Items - REPAIR OF CRATER DURING RRS EXERCISE AT AF STN NALIYA
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: GARRISON ENGINEER AIR FORCE NALIYA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: REPAIR OF CRATER DURING RRS EXERCISE AT AF STN NALIYA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: GE(AF)/NLYA/ OF 2025-26 File No : 8061/E8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Rs. P | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 7 | 54 | 8 |
1.00 | Earth work in excavation by mechanical means (hydraulic excavtor ) means over areas (exceeding 30 cm in depth , 1.50 metre in width as well as 10 sqm on plan ( including getting out and disposal of excavated earth lead upto 50 m and lift up to 1.5 metre complete all as specified and directed. | 626.71 | CUBIC METRE | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1 | Construction of chamber for 100mm sluices valve | item1 | 10 | 1 Nos | ||||||||||||||||||||||||||||||||||||||
2.00 | Earth work in excavation by mechanical means (hydraulic excavtor ) means over areas (exceeding 1.5 metre but not exceeding 3.0 metre in depth , 1.50 metre in width as well as 10 sqm on plan ( including getting out and disposal of excavated earth lead upto 50 metre and lift up to 1.5 metre, complete all as specified and directed. | 607.08 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
3.00 | Earth work in excavation by mechanical means (hydraulic excavtor ) means over areas (exceeding 3.0 metre but n. exc 4.50 metre in depth , 1.50 metre in width as well as 10 sqm on plan ( including getting out and disposal of excavated earth lead upto 50 metre and lift up to 1.5 metre complete all as specified and directed. | 199.08 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
4.00 | Removing rock boulders as directed by engr-in-charge lead exceeding 1.50 Km but not exceeding 5 Km and depositing where directed complete all as specified and directed. | 1422.37 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
5.00 | Spreading and levelling of 20 to 40 mm size aggregate in layers not exceeding 25 cm thick complete all as specified and directed. | 125.31 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
6.00 | Ramming and compaction only for Hardcore of gauge 40 to 90 mm,& boulders deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a truly horizontal surface by using power roller exceeding 5 tonne & not exceeding 8 tonne complete all as specified and directed. | 1297.06 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
7.00 | Removing excavated sand/soil material exceeding 1.50 Km but not exceeding 5 Km and depositing where directed complete all as specified and directed. | 10.42 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||||
8.00 | Laying of sand cushion with clean river sand duly clear of residual , organic and deleterious materials spread evenly to uniform thickness laid over aggregate surface as specified and directed. | 10.42 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
9.00 | Laying of HDPE 400 micron sheet (No additional amount to be paid for overlap) complete all as specified and directed. | 460.41 | SQUARE METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
10.00 | Grouting of rapigrout cement slurry into 300 mm thick aggregate layer up to top of layer and the quantity slurry should be minimum enough above the top aggregate of the top aggregate of the layer to enable finishing of the top layer with slurry complete all as specified and directed. | 125.31 | CUBIC METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
11.00 | Finishing surface of concrete roads, pavements, by brooming complete all as specified and directed. | 41.78 | TEN SQUARE METRE | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||||
12.00 | Site Clearance | 11727.54 | SQUARE METRE | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | |||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |