including setting the CT range with relays setting for proper functioning/tripping and taking out old unserviceable CT complete all as specified and as directed. | 3.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
25.00 | Supply and fix in replacement of moving contact assembly suitable for HT OCB/VCB 11 KV 400 Amps to 800 Amps OCB including dismantling the old unserviceable moving contact assembly suitable for HT OCB complete all as specified and as directed. | 8.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
26.00 | Supply and fix in replacement of big and small end bearing of HT 11 KV VCB trolley including replacement of complete locking mechanism with integral spring charging handle for manual spring charge and replacement of closing coil and tripping coil 24V DC including replacement of electro magnetic relay, coil rating 220 V, AC complete all as specified and as directed. | 1.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
27.00 | Supply and fix vaccum Interpture bottol for the existing HT VCB including taking out old unserviceable vaccum Interputure bottol complete all as specified and as directed. | 2.00 | EACH SET OF THREE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
28.00 | Supply and fix spring charging motor for 11 KV VCB suitable for the existing make including taking out old unserviceable one complete all as specified and directed. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
29.00 | Supply and fix in replacement of current transformer moulded in epoxy compound with dual ration 50/25/5 Amps complete connection with copper wire including beading as per existing VCB 11 KV at site complete all as specified and as directed. | 2.00 | EACH SET OF THREE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
30.00 | Dismantling and removing of defective transformer removing to workshop for repairs, opening up and taking out coil, core and core assembly for estimation of repair and damaged parts cleaning / washing of tanks and removing the dust from all parts including cores, tanks, cooling tubes, removal of damaged parts making connection and assembling complete in all respects after repairs/ replacement of coils, gasket, sheet, nuts and bolts, refilling of transformer oil, installation and testing on full load for testing for 11 KV capacity from 630 KVA to 1250KVA complete all as specified and directed by the Engineer-in-Charge. NOTE :- Spare parts and winding coils as mentioned under respective items of BOQ shall be measured and paid for separately as supply only. These shall be identical to those specified by original manufacturer. | 1.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
31.00 | Dismantling carefully, material and labour for rewinding the LT / HT side (primary winding / secondary windings) of the transformer with copper winding (wire / strip)of suitable gauge or to match the existing including refixing, connecting, testing and commissioning the transformer complete all as specified and as directed. | 120.00 | KILO GRAM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
32.00 | Supply and fix in repairs HT bushing rod complete with insulator and packing suitable for out door/Indoor type 630 KVA to 1250 KVA transformers confirming to IS-334 complete with nut, bolts, brass studs and gasket of synthetic rubber bonded cork sheet complete all as specified and directed by Engineer-in-Charge. | 2.00 | SET OF THREE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
33.00 | Supply and fix in repairs LT bushing complete with insulator and packing suitable1100 volt grade complete with nut bolts, brass studs, insulator and gasket etc suitable for 630 to 1250 KVA out door/Indoor transformer. NOTE FOR SL ITEM No. 32 & 33 :- (i) Rates quoted by the contractor shall be deemed to include for opening of top plate of transformer / decanning of oil from transformer of the level as per requirement and assemble the same after replacement of bushing rod. (ii) Bushing rod shall be replaced at site. transformer will not be allowed to send to workshop at any cost and all bushing replacement work shall be executed at site only. | 3.00 | SET OF FOUR | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
34.00 | Supply and fix air breather complete with silica gel suitable for out door type step down power transformer up to 500 KVA to 1250 KVA complete all as specified and as directed. | 25.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
35.00 | Material and labour for spray painting of distribution transformer with two coats of synthetic enamel paint of smoke grey colour after neatly cleaning and preparing the surface for spray painting the transformer of the following capacity including writing SM / MES No (5 cm height) with white enamel paint of capacity 1200 KVA to 2000 KVA complete all as specified and as directed. | 7.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
36.00 | All as per Sl Item No. 35 above but of capacity 750 KVA to 1000 KVA | 7.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
37.00 | All as per Sl Item No. 35 above but of capacity 500 KVA to 630 KVA | 16.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
38.00 | All as per Sl Item No. 35 above but of capacity 4000 KVA. | 2.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
39.00 | Material and labour for cutting of black top cover of existing road up to 1 mtr depth and 1mtr wide for laying of UG cable and pipe line, refilling and making good after laying UG cable and pipe line with PCC (1:3:6) up to 30 Cm from top of the road surface complete all as directed by Engineer-in-Charge. | 5.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
40.00 | Material and labour for opening of electrical connections from existing ACB upto 2500 Amps and to draw out / fixed type from the existing panel for servicing purpose of all mechanical parts / cleaning / lubricating of all parts including fixing the same in the panel and testing for entire satisfaction of Engineer-in- Charge. | 6.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
41.00 | Supply and fix tripping coil of Air circuit breaker upto 2500 Amps as per existing make and model 220 / 440 volts complete all as specified and as directed. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
42.00 | Supply and fixing of moving contact circuit breaker upto 2500 Amp as per existing make and model complete all as specified and as directed. | 6.00 | SET OF THREE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
43.00 | Supply and fixing of fixed contact circuit breaker upto 2500 Amp as per existing make and model complete all as specified and as directed. | 2.00 | SET OF THREE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
44.00 | Material and labour for finding out the cable fault of any size of cable upto 11 KV underground cable (HT and LT and of any capacity of cable with the help of cable fault locator mounting on vehicle and with necessary disconnection of cable from two ends and making connection by jointing after repairs and having the following items with electrician at site to find fault of up to length of 10 KM cable complete all as specified and directed by Engineer-in-Charge with help of the following accessories- (a) Surge Generator with accessories (b) Head Phone (c) Pin Point Set T-505 with accessories (d) Earthing cable with clamp (e) Cable fault Locator T-905 with accessories (f) TC-808 with accessories (g) Soldering Iron/wire/capacitor unit/capacitor connecting cables/ power cable/nose plier. NOTE :- Excavation for the cable fault shall be done by the contractor by his own arrangement and quoted rates are deemed to include this element. | 6.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
45.00 | Material and labour for opening of all connection of electric power cable of any size from the electrical panel, cleaning and replacing of aluminium lugs of existing cable of size upto 400 sq.mm upto 20 Nos in each panel and checking of all electrical wiring of panel and servicing of bus bar strip changing etc., and tightening of nuts and bolts and making all connection as per original including testing for entire satisfaction of Engineer-in-Charge. | 10.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
46.00 | Earthing complete with galvanised iron plate electrode 600 x 600 x 6.00mm thick GI earthing lead burried directly in ground vertically to a depth not less than 2.25 mtr deep below GL with the top edge of the plate at a depth not less than 1.5 mtr from below normal GL, connected to and including Galvanised iron strip 32x6 mm as earthing lead by means of nuts, bolts, washers, checknuts of galvanised iron and connected to earthing test point all as shown in electric plate No. 3 of SSR Part l of 2010 and as specified or indicated and testing on completion including excavation / earth work in any type of strat PCC (1:3:6) type C1 earthing chamber, pre cast slab 50 mm thick in cement concrete (1:2:4) type B1 (Reinforced with welded steel wire fabric (XPM)) weight not less than 4 Kg/sqm,cast iron frame, funnel with wire mesh, including GI earth strip with GI protection pipe of 40mm medium grade 7.5 meter long etc complete and testing on completion all as specified and directed. NOTE :- (i) Rate quoted shall deemed to include cost of excavation in any type of strata, RFR and removal upto 50metre, PCC pit, funnel and RCC cover plate. (ii) GI strip above 7.5m will be measured and paid separately. (iii) Earth resistance not exceeding 1.0 ohm. | 8.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
47.00 | Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 32 x 6 mm galvanised iron or steel wire complete all as specified and as directed. | 60.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
48.00 | Supply and fix in replacement MD XL type 10 KVAR to 20 KVAR capacitor 440 volt, 3 Phase, , voltage test between terminals 1.75 rated volt including taking out unserviceable complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
49.00 | All as per Ser Item No-48 but 25 KVAR | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
50.00 | Supply and fix steel MCCB enclosure on wall suitable for fixing of MCCB of 3 pole/4 pole cap upto 250 AMP complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
51.00 | Supply and fix steel MCCB enclosure suitable for fixing of MCCB of 3 pole / 4 pole capacity upto 315 Amps to 630 Amps complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
52.00 | Material and labour for repair of LT panel board by replacement of broken / un serviceable front door of LT panel made out of 3.15mm thick MS sheet to shape for proper closing the front door in two parts inclusive making locking arrangements of LT panel and welding of new hinges including spray painting of panel board complete all as specified and as directed. | 10.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
53.00 | Trimming of tree / branches including cutting of grass at substation and surrounding upto 5 Mtr radius and removing the grass and branches and transporting the same out side the labs complete all as specified and as directed. | 20.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
54.00 | Supply and fixing distilled water best quality suitable for lead acid battery complete all as specified and as directed. | 80.00 | LITRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
55.00 | Maintenance and servicing of battery panel 220/110/30/24 V DC with batteries and its control Panels wiring, PCB, Relays and terminal cables with replacement of defective parts complete all as specified and as directed. | 3.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
56.00 | Supply, install, testing and commissioning maintenance free (SMF) lead acid battery, 2 volts, comprising of maintenance free batteries of reputed make complete with all accessories including taking down old unserviceable battery from battery bank complete all as specified and as directed. | 30.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
57.00 | Material and labour for replacement of unserviceable battery 12 V, 180 AH with maintenance free battery 12 Volt initially charged complete all as specified and as directed. | 6.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
58.00 | Material and labour for servicing of 415 Volts electrical panel indoor /outdoor type for cleaning of dust particle inside the panel like MCCB, relay / contactor with help of blower etc and tightening of all electrical connection and complete testing and replacement of burnt lugs etc complete all as specified and as directed. | 30.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
59.00 | Supply and fix cable route indicator comprises and made out of PCC pole (0.3 x 0.3 x 1.5 Mtr) on HT cable 1 mtr in depth grouted in the ground with suitable PCC (1:3:6) concrete base with writing HT CABLE JOINT complete all as specified and as directed. | 30.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
60.00 | Supply and fix flanged Gate valve of size 100 mm dia for the existing Transformer for including taking out old unserviceable valves complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
61.00 | Supply and fix flanged Gate valve size 50 mm dia for the existing Transformer for including taking out old unserviceable valves complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
62.00 | Supply and fix flanged gate valve size 25 mm dia for the existing Transformer for including taking out old unserviceable valves complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
63.00 | Supply and refilling of SF6 (Sulfur hexafluoride gas ) for 11 KV RMU SF6 outdoor circuit breaker to cool and Quench the arc on opening of circuit transmission class for normal operation to maintain the desired pressure in SF6 and RMU as per OEM design and testing the pressure of each SF6 breaker 11 KV RMU complete all as specified and as directed. | 5.00 | KILO GRAM | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
64.00 | Material and labour for maintenance, servicing and repair of 4 way RMU panel SF6 breaker/ load break switch HT 11KV 400 Amps / 800Amps, 50 cycles, internal moving and fixed parts, contacts / wiring, cleaning, dusting, decarbonising, tightening loosened parts, checking of closing / tripping system, lubricating greasing all moving parts, including replacing worn out part copper studs, bolts, nuts and washers replacing control wiring, replacing oil, busbar contacts fixed or moving contacts, HT bush, gasket including unserviceable coil, replacing of defective minor items such as indicators lamp, push button, selector switch etc as and when required complete all as specified and as directed. NOTE :- The item spare parts shall be replaced measured and paid separately, However minor items such as indicator, push button, selector switch, gasket, wiring cable shall be deemed to be included in the unit rate. | 1.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
65.00 | All as per Sl Item No. 64 above but 6 way RMU all as specified and directed. | 1.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
66.00 | All as per Sl Item No. 64 above but 9 way RMU all as specified and directed. | 1.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
67.00 | Supply and installing 100mm width x 50mm depth x 1.6mm thickness size of perforated hot dipped Galvanised Iron cable tray (Galvanisation thickness not leass than 50 microns) with perforation not more than 17.5% inconvenient sections, jointed with connectors, suspended from the ceiling with GI suspenders including GI Bolts & nuts as required all as specified by Engineer-in-Charge. NOTE : 1. All necessary fixing/ connecting arrangements of nut, bolt, MS rod, to be provided by the contractor without any extra payment from department. 2. Quoted rate is to be deemed the charges of necessary boom lift. | 50.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
