Items - Provision of Retaining Wall of Bn HQ of Sajik Tampak Manipur
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: DIRECTORATE GENERAL ASSAM RIFLES, SHILLONG | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: Provn of Retaining Wall at Bn HQ Sajik Tampak. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: VIII.11014/9023/28 Sect AR/Engr-2025/ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder Name : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item/ Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT including all Taxes | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1 | SCHEDULE ‘A’ PART-I (Retaining Wall) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed in all kinds of soil. | 527.25 | Cum | 0.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kinds of soil. | 277.65 | Cum | 1.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.03 | Providing and laying in position cement concrete of grade 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in wall foundation. | 93.15 | Cum | 2.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.04 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with cement mortar 1:6 (1 cement : 6 coarse sand). | 540.73 | Cum | 3.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.05 | Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in retaining walls, including attached pilasters, coping, bed blocks, etc. excluding the cost of centering, shuttering and finishing. | 8.91 | sqm | 4.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for coping and PCC drain of retaining wall. | 215.60 | sqm | 5.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.07 | Raised and cut pointing pointing on stone work with cement mortar 1:3 (1 cement :3 fine sand). | 464.46 | sqm | 6.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.08 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring etc. | 196.48 | Mtr | 7.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.09 | 75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with Stone aggregate 40 mm nominal size. | 421.20 | sqm | 8.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.1 | Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in retaining walls, including attached pilasters, drain, coping, bed blocks, etc. excluding the cost of centering, shuttering and finishing. | 23.50 | Cum | 9.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.11 | Material and labour for 12 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1 cement: 4 fine sand). | 184.80 | Sqm | 10.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
1.12 | Finishing walls with water proofing cement paint of required shade New work (Two or more coats applied @ 3.84 kg/10 sqm) | 197.00 | Sqm | 11.0000 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.0000 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |