Item Rate BoQ | 1 |
BoQ_Ver4.0 | Item Rate | Normal | INR Only | INR |
Select, Excess (+), Less (-) | Less (-) |
Tender Inviting Authority: |
Name of Work: Cosmetic maintenance of areas in & around residential and non-residential (Type V-E) buildings (312 flats) at old Mandala, Anushaktinagar, Mumbai. |
Contract No: DCSEM/CQD/QSB/25-26/NIT/49 dt.12.08 .2025 |
Name of the Bidder/ Bidding Firm / Company : |
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) |
Sl.
No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder
Rs. P
| Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes | TOTAL AMOUNT With Taxes | TOTAL AMOUNT
In Words |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1 | PART I : CIVIL WORKS | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos |
101 | Collection of dry, wet and hazardous waste separately daily from individual flats/ public buildings on different floors of the buildings with or without lifts, loading it in the applicable compartment of the waste transport vehicle or at the place decided by Engineer-in-charge, inclusive of the cost of basket and bags, cost of labour etc. complete all as directed by the Engineer-in-Charge. Garbage is to be collected from all the flats/ public buildings in morning hours. Residential buildings: (Total 312 flats X 361days) | 112632.00 | per flat per day | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos |
102 | Sweeping & cleaning the passages, corridors, stilted areas, staircases,Lifcars, landings, approach roads including front and rear canopies, landings, top staircase landings, approach roads including footpath way etc. daily and surroundings of buildings (area around the buildings from edge of the building upto storm water drain of the buildings) including cost of necessary hard/ soft brooms, charges for collection of garbage and other waste materials, laying around the buildings and transporting to the garbage collection rooms etc. including cost of labours, baskets, brooms and tools required for carrying out the work etc. complete all as directed by the Engineer-in-Charge. Frequency of cleaning shall be Once in a Day . Residential bldgs (06*361 days) | 2166.00 | per bldg. per day | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos |
103 | Mopping only the passages, corridors, staircases, landings etc. with phenyled water including cost of labour, phenyle and other cleaning materials such as tools, moppers with wooden handles, mopping dusters etc. complete all as directed by the Engineer-in-charge (frequency: fortnightly) A) Residential bldgs: (6*12*2 moppings) | 144.00 | Per Bldg. Per Mopping | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos |
104 | Removing cob-webs from the staircases, stilted areas, common area, canopies, etc. including cost of labour, tools such as ladders, brooms with stick etc. complete all as directed by the Engineer-in-Charge. Once in one month. Payment will depend upon number of occasions, the cob-webs are removed from the buildings. (frequency - once in a month) Residential bldgs:(06*12*1 cleaning) | 72.00 | per month/p bldg | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos |
105 | Cleaning & removing of silt & waste materials from inside of storm water drains, once in every month or as many times as directed by Engineer-in-Charge, with taking special care of the drains in monsoon to keep them in functional condition at all time and disposing off the collected materials to the nearest garbage collection rooms etc. including cost of tools and plant, complete all as directed by the Engineer-in-Charge. Residential bldgs: Details in Annex. "A" (06*12 month) | 72.00 | per cleaning | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos |
106 | Mechanical transportation of wet and dry garbage, garden waste collected during sweeping & cleaning around the building by pick up van (01 nos) from all the residential & public buildings in 312 buildings area to concerned Waste Processing Centre (WPC) for further disposal at composting facilities / biogas plant behind Tapti Bio gas plants near Training School Hostel and near BARC Hospital canteen, transporting back left over dry garbage after segregation from Organic waste composting machine/Bio gas plant to garbage bin, including loading, unloading including cost of vehicle (TATA 407/Mahindra Bolero or equivalent Pickup van), driver, fuel, labours for loading & unloading, etc all complete as directed by Engineer-In-Charge (01 nos * 361 days). | 361.00 | per day/ per vehicle | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos |
107 | Cutting & removing vegetation from all around the buildings upto the building storm water drains by engaging one number of brush cutter machine including cost of operator, fuel tools and plant, complete all as directed by the Engineer-in-Charge. (1No. x 361 days) | 361.00 | per day | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos |
108 | Providing & spreading bleaching powder of Grade II quality or equivalent on the approach road, pathways, passages of the buildings & its surrounding areas wherever the area is found slippery or as and when required, including cost of transportation, loading & unloading all complete as directed by Engineer-In-Charge. | 500.00 | per kg | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos |
109 | Providing round the clock security guard without gun for watch & ward of premises including residential buildings, Substation, Pump house, STP, Anuban (Urban Forest) & all other facilities provided in Type -VE Quarters.(312 Flats) including necessary T&P like torch, lathi and uniform etc. complete as per the direction of Engineer-in-charge. (One job means 8 hours shift) Notes:- 1) No materials shall go out of the campus. 2) The person deployed shall be registered with Maharashtra Security Board & shall wear the uniforms with their gidelines.3) They have to report to the Departmental staff as directed by EIC.4) Minimum two security personnel shall be deployed in each shift.5) Unless the reliever takes over the duty, the security personnel on duty shall not leave the premises. | 2190.00 | Per Job | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos |
110 | Daily sweeping, cleaning & mopping the office area, toilet blocks & other areas in substation twice in a day with phenyled water and second with plain water, for toilets including cleaning & washing glazed tiles dado, urinal pans & channel, IWC & EWC, wash basins, mirrors with suitable cleaning powder / cleansing agent & scrubbed with appropriate brush etc. inclusive of all cost of materials, tools & plant and labour for carrying out the above cleaning, complete all as directed by the Engineer-in-charge. | 361.00 | Per Day | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos |
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos |
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only |
Quoted Rate in Words | INR Zero Only |