68.00 | Supply and laying in replacement XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 400 sq.mm 3.5 Core including taking up existing old unserviceable LT UG cable complete all as specified and as directed. | 80.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
69.00 | All as per Sl Item No- 68 above but of size 300 sq.mm 3.5 core | 80.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
70.00 | All as per Sl Item No- 68 above but of size 240 sq.mm 3.5 core | 80.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
71.00 | All as per Sl Item No-68 above but of size 185 sq.mm 3.5 core | 100.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
72.00 | All as per Sl Item No- 68 above but of size 120 sq.mm 3.5 core | 100.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
73.00 | All as per Sl Item No- 68 above but of size 95 sq.mm 3.5 core | 100.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
74.00 | All as per Sl Item No- 68 above but of size 70 sq.mm 3.5 core | 100.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
75.00 | All as per Sl Item No- 68 above but of size 50 sq.mm 3.5 core | 80.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
76.00 | Supply, laying and testing in replacement of cable XLPE insulated screened PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) with stranded aluminum conductor,11000 volts grade, of size 3 core 95 sq.mm including taking out of old HT cable from trenches all as specified and directed by Engineer-in-Charge. | 60.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
77.00 | All as per Sl Item No-76 above 120 sq.mm 3 core | 60.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
78.00 | All as per Sl Item No-76 above 185 sq.mm 3 core | 60.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
79.00 | Supply and fix cable jointing kit 11 KV cable for indoor termination heat shrink type joint complete jointing material and accessories suitable for 3 core XLPE armoured aluminum conductor cable of size 50 to 95 sq.mm complete all as specified and as directed. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
80.00 | Supply and fixed cable jointing kit 11 KV cable for outdoor termination heat shrink type joint complete joint material and accessories suitable for 3 core XLPE armoured aluminum conductor cable of size 50 sq.mm to 95 sq.mm complete all as specified and as directed. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
81.00 | Supply and fix cable jointing kit 11 KV cable for indoor termination heat shrink type joint complete joint material and accessories suitable for 3 core XLPE armoured aluminum conductor cable of size 120 to 185 sq.mm complete all as specified and as directed. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
82.00 | Supply and fixed cable jointing kit 11 KV cable for outdoor termination heat shrink type joint complete joint material and accessories suitable for 3 core XLPE armoured aluminum conductor cable of size 120sq.mm to 185 sq.mm complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
83.00 | Supply and fix cable jointing kit for 11 KV grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE, armoured, aluminum conductor cable of size 120 sq.mm to 185 sq.mm, Indoor/Outdoor type complete all as specified and as directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
84.00 | Supply and fix in repairs LT Air circuit breaker manual draw-out type circuit breaker thermal magnetic DN1 four pole 1250 Amps capacity of 50 KA breaking capacity in existing panel board including modification if required to accommodate the ACB with necessary connections with existing bus bar with suitable lugs, nuts, bolts, washers etc including testing commissioning complete and taking out existing unserviceable ACB of any capacity complete all as specified and as directed. | 1.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
85.00 | Supply and fixing in repairs LT Air circuit breaker fixed type circuit breaker thermal magnetic DN1 four pole 1250 Amps capacity of 50 KA breaking capacity in existing panel board including modification if required to accommodate the ACB with necessary connectiong with existing bus bar with suitable lugs, nuts, bolts, washers etc including testing commissioning complete and taking out existing unserviceable ACB of any capacity complete all as specified and as directed. | 1.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
86.00 | Supply and fixing in repair LT Air circuit breaker fixed type circuit breaker thermal magnetic DN1 four pole 2500 Amps capacity of 50 KA breaking capacity in existing panel board including modification if required to accommodate the ACB with necessary connectiong with existing bus bar with suitable lugs, nuts, bolts, washers etc including testing commissioning complete and taking out existing unserviceable ACB of any capacity complete all as specified and as directed. | 1.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
87.00 | Supply and fix in repair Moulded Case Circuit Breakers for Distribution Network with thermal magnetic release type DPX 250 3 pole 100 Amps capacity 16 KA rupturing capacity in existing panel board including modification on existing panel if required, necessary connectioning with copper strips/suitable size of copper conductor wire from bus bar, provision of suitable size of copper lugs as per the out going cable including taking down unserviceable MCCB complete all as specified and as directed. | 4.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
88.00 | All as per Sl Item No 87 above but 3 pole 160 Amps 36 KA complete all as specified and directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
89.00 | All as per Sl Item No 87 above but 4 pole 200 Amps 36 KA complete all as specified and directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
90.00 | All as per Sl Item No 87 above but 4 pole 250 Amps 36 KA complete all as specified and directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
91.00 | All as per Sl Item No 87 above but 4pole 400 Amps 36 KA complete all as specified and directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
92.00 | All as per Sl Item No-87 above but 4 pole 630 Amps 50 KA complete all as specified and directed. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
93.00 | Supply and laying synthetic insulating mat of size 2.00 Mtr x 1.00 Mtr x 2.5 mm thick suitable for upto 33KV grade complete all as specified and as directed. | 8.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
94.00 | Supplying, spreading & leveling graded course stone aggregate of 40 to 80 mm size to the existing sub station complete all as specified and as directed. NOTE :- Aggregate nominal size without any vegetation or chemical including levelling/spreading surrounding transformer, HT/LT 2/4 pole structure and LT/HT panel complete all as directed . | 4.00 | CUBIC METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
95.00 | Material and labour for copper earth continuity main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit of size 20 x 3 mm complete all as specified and as directed. | 20.00 | RUNNING METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
96.00 | Material and labour for earthing complete with copper earth plate of size 600 x 600 x 3.15 mm buried directly in ground (earth pit not less than 3 mtr deep below ground level) with top edge of the plate not less than 2.1m below normal ground level, connected to and including copper earth strip of 20x3mm by means of riveting and brazing and protected by GI pipe light grade of suitable size up to the test point , ie upto 7.5m, including providing alternate layers upto full volume of pit by charcol dust and common salt, magnesium sulphate and vegetable soil all around the plate 15cm depth and width minimum including PCC pit chamber, watering pipe of 50mm dia medium grade HI pipe upto the top of the plate having funnel complete and RCC cover, connecting to the test point and testing on ground complete and including excavation and earth work in any type of strata and cleaning of site all as specified and as directed in MES SSR Part-I and directed NOTE :- (i) Rate quoted shall deemed to include cost of excavation in any type of strata, RFR and removal upto 50metre, PCC pit, funnel and RCC cover plate. (ii) Copper strip above 7.5m will be measured and paid separately. 3. Earth resistance not exceeding 1.0 ohm. | 2.00 | EACH | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
97.00 | Supply and fix MES sub station boards of size 4' x 3' feet with stainless steel 50mm pipe supported in ground aprox 6 feet height errected in earth with cement concrete, including excavation as required, with superior quality ACP boards with radium / reflective blue letters with maximum 70 letters with maximum size in English with stainless steel frame work complete with fixing of LED fittings inside the board including the complete wiring work with complete connection all as directed and specified by Engineer-in-Charge. NOTE :- Display letter for the boards will be ' name of installation' and "location" all as directed. | 2.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
98.00 | Supply and fix one side retro reflective sign boards, made of 3mm thick coloured ACP (Aluminium composite panel) sheet of make Alstrong /Aludecor /Alucobond/Eurobond/Armstrong as approved by GE, including writing / pasting of words / figures / numbers / logos of any size / pattern & height with self adhesive reflective transparent prismatic engineering grade tape (Radium tape) of approved make complete including stainless steel frame work all as specified and as directed. NOTE :- (i) The words / figure /number/ logos shall be computer aided machine cut. (ii) Earthwork & excavation if necessary will be measured and paid for under respective items. (iii) Quoted rate shall include for necessary scaffolding etc for fixing of board at required height. | 6.00 | SQUARE METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
99.00 | Supply and fix MES sub station boards of size 4' x 2' feet with SS 50mm pipe supported in ground aprox 6 feet height errected in earth with cement concrete, including excavation as required, with superior quality ACP boards with radium/reflective blue letters with maximum 70 letters with maximum size in English with stainless steel frame work complete all as specified by directed by Engineer-in-Charge. NOTE :- Display letter for the boards will be ' name of installation' and "location" all as directed. | 2.00 | EACH JOB | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.00 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |