Items - Construction of internal WBM roads at INRPC Tarapur

Tender Details
Costs
Documents
BOQ

BoQ1

Item Rate BoQ
BoQ_Ver3.0Item RateNormalINR OnlyINR
Select, Excess (+), Less (-)Less (-)
Tender Inviting Authority: Project Director, INRPC, NRB, BARC.
Name of Work: Construction of internal WBM roads at INRPC Tarapur
NIT No: BARC(T)/NRB/INRPC/PTC-137/2025/1368 dated 07/08/2025
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only. Rebate/Discount shall be entered in Row No. 25)
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other Currency RATE (With Tax) In Figures To be entered by the Bidder in Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (With Tax) in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT (With Tax) In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. From 0.00 to 1.50 m depth from average ground level31400CumExcess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
2Lead charges for lead exceeding 2 KM but not exceeding 3 KM by mechanical transport including loading, unloading, stacking / levelling etc. For soil31400CumExcess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
3Preparation and consolidation of sub-grade (Proof Rolling) with power roller of 8 to 10T capacity including excavating earth to an average thickness of 22.5 cms depth, dressing to camber and consolidating with road roller including making good the undulations etc. and rerolling the subgrade and disposal of surplus earth within a lead of 200 m21109Sq.MExcess(+)1Full ConversionINR0.000.00INR Zero Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
4Murrum Filling in roads in layers of not exceeding 150 mm thickness including consolidation, rolling each layer with power roller of minimum 8 tones capacity, dressing sides and top to the required profile and grade etc. complete as per direction of Engineer in charge (using approved murrum available at BARC campus with a lead of up to 4 Kms) Note: a) Only compacted volume will be measured and paid, b) Selected / approved excavated stuff stored within the DAE premises shall be issued free of cost to the contractor for filling purposes.8452CumExcess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
5Providing and laying, spreading and compacting granular sub-base (GSB) material 300 mm thick (150 mm thick in each layer) compacted layer of crushed sand, murrum, gravel crushed stone and combination there of as per specification including spreading on the prepared sub grade, maintaining the required slope and grade and cross fall (camber) etc. complete as directed by the Engineer-in-charge (Compacted thickness only will be measured and paid for.)5896CumExcess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
6Supplying, stacking, Laying, spreading and compacting stone aggregate of specified sizes to complete water bound macadam of specified thickness as per WBM specifications including spreading in uniform thickness, hand packing, rolling with 3 wheeled road / vibratory road roller 8 to 10 T capacity to proper grade and camber, providing and applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate watering and compacting to the required density. (Compacted volume only will be measured and paid for)3640CumExcess(+)1Full ConversionINR0.000.00INR Zero Only2Construction of chamber for 100mm sluices valveitem310Nos
7Providing and laying non pressure NP2 class RCC Hume pipes of approved make, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2, laying to the levels, slopes and as per the drawings and specifications and as directed by the Engineer-in-charge including testing of joints etc. complete of following dia:
7.1450 mm 200MExcess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
7.2600 mm250MExcess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
7.31200 mm50MExcess(+)1Full ConversionINR0.000.00INR Zero Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
8Assistance to perform miscellaneous site related activities like maintenance of Storm water drains, excavation, material shifting etc. by unskilled manpower with necessary accessories. Note: one "Task" means execution of above specified work by deploying one unskilled worker for eight hours.520TaskExcess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos