Items - Provision of Internal Painting of indoor sports complex and Pavilion 2, False Ceiling in yoga hall and Paving in front of indoor sports complex VNIT, Nagpur.

Tender Details
Costs
Documents
BOQ

BoQ1

Item Rate BoQ
BoQ_Ver3.0Item RateNormalINR OnlyINR
Select, Excess (+), Less (-)Less (-)
Tender Inviting Authority: Director, VNIT Nagpur.
Name of Work: Provision of Internal Painting of indoor sports complex and Pavilion 2, False Ceiling in yoga hall and Paving in front of indoor sports complex VNIT, Nagpur.
Contract No:
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder in Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1Provision of Internal Painting of indoor sports complex and Pavilion 2, False Ceiling in yoga hall and Paving in front of indoor sports complex VNIT, Nagpur.BI01010001010000000000000515BI01000011121Construction of chamber for 100mm sluices valveitem1101 Nos
1.01Providing and applying plastic emulsion paint of approved quality, colour and shade to old and new surface in two coats including scaffolding, prepraing the surfaces. (excluding the primer coat.) etc. complete. Bd.P.6 Page One Number 414BI01010001010000000000000515BI01000011137250.00sqm9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
1.02Providing and applying two coats of synthetic enamel paint of approved colour to new/old structural steel work and wood work in buildings, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. Bd.O.5 Page One Number 405218.00sqm9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.03Providing and applying French polish for required finish on previously polished wood including knotting, preparing the surfaces, scaffolding etc. complete as directed. Bd.N.1.3 Page One Number 399700.00sqm9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.04Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling/wooden flooring at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos/chlorodane per One Square Metre of surface area covering ten years guarantee on bond paper.600.00sqm9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.05Providing antitermite treatment to the sides of flooring of the existing building as per I.S. 6313 (Part-III) by punching holes 6mm dia. drilled at a distance of 30cm. centre to centre and injecting one percent of chlorodane emulsion concentrate at the rate of 50 ml per hole and sealing by filling putty etc. complete covering 2 years guarantee on bond paper.620.00Nos.9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.06Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees, ISMB, plates etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. Bd.C.2 Page One Number 2752.00M.T.9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.07Providing and fixing false ceiling with eco-friendly light-weight calcium silicate tiles of spintone surface texture aerolite make or equivalent of size 595mm x 595mm having 15mm thick densified micro look edge and 100% humidity resistance incombustible as per BS 46part IV and thermal conductivity 0.043 w/m 0 KC and NRC 0.50 placed in true horizontal level suspended grid of size 600x600mm made from hot dipped G.I. steel sections ion silhouette profile, rotary stitched double webbed white with 6mm reveal profile (white/black), wherein, main T runner of size 42mmx14mm between main tee 600mm center-tocenter and secondary cross T of size 33x14x0.43mm thick of length 600mm long spaced inter-locked at middle of the first crossed T in each panel to form grid of 1200mmx600mm resting on periphery wall Profile wall section 19mm (7+7) x 19mmx0.40thicknesses and laying false ceiling for services like diffusers grills including cutting, making opening for light fittings, fixtures, , smoke detectors etc., wherever required. Main T runners suspended from ceiling with using G.I. soffit cleats of size 25x35x1.6 mm of required length fixed to the ceiling with 6mm dia and 50mm long dash fastener, 4mm dia G.I. adjustable rods with powdercoated/good quality G.I. level adjustment clips of 35x35x0.8mm spaced @1200, center-to- center along main T all complete at all heights as per the specifications, drawings and As directed by Engineer in charge.150.00Sq. M9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.08Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. As directed by Engineer in charge. 50.00sqm9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.09Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means. Bd.A.1 Page One Number 25926.00cum9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.10Providing and filling in the foundation with stone dust of approved quality including watering, compacting etc. complete. (To be executed with prior approval of Superintending Engineer) Bd.A.13 Page One Number 26415.00cum9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.11Providing and fixing heavy duty inter locking concrete RUBBER MOULD GLOSSY PAVING BLOCKS of 60 millimeter thickness of having a strength of 400 Kilogram/sq.m of approved quality and shape on a bed of crushed sand of 25 to 30 millimeter thick including striking joints and cleaning etc. complete. (using 100% crushed sand) Bd. M-12 page One Number 385220.00sqm9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.12Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.) etc. complete. With fine aggregate (Crushed sand VSI Grade) Bd.E.2 Page One Number 288 and B.7 Page No 380.20cum9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.13Transportation of debris, tiles obtained from dismental material including loading, unloading and conveying at VNIT Campus etc. complete lead upto 3 Km. as directed by Engineer Incharge. 26.00cum9100.00Excess(+)1Full ConversionINR0.000.00INR Zero Only
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.00000.0000 Zero Only
Quoted Rate in WordsINR Zero Only
Plus GST as Applicable