Bidhelp
Dte General Border Roads Organisation||HQ CE(P) Vartak(Tezpur) - BRO
Dte General Border Roads Organisation||HQ CE(P) Vartak(Tezpur) - BRO
Chief Engineer Project Vartak
Assam QTY :

Items - PROVIDING , LAYING AND COMPACTION OF WBM , SAND BLANKETING AND ILC BLOCKS (M-50 GRADE) BETWEEN KM 0.910 TO KM 12.000 ON NELYA- DHAULA ROAD FOR SURFACING WORKS UNDER 42 TF SECTOR OF PROJECT VARTAK IN ARUNACHAL PRADESH

Tender Details
Costs
Documents
BOQ

BoQ1

Item Wise BoQ
BoQ_Ver3.0Item WiseNormalINR OnlyINR
Select, Excess (+), Less (-)
Tender Inviting Authority: HQ Chief Engineer Project Vartak
Name of Work: PROVIDING AND LAYING AND COMPACTION OF WBM , SAND BLANKETING , ILC BLOCKS (M-50 GRADE) ] AND CASTING OF EDGE BLOCK IN BETWEEN KM 0.910 TO KM 12.000 ON NELYA- DHAULA ROAD FOR SURFACING WORKS UNDER 42 TF SECTOR OF PROJECT VARTAK IN ARUNACHAL PRADESH STATE
Contract No: CE (P)/ VTK/NIT-11 OF 2025-26
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated RateAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyRATE (Including GST) per Unit In Figures To be entered by the Bidder Rs. P GST Charges on Basic Rate in %SGST Charges on Basic Rate in %IGST Charges on Basic Rate in %Freight Charges In Amount on Full Quantity Reflected in each Row GST on Freight Charges In Amount on Full Quantity Reflected in each Row in %Any Other Taxes/Duties/LeviesLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Tax TOTAL AMOUNT in figures Including GSTTOTAL AMOUNT In Words including GST
12345678910111267891011191221222324252627282930313233343536373839404142434445464748495051521089
1PROVIDING AND LAYING AND COMPACTION OF WBM , SAND BLANKETING , ILC BLOCKS (M-50 GRADE) ] AND CASTING OF EDGE BLOCK IN BETWEEN KM 0.910 TO KM 12.000 ON NELYA- DHAULA ROAD FOR SURFACING WORKS UNDER 42 TF SECTOR OF PROJECT VARTAK IN ARUNACHAL PRADESH STATE
1.01Providing and laying of 75 mm thick (compacted) (two layer each of 75 mm) Water Bound Macadam (WBM), all as specified in MoRTH Book specification for road and bridge work (5th Revision) and as directed by E-I-C/ OC Contractitem1145688.00SQMExcess(+)1Full ConversionINR0000.0000.000.00INR Zero Only
1.02Providing and laying of 100 mm thick (compacted) Water Bound Macadam (WBM), all as specified in MoRTH Book specification for road and bridge work (5th Revision) and as directed by E-I-C/ OC Contractitem277184.00SQMExcess(+)1Full ConversionINR0000.0000.000.00INR Zero Only
1.03Providing and laying of sand blanketing thickness 30 mm (compacted) spraying by water , consolidated with power all complete and filling of joints all as specified as per IRC SP:63-2018 and as directed by E-I-C/ OC Contractitem344479.00SQMExcess(+)1Full ConversionINR0000.0000.000.00INR Zero Only
1.04Casting and curing of Edge Block on site in M-30 grade with all activities to achieve desired strength with provision of material and stores all as specified and as per IRC SP:63-2018 including Centering/ Shuttering.item4391.00CUMExcess(+)1Full ConversionINR0000.0000.000.00INR Zero Only
1.05Providing and laying of Inter-Linked Concrete blocks (ILCB) of size 225 MM X 112 MM X 80 MM (M-50 GRADE) all as specified as per IRC SP:63-2018 and as directed by E-I-C/ OC Contractitem544479.00SQMExcess(+)1Full ConversionINR0000.0000.000.00INR Zero Only
1.06Earthwork in embankment by filling with earth free from roots etc spreading in layers not exceeding 30 cm including watering and finishing to required slope and level not exceeding 1.5 m high above the base in ordinary soil in hill roads where cut & fill method is adopted and all as specified in MoRTH Book specification for road and bridge work (5th Revision) and as directed by E-I-C/ OC Contractitem62480.00CUMExcess(+)1Full ConversionINR0000.0000.000.00INR Zero Only
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect%00 Zero Only
Quoted Rate in WordsINR Zero Only