Items - Constructuin of entrance Tower Post at Bithra southern Monsoon channel
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Executive Engineer (Civil), ALHW, Kavaratti | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: Construction of Entrance tower/post at Bitra Southern Monsoon channel. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: 048962623351 / 04896262134 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | Rate in figures to be entered by the Bidder in Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes in Rs. P | TOTAL AMOUNT | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1 | Providing and laying P.C.C.1:2:4 using 20 mm stone metal mixing dry at shore, bagging in half bags and tying, loading on to the barges/ boat, conveying to entrance tower location, placing in position at the foundation during low tide around pre cast structure at the sea bed level, packing at places where erosion occurred including cost of all materials, all labour for mixing, extra labours (diver) for placing, leveling under water etc. complete. | item No.13 | 3.50 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
2 | Providing and laying RCC 1:0.9:1.80 using 20mm graded stone aggregate for RCC M30, RCC well ring, pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and RCC slab or bollard blocks, low level landing platform etc. excluding fabrication charges which will be paid separately including cost of all materials- cement, granite chips, M-sand, cost of all labour charges for screening and washing of coarse aggregate and M- sand, providing all shuttering, including cost of shuttering materials, centering, propping wherever required mixing, conveying and placing, consolidation with vibrator, curing and transportation charges of all materials to the Work Site, hire charges and running expenses of concrete Mixer Machine and vibrator, consumables and all other equipments, cost of minor tools etc. complete. | item No.14 | 2.50 | Cum | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
3 | Fabrication and fixing of reinforcement (Fe 500D make SAIL/TATA/RINL/JINDAL or its equivalent) as per drawing for precast piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Bitra, cost of binding wires, all T&P required for the work and minor tools etc. complete. | item No.15 | 2.50 | Qtl | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
4 | Engagement of above 35 feet boat for transportation of precast materials such as cement, aggregates, shuttering materials etc. from jetty to the construction site at entrance by boat including hire charges of boat etc. complete. | item No.16 | 5.00 | Day | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
5 | Painting two coats on ready mixed acrylic plastic emulsion paint over the primer coat on the RCC entrance tower surface above water level including cost of paint, hire charges of boat, all labour charges for scrapping the outer area, cleaning, scaffolding, brushes, minor tools etc. complete. | item No.17 | 7.00 | Sqm | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
6 | Engaged labour for loading & unloading transporting well ring and other materials to site and fixing the well rings in position. | item No.18 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
6.1 | USM | item No.19 | 5.00 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
6.2 | SM | item No.20 | 5.00 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |