Items - Biennial contract for maintenance of Split ACs, Window ACs, Water Coolers and Air coolers in CPP.
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.1 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: General Manager, HWPM. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: Biennial contract for maintenance of Split A/C's, Window A/C's, Water Coolers, Air Coolers in CPP. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: HWPM/EU/Acs/2025/NIT, Date.23.08.2025. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE Inclusive GST In Figures To be entered by the Bidder in Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT in Rs. P | TOTAL AMOUNT | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 7 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 8 | 9 | 10 |
1 | 1.5 TR WINDOW A/C | item1 | 1 | Sub Heading 1 | item1 | |||||||||||||||||||||||||||||||||||||||||||||||||
1.01 | Servicing of 1.5 TR window a/c units including handling of units and attending breakdown maintenance at plant ,as per specifications of tender document. | item2 | 100 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | item2 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.02 | Replacement of compressor/Leak arresting and associated works including supply of freon filter, capillary and freon gas including charging of freon gas. Compressor shall be supplied by dept. at free of cost. | item3 | 10 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.03 | Shifting, Installation and testing of split A/C, Window A/C from one location to another location in case of emergencies asper specification. | item4 | 15 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | item4 | 150 | Nos | |||||||||||||||||||||||||||||||||||||
1.04 | Window a/c units dismantling with supporting shell and closing wall openings & cement plastering,painting,etc as required / as per the instructions of EIC. | item5 | 15 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | item5 | 12 | Nos | |||||||||||||||||||||||||||||||||||||
2 | 1.5 / 2.0 / 3.0 TR Split A/Cs | item1 | 1 | Sub Heading 1 | item1 | |||||||||||||||||||||||||||||||||||||||||||||||||
2.01 | Servicing of 1. 5/2.0 TR, Split a/c units attending breakdown maintenance both at plant ,as per specifications of tender documents asper specification as required. | item7 | 800 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluice plates | item7 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
2.02 | Replacement of compressor/Leak arresting and associated works for Split AC 2T including supply of freon filter, capillary and freon gas including charging of freon gas. Compressor shall be supplied by department free of cost asper specification as required. | item8 | 40 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Construction of chamber for 100mm sluices valve | item8 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
2.03 | Remote card repair of Split A/C unit of any make up to 2TR subjected to a warranty of 6 months after repair.asper specification as required. | item9 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 4 | Supplying, Conveying and fixing spls. Including ea | item9 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
2.04 | Supply of 2 TR split A/C compressor single phase ,50 HZ Model No.AWR 5530 Make TECUMSEH/KIRLOSKER or eqivalent to AW 2000 make new compressor.as require asper specification. | item10 | 20 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 5 | Supplying, Conveying and fixing spls. Including eart | item10 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
3 | WATER COOLERs | item1 | 1 | Sub Heading 1 | item1 | |||||||||||||||||||||||||||||||||||||||||||||||||
3.01 | Servicing of water cooler including cleaning of tank inside and out side once in a week with suitable cleaning agent and attending breakdown maintenance at plant as per specifications of tender documentas required. | item12 | 240 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 7 | Construction of chamber for 100mm sluices valve | item12 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
3.02 | Replacement and installation of compressor/ leak arresting of freon gas and associated works including supply of freon filter, capillary, freon gas, and charging of gas Compressor shall be supplied by dept. at free of cost. | item2 | 10 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | item2 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
3.03 | Supply of water cooler compressors 230v 50 HZ single phase 4 legs compressor Model No.SR/552/AJ11E/KCE-461 HAE, suitable for 60/150 Ltrs as suitable water cooler MakeEMERSSION/KIRLOSKER or equivalent IS marked) new compressor.as required asper specification. | item3 | 6 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
4 | Supply and installation of following suitable new parts in 1.5 TR window ACs/ 60 liters per hour water coolers. | item1 | 1 | Sub Heading 1 | item1 | |||||||||||||||||||||||||||||||||||||||||||||||||
4.01 | Starting Capacitor metallic G.C / NIKCON AS PER IS-2993(FIRE PROOF)OR Equivalent make asper specification as required. | item5 | 12 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | item5 | 12 | Nos | |||||||||||||||||||||||||||||||||||||
4.02 | Running Capacitor metallic G.C / NIKCON AS PER IS-2993(FIRE PROOF)OR Equivalent make asper specification as required. | item6 | 25 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.05 | b) CI bend 22.5° (250mm dia) | item6 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.03 | Thermostat danfoss / Ranutral make or equivalent make. | item7 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluice plates | item7 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.04 | Starting relay asper specification as required. | item8 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Construction of chamber for 100mm sluices valve | item8 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.05 | Fan motor capacitor metallic asper specification as required. | item9 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 4 | Supplying, Conveying and fixing spls. Including ea | item9 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.06 | Condenser fan blade for window a/c asper specification as required. | item10 | 5 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 5 | Supplying, Conveying and fixing spls. Including eart | item10 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.07 | Cooling air blower for Window a/c asper specification as required. | item11 | 2 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 6 | Construction of chamber for 100mm sluice plates | item11 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.08 | Condenser Fan blade matalic suitable for water cooler asper specification as required. | item12 | 5 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 7 | Construction of chamber for 100mm sluices valve | item12 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.09 | Stainless steel water taps suitable for water coolers.(Top push type asper specification as required. | item2 | 2 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | item2 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
4.10 | Stainless steel water taps suitable for water coolers asper specification as required. | item3 | 8 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
4.11 | Gasket top cover suitable for water cooler etc asper specification as required. | item4 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | item4 | 150 | Nos | |||||||||||||||||||||||||||||||||||||
4.12 | 2” PVC pipe with clamp for water cooler asper specification as required. | item5 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | item5 | 12 | Nos | |||||||||||||||||||||||||||||||||||||
4.13 | Float valve (complete set) for water cooler asper specification as required. | item6 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.05 | b) CI bend 22.5° (250mm dia) | item6 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.14 | Condenser suitable for up to 120 lit per hour water cooler. | item7 | 2 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluice plates | item7 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.15 | 1/ 2” PVC pipe with clamp to connect water tap of water cooler asper specification as required. | item8 | 12 | Mts | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Construction of chamber for 100mm sluices valve | item8 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.16 | Replacement of top door, sides and front cover and connection box for water cooler GI Sheet shall be of 1.5mm thick asper specification as required. | item9 | 2 | Set | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 4 | Supplying, Conveying and fixing spls. Including ea | item9 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.17 | Repair of bottom sheet & legs water cooler body with GI sheet metal of 2 mm thick asper specification as required. | item10 | 4 | set | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 5 | Supplying, Conveying and fixing spls. Including eart | item10 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.18 | Fan motor including capacitor. Two Rubber bushes and fixing clamps suitable for 1.5TR window ac,95 W ,1- Ph, 50Hz, 920 RPM. American Universal or equivalent make asper the specification as required. | item11 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 6 | Construction of chamber for 100mm sluice plates | item11 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.19 | Fan motor including capacitor .Two rubber bushes and fixing clamps suitable for water cooler/bottle cooler /deep freezer.65 Watts,920 RPM,1 Phase,50 HZasper specification as required. | item12 | 7 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 7 | Construction of chamber for 100mm sluices valve | item12 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
4.20 | complete remote control unit(elctronic card, power unit, remote set etc)with cells asper specification as required. | item2 | 6 | Set | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | item2 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
4.21 | Replacement of top door, sides and front cover and connection box for water cooler GI Sheet shall be of 1.5mm thick asper specification as required. | item3 | 2 | Set | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
4.22 | Repair of bottom sheet & legs water cooler body with GI sheet metal of 2 mm thick asper specification as required. | item4 | 4 | Set | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | item4 | 150 | Nos | |||||||||||||||||||||||||||||||||||||
5 | Spray painting of following type of units are as per specifications and instructions of EIC including supply of paint and all consumables. | item1 | 1 | Sub Heading 1 | item1 | |||||||||||||||||||||||||||||||||||||||||||||||||
5.01 | Window a/c units including outer shell and supports asper specification as required. | item6 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.05 | b) CI bend 22.5° (250mm dia) | item6 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
5.02 | Water coolers/bottle coolers as per specification as required. | item7 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluice plates | item7 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
5.03 | split ac out door unit including frame,stand,cover asper specification as required. | item8 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Construction of chamber for 100mm sluices valve | item8 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6 | Supply and installation of following parts in 2.0 TR/1.5 TR Split A/Cs. | item1 | 1 | Sub Heading 1 | item1 | |||||||||||||||||||||||||||||||||||||||||||||||||
6.01 | Suction & Discharge copper pipes insulating foams with tape as required at site. | item10 | 100 | Mtr | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 5 | Supplying, Conveying and fixing spls. Including eart | item10 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.02 | Single Pole Contactor asper specification as required. | item11 | 6 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 6 | Construction of chamber for 100mm sluice plates | item11 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.03 | Blower as per specification as required. | item12 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 7 | Construction of chamber for 100mm sluices valve | item12 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.04 | Condenser Fan Blades as suitable to Fan Motors , LG or Voltas make. | item2 | 30 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | item2 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
6.05 | Suction and Discharge Valves for above asper specification as required. | item3 | 20 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
6.06 | Bearing suitable for condenser / blower motor asper specification as required. | item4 | 20 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | item4 | 150 | Nos | |||||||||||||||||||||||||||||||||||||
6.07 | Split A/C air filter for 1.5TR / 2TR as per specification as required. | item5 | 5 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | item5 | 12 | Nos | |||||||||||||||||||||||||||||||||||||
6.08 | Supply and laying of copper pipe ( 1/2 " to 5/8 " ) suitable for split A/C suction and discharge asper specification as required. | item6 | 30 | Mts | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.05 | b) CI bend 22.5° (250mm dia) | item6 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.09 | Blower Motor suitable for split a/c unit. 230 volts, 50 hz a.c. | item7 | 20 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluice plates | item7 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.10 | Out door unit Condenser Fan Motor , LG or Voltas make,suitable for split A/C units of 2.0/1.5 T, as per specifications, A.C 230 volts, 50 Hz and as required. | item8 | 50 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Construction of chamber for 100mm sluices valve | item8 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.11 | 1.5 /2.0TR sensor coil make Voltas,Godrejor , LG ,etc | item9 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 4 | Supplying, Conveying and fixing spls. Including ea | item9 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.12 | Condensor coil for 1.5TR / 2TR split A/Cs as per specification as required. | item10 | 8 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 5 | Supplying, Conveying and fixing spls. Including eart | item10 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.13 | Evaparator coil for 1.5TR / 2TR split A/C as per specification as required.(indoor unit) | item11 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 6 | Construction of chamber for 100mm sluice plates | item11 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.14 | Supply and installation of new 1.5Tr split AC's of refrigerant R-32, copper condensor, as per tender specification | item12 | 10 | Set | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 7 | Construction of chamber for 100mm sluices valve | item12 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
6.15 | complete remote control unit(elctronic card, power unit, remote set etc)asper specification as required. | item2 | 2 | Set | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | item2 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
6.16 | Rewinding of cooling air blower fan motor of window ACs / Condenser fan motor of split air conditioner up to 2TR capacity.230 volts, 50 Hz single phaze and installation. | item3 | 15 | Nos | 100.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
7 | Servicing and Supply of Spares for Desert Air Coolers | item13 | 8 | Sub Heading 2 | item13 | |||||||||||||||||||||||||||||||||||||||||||||||||
7.01 | Servicing & repair of Desert Air Cooler including supply and replacement of mats | item5 | 25 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | item5 | 12 | Nos | |||||||||||||||||||||||||||||||||||||
7.02 | Fan motor with Blade & Capacitor | item6 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.05 | b) CI bend 22.5° (250mm dia) | item6 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
7.03 | Water Pump with motor | item7 | 10 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluice plates | item7 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
7.04 | Supply of Control rotary switches | item8 | 4 | Nos | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 3 | Construction of chamber for 100mm sluices valve | item8 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
8 | Battery Banks load testing activities assistance | item9 | 16 | Set | 10.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 4 | Supplying, Conveying and fixing spls. Including ea | item9 | 1 | Nos | |||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.0000 | 0.0000 | Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |