Bidhelp
National Highways and Infrastructure Development Corporation||Corporate Office-New Delhi - NHIDCL
National Highways and Infrastructure Development Corporation||Corporate Office-New Delhi - NHIDCL
Executive Director (P)
Nagaland QTY :

Items - Short Term Maintenance Contract for Restoration of Hill Slope from Km Ch. 161.120 to Km Ch. 161.220 at 4-laning of Dimapur-Kohima section (NH-29) in the state of Nagaland in FY 2025-26 Percentage Rate and work Order Basis

Tender Details
Costs
Documents
BOQ

BoQ1

Percentage BoQ
BoQ_Ver3.1PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: RO-Kohima, NHIDCL
Name of Work: “Short Term Maintenance Contract for Emergency restoration work on 4-lane Dimapur-Kohima section on NH-29 from Km 161+100 to Km 161+200 in the state of Nagaland in FY: 2025-26 (Percentage Rate and work Order Basis)” .
Contract No: NHIDCL/RO-Kohima/DK-III/STMC/Corres/Vol-I/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051527548
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed,upto a lead of 1000 mBI01010001010000000000000515BI01000011246400.000Cum84.56Excess(+)1.00Full ConversionINR 541,184 541184.00INR Five Lakh Forty One Thousand One Hundred & Eighty Four Only2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed,upto a lead of 1000 mBI01010001010000000000000515BI01000011246400Cum
3Earth work in excavation in ordinary Rocks by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed,upto a lead of 1000 mBI01010001010000000000000515BI01000011251000.000Cum163.48Excess(+)1.00Full ConversionINR 163,480 163480.00INR One Lakh Sixty Three Thousand Four Hundred & Eighty Only3Earth work in excavation in ordinary Rocks by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed,upto a lead of 1000 mBI01010001010000000000000515BI01000011251000Cum
4Construction of embankment with material Deposited from Roadway cutting Construction of Embankment with approved material deposited at site from roadway cutting and excation from frain and foundation of other structures graded and compacted to meet the requirement of Table 300-3BI01010001010000000000000515BI01000011266400.000Cum80.80Excess(+)1.00Full ConversionINR 517,120 517120.00INR Five Lakh Seventeen Thousand One Hundred & Twenty Only4Construction of embankment with material Deposited from Roadway cutting Construction of Embankment with approved material deposited at site from roadway cutting and excation from frain and foundation of other structures graded and compacted to meet the requirement of Table 300-3BI01010001010000000000000515BI01000011266400Cum
5Construction of Embankment with approved material obtained from borrow pits with all lifts and leds, transporting to site, spreading, grading to required slope and compacting to meet the requirement of compaction using 8-10T vibratory RollerBI01010001010000000000000515BI010000112734100.000Cum419.91Excess(+)1.00Full ConversionINR 14,318,931 14318931.00INR One Crore Forty Three Lakh Eighteen Thousand Nine Hundred & Thirty One Only5Construction of Embankment with approved material obtained from borrow pits with all lifts and leds, transporting to site, spreading, grading to required slope and compacting to meet the requirement of compaction using 8-10T vibratory RollerBI01010001010000000000000515BI010000112734100Cum
6Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.BI01010001010000000000000515BI01000011284800.000Sqm319.11Excess(+)1.00Full ConversionINR 1,531,728 1531728.00INR Fifteen Lakh Thirty One Thousand Seven Hundred & Twenty Eight Only6Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.BI01010001010000000000000515BI01000011284800Sqm
7Providing & making of BIS cerified Gabion fascia box (TMS box) with 2m integrated tail of Size 3m(Length of Tail)x3m(Length of Box) x 1.0m(Height of unit) with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MoRT&H's 5 th revision clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zn +Polymer coated, Mesh wire diameter 2.70/3.70 mm (ID/OD), mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in chargeBI01010001010000000000000515BI01000011292400.000Cum6119.82Excess(+)1.00Full ConversionINR 14,687,568 14687568.00INR One Crore Forty Six Lakh Eighty Seven Thousand Five Hundred & Sixty Eight Only7Providing & making of BIS cerified Gabion fascia box (TMS box) with 2m integrated tail of Size 3m(Length of Tail)x3m(Length of Box) x 1.0m(Height of unit) with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MoRT&H's 5 th revision clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zn +Polymer coated, Mesh wire diameter 2.70/3.70 mm (ID/OD), mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in chargeBI01010001010000000000000515BI01000011292400Cum
8Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with Minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain. UG 100BI01010001010000000000000515BI01000011307875.000Sqm427.68Excess(+)1.00Full ConversionINR 3,367,980 3367980.00INR Thirty Three Lakh Sixty Seven Thousand Nine Hundred & Eighty Only8Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with Minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain. UG 100BI01010001010000000000000515BI01000011307875Sqm
9Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with Minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain. UG 200BI01010001010000000000000515BI010000113114700.000Sqm614.55Excess(+)1.00Full ConversionINR 9,033,885 9033885.00INR Ninety Lakh Thirty Three Thousand Eight Hundred & Eighty Five Only9Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with Minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain. UG 200BI01010001010000000000000515BI010000113114700Sqm
10Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with Minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain. UG 300BI01010001010000000000000515BI01000011323150.000Sqm698.57Excess(+)1.00Full ConversionINR 2,200,496 2200496.00INR Twenty Two Lakh Four Hundred & Ninety Six Only10Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with Minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain. UG 300BI01010001010000000000000515BI01000011323150Sqm
11 Perforated PVC Pipe 100 mm internal dia. (Class 3), Working pressure: 6 kgf/cm² Conforming to IS 4985:2000 Spacing @10m c/c along the RS wallBI01010001010000000000000515BI0100001133504.000m2398.57Excess(+)1.00Full ConversionINR 1,208,879 1208879.00INR Twelve Lakh Eight Thousand Eight Hundred & Seventy Nine Only11 Perforated PVC Pipe 100 mm internal dia. (Class 3), Working pressure: 6 kgf/cm² Conforming to IS 4985:2000 Spacing @10m c/c along the RS wallBI01010001010000000000000515BI0100001133504m
12Supplying &laying of drainage composite for use behind walls, between two different fills,alongside drains of road,below concreteining of canals etc. Geocomposite for planar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or protecting layers.The draining three dimensional core will have a "'W" configuration as longtudinal parallel channels. Minimum thickness to be 7.2 mm. with two filtering W stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75 mm charecteristic opening size (090) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer,geocomposite having in plane flow capacity oi 2.1 L I (m.s) at hydraulic grad ent of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m .with mass per unit area of 740 gsm, suppied inthe form of roll for easy transportation to site of work as per detailed specification all compete as per directions of Engineer in charge.BI01010001010000000000000515BI010000113410000.000Sqm916.79Excess(+)1.00Full ConversionINR 9,167,900 9167900.00INR Ninety One Lakh Sixty Seven Thousand Nine Hundred Only12Supplying &laying of drainage composite for use behind walls, between two different fills,alongside drains of road,below concreteining of canals etc. Geocomposite for planar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or protecting layers.The draining three dimensional core will have a "'W" configuration as longtudinal parallel channels. Minimum thickness to be 7.2 mm. with two filtering W stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75 mm charecteristic opening size (090) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer,geocomposite having in plane flow capacity oi 2.1 L I (m.s) at hydraulic grad ent of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m .with mass per unit area of 740 gsm, suppied inthe form of roll for easy transportation to site of work as per detailed specification all compete as per directions of Engineer in charge.BI01010001010000000000000515BI010000113410000Sqm
13Providing and fixing 32mm diameter 6/8 m long steel rock bolts(SDA) including drilling 51 mm dia holes,plates,nuts,cement grout,cost of all materials,machinery,labour,ventilation,lighting,drainage and other ancillary operations etc.complete as per drawing and technical specifications.BI01010001010000000000000515BI01000011355600.000M5386.25Excess(+)1.00Full ConversionINR 30,163,000 30163000.00INR Three Crore One Lakh Sixty Three Thousand Only13Providing and fixing 32mm diameter 6/8 m long steel rock bolts(SDA) including drilling 51 mm dia holes,plates,nuts,cement grout,cost of all materials,machinery,labour,ventilation,lighting,drainage and other ancillary operations etc.complete as per drawing and technical specifications.BI01010001010000000000000515BI01000011355600M
14PCC rectangular drain over top of the slope 0.5m x 0.5m internal dimensions including required PCC and shuttering (PCC M 20)BI01010001010000000000000515BI010000117821.000Cum9940.71Excess(+)1.00Full ConversionINR 208,755 208755.00INR Two Lakh Eight Thousand Seven Hundred & Fifty Five Only14PCC rectangular drain over top of the slope 0.5m x 0.5m internal dimensions including required PCC and shuttering (PCC M 20)BI01010001010000000000000515BI010000117821Cum
Total in FiguresBI01010001010000000000000515BI0100001196Excess(+)1.00Full ConversionINR 87,110,906 87110906.00INR Eight Crore Seventy One Lakh Ten Thousand Nine Hundred & Six Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect - 0.00INR Zero Only
Quoted Rate in WordsINR Zero Only