Items - As per tender documents
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver4.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: GARRISON ENGINEER (SOUTH) PATIALA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: PERIODICAL SERVICES TO SECT ‘B’ AT PATIALA UNDER GE (SOUTH) PATIALA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: GE(S)PAT/T-36/2025-26 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT | TOTAL AMOUNT | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 3 | 4 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 5 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 6 | 6 | 7 |
1.00 | 'Notes: (i) Please refer Schedule 'A' Notes of tender documents. | 1 | Construction of chamber for 100mm sluices valve | item1 | 10 | 1 Nos | ||||||||||||||||||||||||||||||||||||||||||||||||
2.00 | External Finishing Works Taking down cement plaster of any description, any thickness from external surfaces of walls/soffits etc. incl raking out joints, hacking for keys, scrubbibg down with water etc complete all as specified and directed. | 2500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
2.01 | M&L for cement plastering 15mm thick in cemet mortar 1:4 including mixing of liquid water proofing compound as per manufacturer's instructions on brick work or concrete surfaces or in chajjas/parapet walls etc finished even and fair without using extra cement complete all as specified and directed. Note : WPC will be measured and paid separately. | 2500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
2.02 | Supply only integral liquid water proofing compound complete all as specified and directed. | 93.00 | Litre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
2.03 | M&L for complete removal of existing treatment of any type/description from walls/RCC surfaces/ceiling/chajjas/roof projections etc with mechanical means/grinder complete all as specified and directed. | 5000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
2.04 | M&L for applying cement based thick wall care putty on external surfaces of walls/ceilings/soffits (thickness vary from 1.5 to 2.5 mm as required for desired smoothness and levelling of surfaces in two or more layers) by using ready made wall care putty including sand papering after filling the putty to make surface smooth and ready for receiving painting etc complete all as specified and directed. Notes : (i) The prepared surface after wall putty, the contractor will inform to the GE as well as to the Engineer-in-Charge for site inspection before applying further finishes. Please note that the further finishes work will start only after approval of the prepared surface from the GE as well as to the Engineer-in-Charge through site order. | 3000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
2.05 | M&L for Preparation of surfaces and applying 02 coats of exterior emulsion paint (light shade) with highlighter of any approved shade, @ 5 sq.m/litre/2 coats by using roller to external walls/RCC surfaces/soffits of chajjas/roof projections/cantilevers/balcony etc surfaces over & including a coat of exterior wall primer @ 11 sq.m/litre/1 coat as recommended for under coat by manufacturer of exterior emulsion by using following brands of emulsion and primer complete all as specified and directed. | 3500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
2.06 | M&L for Preparation of existing surfaces and applying 01 coats of exterior emulsion paint (light shade) with highlighter of any existing shade, @ 10 sq.m/litre/1 coats by using roller to external walls/RCC surfaces/soffits of chajjas/roof projections/cantilevers/balcony etc surfaces by using following brands of emulsion complete all as specified and directed. | 4000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
2.07 | M&L for preparation of surfaces of external walls/RCC surfaces/soffits of chajjas/roof projections/cantilevers/balcony etc and applying two coat of cement base paint with highlighter of any approved shade @ 5 sq.m/kg/1 coat or as recommended by the manufacturer of cement based paint by using following brands of cement based paint using brush or roller complete all as specified & as directed. | 4000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Supplying, Conveying and fixing spls. Including ea | item4 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
2.08 | M&L for preparation of surfaces of external walls/RCC surfaces/soffits of chajjas/roof projections/cantilevers/balcony etc and applying one coat of cement base paint with highlighter of any existing shade, @ 5 sq.m/kg/1 coat by using following brands of cement based paint and primer by brush or roller complete all as specified & as directed. | 8000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.00 | Internal Finishing Works Taking down cement plaster of any description, any thickness from internal surfaces of walls/soffits/ceilings etc. incl raking out joints, hacking for keys, scrubbibg down with water etc complete all as specified and directed. | 4500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.01 | M&L for 10mm thick cement plastering in cement mortar 1:6 on fair faces of brick work or concrete surfaces finished even & smooth without using extra cement complete all as specified and directed. | 2500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
3.02 | M&L for 5 mm thick cement plastering in cement mortar 1:3 on fair faces of concrete ceiling surfaces finished fair & even without using extra cement complete all as specified and directed. | 2000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
3.03 | M&L for complete removal of existing treatment of any type/description from walls/RCC surfaces/ceiling/chajjas/roof projections etc with mechanical means/grinder complete all as specified and directed. | 12400.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.04 | M&L for applying acrylic thick wall care putty on internal surfaces of walls/ceilings (thickness vary from 1.5 to 2.5 mm as required for desired smoothness and levelling of surfaces in two or more layers) by using ready made wall care putty including sand papering after filling the putty to make surface smooth and ready for receiving exterior painting complete all as specified and directed. Notes : (i) The prepared surface after wall putty, the contractor will inform to the GE as well as to the Engineer-in-Charge for site inspection before applying further external finishes. Please note that the further external finishes work will start only after approval of the prepared surface from the GE as well as to the Engineer-in-Charge through site order. | 13400.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.05 | M&L for Preparation of surfaces and applying 02 coats of interior emulsion paint (light shade) @ 10 sq.m/litre/2 coats by using roller/brush to wall surfaces over & including a coat of interior wall primer @ 10 sq.m/litre/1 coat as recommended for under coat by manufacturer of interior emulsion by using following brands of emulsion and primer complete all as specified and directed. | 5400.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
3.06 | M&L for Preparation of surfaces and applying 02 coats of interior emulsion paint (white shade) @ 10 sq.m/litre/2 coats to ceilings surfaces over & including a coat of interior primer @ 10 sq.m/litre/1 coat as recommended for under coat by manufacturer of interior emulsion by using following brands of emulsion and primer complete all as specified and directed. | 2000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.07 | M&L for preparation of existing treated surfaces on walls/ceilings and applying 01 coat of interior emulsion paint (light shade) @ 20 sq.m/litre/1 coat by using roller to wall/ceiling surfaces including filling wall putty in depressions, sand papering etc and making the surface smooth by using following brands of emulsion complete all as specified and directed. | 9000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.08 | M&L for Preparation of surfaces and applying 02 coats of Oil Bond/ Acrylic Distemper to wall surfaces over & including a coat of interior wall primer as recommended for under coat by manufacturer of OBD by using following brands of emulsion and primer complete all as specified and directed. | 6000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.09 | M&L for preparation of existing treated surfaces on walls/ceilings and applying 01 coat of Oil Bond Distemper/ Acrylic Distemper by using roller to wall/ceiling surfaces including filling wall putty in depressions, sand papering etc and making the surface smooth by using following brands of emulsion complete all as specified and directed. | 9000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
3.10 | M&L for preparing new plastered surfaces of walls and applying three coats of white wash by making the lime slaked at site and shall be mixed and stirred with about five liters of water for 1 kg of unslaked lime to make a thin cream. This shall be allowed to stand for a period of 24 hours and shall then be screened through clean coarse cloth. 1 kg of gum dissolved in hot water shall be added to every one cubic meter of lime cream. About 1.3 Kg of sodium chloride dissolved in hot water shall also be added for every 10 kg of lime for making the coating hard and rub-resistant. Small quantity of ultramarine blue (upto 3 gm per kg of lime) shall also be added to the last two coats of white wash solution and the whole solution shall be stirred thoroughly before use complete all as specified. | 1500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
3.11 | M&L for preparing new plastered surfaces of ceilings and applying three coats of white wash by making the lime slaked at site and shall be mixed and stirred with about five liters of water for 1 kg of unslaked lime to make a thin cream. This shall be allowed to stand for a period of 24 hours and shall then be screened through clean coarse cloth. 1 kg of gum dissolved in hot water shall be added to every one cubic meter of lime cream. About 1.3 Kg of sodium chloride dissolved in hot water shall also be added for every 10 kg of lime for making the coating hard and rub-resistant. Small quantity of ultramarine blue (upto 3 gm per kg of lime) shall also be added to the last two coats of white wash solution and the whole solution shall be stirred thoroughly before use complete all as specified. | 2000.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Supplying, Conveying and fixing spls. Including ea | item4 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
3.12 | M&L for preparing existing treated surfaces of walls including cornices and applying two coats of white wash by making the lime slaked at site and shall be mixed and stirred with about five liters of water for 1 kg of unslaked lime to make a thin cream. This shall be allowed to stand for a period of 24 hours and shall then be screened through clean coarse cloth. 1 kg of gum dissolved in hot water shall be added to every one cubic meter of lime cream. About 1.3 Kg of sodium chloride dissolved in hot water shall also be added for every 10 kg of lime for making the coating hard and rub-resistant. Small quantity of ultramarine blue (upto 3 gm per kg of lime) shall also be added to the white wash solution and the whole solution shall be stirred thoroughly before use complete all as specified and as directed. | 3500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
3.13 | M&L for preparing existing treated surfaces of ceilings including cornices and applying two coats of white wash by making the lime slaked at site and shall be mixed and stirred with about five liters of water for 1 kg of unslaked lime to make a thin cream. This shall be allowed to stand for a period of 24 hours and shall then be screened through clean coarse cloth. 1 kg of gum dissolved in hot water shall be added to every one cubic meter of lime cream. About 1.3 Kg of sodium chloride dissolved in hot water shall also be added for every 10 kg of lime for making the coating hard and rub-resistant. Small quantity of ultramarine blue (upto 3 gm per kg of lime) shall also be added to the of white wash solution and the whole solution shall be stirred thoroughly before use complete all as specified and as directed. | 2500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
4.00 | S/E PAINTING ON STEEL SURFACES M&L for complete removal of existing treatment, preparing steel and iron surfaces of any description/section/trusses/purlins/gates/windows/fencing post/grills/ rolling shutters/ door frames etc, and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed. | 300.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
4.01 | M&L for preparing old painted steel and iron surfaces of any description/section/trusses/purlins/gates/windows/fencing post/grills/ rolling shutters/door frames etc, and applying one coat of synthetic enamel paint complete all as specified and as directed. | 500.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
5.00 | S/E PAINTING ON WOODEN SURFACES M&L for preparing old painted wood & wood based surfaces of any description, not otherwise described over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 800.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
6.00 | French Polishing M&L for preparing old polished wood & wood based surfaces of any description by using sand paper no. 150, applying reapir/filling with putty of suitable material on holes/cracks etc and applying one coat of Melamyne Glossy/Mat finish french polishing to match the existing colour complete all as specified and directed. | 120.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
7.00 | S/E PAINTING ON CONCRETE SURFACES M&L for preparation of old concrete/ plastered surfaces any description/ section, not otherwise described over 10 cm width or girth by complete removing of existing treatment and applying two coats of synthetic enamel paint over a coat of primer complete all as specified | 200.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
8.00 | Repair to RCC ceiling, sunshades, Chajjas, Balconies, Columns, bands, beams, roof slab and similar RCC work at any position/height by dismantling loose/disintegrated portion and dubbing out with Cement Concrete 1:1½:3, 15mm to 50mm thick using 6 to 12mm graded stone aggregate to make up and finished to required shape including provision of necessary supports if required and stitching of cracks with mild steel U clamps made out of 8mm dia @ 150mm c/c with inserting concrete block stretcher with cement mortar 1:3 mixed with adhesive chemical (Polymer based) and reinforced with PVC chicken mesh including form work where ever required and finished with10 mm thick plastering in CM 1:4 finished even and fair without using extra cement including preparation of surfaces to receive finishes complete all as specified and directed. | 100.00 | Square Metre | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
9.00 | Note for Ser item No 2.03 to 2.08 & 3.03 to 3.09 :- The work for periodical services shall include the following and the rates quoted by the bidders shall include the same :- (a) The work pertaining to periodical services shall be executed by the contractor as per MoU from authorised applicator through manufacturer of the materials like Exterior Emulsion paint, putty etc after approval by the GE. (b) The Contractor shall upload with the documents under cover I "Memoradum of Understanding" (MOU) as per format given in Annexure ‘A’ after Schedule 'A' Notes with at least one of the manufacturers mentioned in the contract, failing which the bid shall be laible to be rejected. (c) Use of Scaffolding, trestles, ladders, cradles etc necessary for execution of work and protective measures. (d) Removing of Nails, making good holes, cracks etc (e) Work in patches and in narrow / widths, bands, cornices, pilasters etc and cutting in edge of line where necessary. (f) Spreading and removing covering to doors, windows, floors, fittings etc to protect them from splashes. (g) Washing floors, cleaning glass, joinery , electric fittings , wirings etc. Drops and splashes of paint to be cleaned to the entire satisfaction of Engineer-in-Charge. (h) Sample patch of 10Sqm be prepared considering all the items of periodical and shall be got approved from GE prior to carrying out further work. | 1 | Construction of chamber for 100mm sluices valve | item1 | 10 | 1 Nos | ||||||||||||||||||||||||||||||||||||||||||||||||
10.00 | Notes: Applicable to (item No 2 to 8) 1. The items of Plastering/ Rendering, putty and further finishes (as applicable) shall be got executed in Stage wise manner (as mentioned below). After completion of every stage contractor will submit the stage passing certificate duly sign by all concerned as per format given in Appx ‘A’ after Schedule 'A' Notes. (a) Stage –I : Plastering / rendering. (b) Stage – II : Putty work. (c) Stage – III : First coat of finishes. (d) Stage- IV : Second coat of finishes. 2. Please note no further stage shall be executed till the certificate is submited to the GE. | 1 | Construction of chamber for 100mm sluices valve | item1 | 10 | 1 Nos | ||||||||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |