Bidhelp
National Aluminium Company Limited,NALCO||NALCO-CPP Division-Angul||Tender and Contract-CPP Division-Angul-NALCO
National Aluminium Company Limited,NALCO||NALCO-CPP Division-Angul||Tender and Contract-CPP Division-Angul-NALCO
Mr.Rajesh Sarkar
Odisha QTY :

Items - REPAIR AND MAINTENANCE OF CPP CORRIDOR ROAD CONNECTING TO Y JUNCTION (TOWNSHIP)

Tender Details
Costs
Documents
BOQ

BoQ1

Item Rate BoQ
BoQ_Ver3.0Item RateNormalINR OnlyINR
Select, Excess (+), Less (-)Less (-)
Tender Inviting Authority: Mr RAJESH SARKAR, Dy.General Manager (CERAMIC), T&C, CPP, NALCO, ANGUL
Name of Work: REPAIR & UPGRADATION OF CPP CORRIDOR ROAD CONNECTING TO Y JUNCTION (TOWNSHIP)
Contract No: MC-5541
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder in Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1.00P/L Bituminous concrete :Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher to the required grade, level and alignment and rolling with smooth wheeled vibratory or tandem rollers as per specification, complete and as per directions of Engineer-in-Charge. 25 to 40 mm compacted thickness with bitumen of grade VG-30 as per IS:73/2006 equivalent to bitumen 60/70 @5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. Following materials is requried for production of 1 cum bitumenous concrete. (a) Paving asphalt of grade VG-30 of aprpoved quailiity @ 5.5%(percentage by weight of total mix 129.58 Kg. b) Stone agreegate single size: 12.5mm nominal size 0.223 Cum. (c) Stone agreegate single size: 10mm nominal size 0.408 Cum. d) Stone agreegate single size: 6mm nominal size 0.186 Cum. e) Stone chipping/ screenings 4.75mm nominal size 0.623 Cum. f) Dry hydrated lime (factory made) : 66.81 Kg. Weight of 1 Cum bituminous concrete is 2.356 MT.) Mode of measurement: Measurement shall be made on volumetric basis. Volume of bitumenious concrete will be worked out by weight of concrete recorded at weigh bridge devided by density of BC of 2.356MT/ Cum. Weighment of tipper/ Hyva shall be recorded at weighbridge of Nalco steel yard. The bidder is requested to quoted their price accordinglyBI01010001010000000000000515BI01000011131520.00CUM100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
2.00P/L Bituminous macadam :Providing and laying Bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolling with smooth wheeled vibratory or tandem rollers as per specifications, complete as per specificatons and directions of Engineer-in-Charge.- 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. Requirement of ingredients for production of 1.0 Cum bituminous macadam. (a) Paving asphalt of grade VG-30 @ 3.5% by weight of total mix 76.83 Kg. (b) Stone agreegate single size: 25mm nominal size 0.282 Cum. c) Stone agreegate single size: 10mm nominal size 0.565 Cum. (d) Stone agreegate single size: 6mm nominal size 0.282 Cum. (e) Stone chippings/ screenings 4.75mm size 0.282 Cum. Weight of 1 Cum bituminous macadam is 2.195 MT.) Mode of measurement : Measurement shall be made on volumetric basis. Volume of bitumenious macadam will be worked out by weight of BM recorded at weigh bridge devided by density of BM of 2.195MT/ Cum. Weighment of tipper/ Hyva shall be recorded at weighbridge of Nalco steel yard. The bidder is requested to quoted their price accordinglyBI01010001010000000000000515BI0100001114150.00CUM100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
3.00P/A Tack coat On Bituminous surface :Providing and applying tack coat using bitumen emulsion conforming to IS :8887 using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom as per specification and direction of manager-In-Charge: (a) On bituminous surface @ 0.25 kg/sqm.BI01010001010000000000000515BI010000111538000.00SQM10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only2Construction of chamber for 100mm sluices valveitem310Nos
4.00P/F Cats eye/Glow studs :Providing and fixing Cats eye/Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloretrite) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating of 3M make as approved by Engineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/-5) degress to base. The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer complete and as per direction of Manager-in-charge.BI01010001010000000000000515BI01000011163000.00EACH10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
5.00P/A Road marking strips :Providing and applying 2.5mm thick Road marking strips (retro-reflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign foreign material etc. complete as per direction of EIC and accordance with applicable specificationsBI01010001010000000000000515BI01000011172000.00SQM10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
6.00Carrying out field tests :Carrying out field tests (bitumen content) as per relevant standards and specifications on daily basis after collecting sample of bituminous mix at HMP/site with own laboratory instruments, consummables, sieves, weighing machine with 1 gm accuracy, filter papers, benzene, etc in the presence of NALCO representative as directed by M-I-C (1 set of test includes for bitumen content tests for three sample collected jointly) (2 sets of tests or more shall be done daily as per direction of MIC)BI01010001010000000000000515BI0100001118100.00SET10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
7.00P/L Random Rubble masonary :Providing & Laying Random Rubble masonary work with hard stone in foundation and plinth with cement mortar 1:6(1 cement: 6 sand) including levelling , finishing etc complete as per specifications and instructions of the manager in chargeBI01010001010000000000000515BI010000111910.00CUM10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only2Construction of chamber for 100mm sluices valveitem310Nos
8.00S/T/S/S of Moorum :Supplying, Transporting, stacking and spreading of Moorum of approved quality and authorised sources. The rates inclusive of stacking, transporting,spreading, royality & other levies and other applicable taxes etc.BI01010001010000000000000515BI0100001120650.00CUM10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
9.00Repair of existing divider side walls :Repair of existing divider side walls with plain cement concrete 1:1.5:3 (1 cement : 1.5 sand: 3 coarse aggregate) including the cost of required centering, shuttering and finishing smooth with 6mm thick cement plaster 1 : 3 (1 cement : 3 fine sand) on exposed surface complete.as directed by MIC (Cement will be issued free of cost from Nalco store)BI01010001010000000000000515BI010000112110.00CUM10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
10.00P/F of boundary stone 150 mm at top :Providing & fixing of boundary stone 150 mm at top, 200 mm at bottom and 900 mm high precast reinforced cement concrete 1:1.5:3 (1 cement 1.5 coarse sand and 3 graded stone aggregate 20mm nominal size) as per standard design ,including finishing smooth with cement mortar 1:3 (1 cement 3 fine sand) loading, unloading, transportation, cost of excavation of earth , refilling & concrete grouting of C.C. (1:2:4) of size 400 mm X 400mmX300 mm etc. all complete as per specification and direction of MIC. (Cement will be supplied by contractor)BI01010001010000000000000515BI010000112250.00EACH10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
11.00P/A Apcolite premium gloss synthetic en :Providing & applying two or more coats of apcolite premium gloss synthetic enamel paint asian make or berger luxel or ICI Duluzx synthetic enamel paint in alternate strips of black and yellow or white as directed by manager in charge over a coat of primer of asian /burger/ICI make including cleaning the dust, rust, dirt, scales, smoke etc completeBI01010001010000000000000515BI01000011235000.00SQM10.00Excess(+)1Full ConversionINR0.000.00INR Zero Only2Construction of chamber for 100mm sluices valveitem310Nos
12.00Centering and shuttering :Centering and shuttering including strutting, bracing, propping etc., keeping the same in position during concreting and removal of the same after specified period etc. all complete and as specified and direction of MIC. For all concrete and RCC workBI01010001010000000000000515BI010000112530.00SQM10.000Excess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
13.00S/T/S/L of Crusher dust/Granite stone :Supplying, Transporting, stacking & laying of Crusher dust/Granite stone of 4.25mm & below of approved quality and authorised sources. The rates inclusive of stacking, spreading, transporting, royality, other levies and other applicable taxes etc. complete as per instruction of the Manager in chargeBI01010001010000000000000515BI010000112650.00CUM10.000Excess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
14.00Surface cleaning :Surface cleaning/dressing of the ground, Road berm including removing vegetation, grass cutting, bush cleaning and removal of inequalities not exceeding 30 cm deep and disposal of rubbish at a designated location as indentified by the manager in charge in all kinds of soil including levelling etc complete as per specifications and instructions of the manager in chargeBI01010001010000000000000515BI01000011278500.00SQM10.000Excess(+)1Full ConversionINR0.000.00INR Zero Only2Construction of chamber for 100mm sluices valveitem310Nos
15.00Dismantling of PCC/RCC :Dismantling of PCC/RCC including supplying of all tools and tackles, machineries, labour etc complete, Transporting & disposal of all debris at the designated place within the plant premises as indentified by the manager in chargeBI01010001010000000000000515BI01000011285.00CUM10.000Excess(+)1Full ConversionINR0.000.00INR Zero Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.00000.0000 Zero Only
Quoted Rate in WordsINR Zero Only