Items - Removal of garbage from the Port staff colony, CISF colony, RCHW colony and processing the solid waste into manure by vermi compost for the year 2025-26 and 2026-27(Two Years)
Percentage BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver4.0 | Percentage | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, At Par, Excess (+), Less (-) | IOCL | Select | Excess (+) | Less (-) | Excess (+) | Less (-) | ||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Office of the EE(C),Technical Cell, Civil Engineering Department, NMPA, Panambur, Mangalore, Karnataka-575010 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: REMOVAL OF GARBAGE FROM THE PORT STAFF COLONY, CISF COLONY, RCHW COLONY AND PROCESSING THE SOLID WASTE INTO MANURE BY VERMI COMPOST FOR THE YEAR 2025-26 AND 2026-27 (TWO YEARS) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: CIVIL/CE(C)/EE©/41/2025-26 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) [ 1) GST as applicable will be paid separately in the Tax invoice. 2) Contractor shall file the applicable returns with Tax department in time and submit the same as documentary evidence.] (The tender premium shall be filled in two decimals) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes in Rs. P | TOTAL AMOUNT With Taxes in Rs. P | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1 | BOQ perticulars | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1.01 | Removal of Garbage including all organic, inorganic waste materials, Grass, Cut Tree branches, Leaves, Dumped in and around Dustbins, Road sides and open spaces of the NMPA premises from MCF railway gate to Baikampady Over Bridge (Both side of NH66, upto west Meenakalia circle, East side observatory including all colonies, public places, office premises) collecting the materials, loading into 2.00T capacity, pickup vehicle covered properly should not be over loaded conveying and disposing the same in the manner as directed by the engineer-in-charge/Dept Daily at dumping places in NMPA suggested dumping ground and maintaining the colony and public places neat and tidy condition at all the times including cost and conveyance of all materials, labour, T&P, Hire charges of truck, loading and unloading charges and all incidental charges etc. complete as directed by the Department. (Please refer BOQ of the tender document for furter specifications) | BI01010001010000000000000515BI0100001113 | 730.00 | Ope | 4175.813 | Excess(+) | 1 | Full Conversion | INR | 3048343.49 | 3048343.49 | INR Thirty Lakh Forty Eight Thousand Three Hundred Forty Three & Paise Forty Nine Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
1.02 | Conveying and fixing of available R.C.C. dust bins in position wherever required after disposing the damaged including cost and conveyance of all labour T&P loading, Unloading, fixing in position as required and all other incidental charges all leads & lifts etc complete as directed by the dept. | BI01010001010000000000000515BI0100001114 | 20.00 | No | 253.68 | Excess(+) | 1 | Full Conversion | INR | 5073.60 | 5073.60 | INR Five Thousand Seventy Three & Paise Sixty Only | ||||||||||||||||||||||||||||||||||||||||||
1.03 | Daily Collecting and processing solid waste Garbage separately in Dry waste, Wet waste Garbage and biological waste from each quarters, covering the entire NMPA staff colony, CISF colony, Barrack and RCHW Colony including markets and transporting the collected House hold garbage by Five tri-cycles to the designated area of the solid waste collection platform near the compost pit. Later the dumped solid waste materials through the tricycles at the compost pit site shall be separated into non-Bio-degradable and Decomposable garbage. The non-Bio degradable garbage shall be stacked at designated platform and degradable garbage shall be spread in the compost pits. The rates shall include cost and conveyance of all materials, labour, T&P, all leads and lifts, minor repairs to the tricycles compressor oil etc complete as directed by the dept. Including Hire charges of the tricycles. (Minimum 5 labours should be engaged per day) | BI01010001010000000000000515BI0100001115 | 620.00 | Ope | 3989.975 | Excess(+) | 1 | Full Conversion | INR | 2473784.50 | 2473784.50 | INR Twenty Four Lakh Seventy Three Thousand Seven Hundred Eighty Four & Paise Fifty Only | ||||||||||||||||||||||||||||||||||||||||||
1.04 | Processing of solid waste by manuring of collected garbage’s including Operation of shredder, Collecting and shifting the powdered waste from shredder to vermi bins, Preparing a cow dung slurry and sprinkle it on the heap for quick decomposition, laying a layer (2 – 3 inch) of soil or sand at the bottom of the tank, preparing fine bedding by adding partially decomposed cow dung, dried leaves and other biodegradable wastes collected from fields and kitchen, Distribute them evenly on the sand layer, Continue adding both the chopped bio-waste and partially decomposed cow dung layer-wise into the tank up to a depth of 0.5-1.0 ft. After adding all the bio-wastes, release the earthworm species over the mixture and cover the compost mixture with dry straw or gunny bags. Sprinkling water on a regular basis to maintain the moisture content of the compost. collecting the manure from vermi pit by screening, relaying the earthworm into the pit without doing any harm. and maintain the bin clean and neat so that to prevent the entry of ants, lizards, mouse, snakes, etc. and protect the compost from rainwater and direct sunshine with good packing. Have a frequent check to avoid the compost from overheating. Maintain proper moisture and temperature. including keeping the entire surrounding area clean and neat.(Minimum 2 labours per day) | BI01010001010000000000000515BI0100001116 | 620.00 | Ope | 1482.80 | Excess(+) | 1 | Full Conversion | INR | 919336.00 | 919336.00 | INR Nine Lakh Nineteen Thousand Three Hundred Thirty Six & Paise Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.05 | Deploying the Specialist of Vermi technology to monitoring, advising and improving the vermin compost method | BI01010001010000000000000515BI0100001117 | 208.00 | Visit | 3300.00 | Excess(+) | 1 | Full Conversion | INR | 686400.00 | 686400.00 | INR Six Lakh Eighty Six Thousand Four Hundred & Paise Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.06 | Deploying One Supervisor with Solid waste management knowledge, having minimum 3 years’ experience in solid waste management | BI01010001010000000000000515BI0100001118 | 620.00 | days | 893.00 | Excess(+) | 1 | Full Conversion | INR | 553660.00 | 553660.00 | INR Five Lakh Fifty Three Thousand Six Hundred Sixty & Paise Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.07 | Supply the Earthworm to the Vermi bin including loading and unloading cost and conveyance of all materials, labours, etc., complete. | BI01010001010000000000000515BI0100001119 | 60.00 | Kg | 715.00 | Excess(+) | 1 | Full Conversion | INR | 42900.00 | 42900.00 | INR Forty Two Thousand Nine Hundred & Paise Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.08 | Supply of cow dung including loading and unloading cost and conveyance of all materials, labours, etc., complete. | BI01010001010000000000000515BI0100001120 | 36.00 | Cum | 3547.50 | Excess(+) | 1 | Full Conversion | INR | 127710.00 | 127710.00 | INR One Lakh Twenty Seven Thousand Seven Hundred Ten & Paise Zero Only | ||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 7857207.59 | 7857207.59 | INR Seventy Eight Lakh Fifty Seven Thousand Two Hundred Seven & Paise Fifty Nine Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |