Bidhelp
The Fertilisers And Chemicals Travancore Ltd.||Head Office - FACT||Corporate materials - FACT
The Fertilisers And Chemicals Travancore Ltd.||Head Office - FACT||Corporate materials - FACT
SM(Mat)C
Kerala QTY :

Items - Painting of plant structures, pipe lines, vessels, storage tanks, equipment etc. and other connected structures at Acid Plant in FACT UC, as per tender conditions.

Tender Details
Costs
Documents
BOQ

BoQ1

Item Rate BoQ
BoQ_Ver3.0Item RateNormalINR OnlyINR
Select, Excess (+), Less (-)Less (-)
Tender Inviting Authority: The Fertilisers and Chemicals Travancore ltd., Udyogamandal, Kochi-683501
Name of Work: Painting of plant structures, pipe lines, vessels, storage tanks, equipment etc. and other connected structures at Ammonia Plant in FACT-UC.
Contract No: 03009/2025-2026/E32029
Name of the Bidder/ Bidding Firm / Company :GSTINPLACE/STATE OF WORK
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated RateService Item CodeAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty Amount in INRVAT Amount in INRFreight Charges ( Unloading & Stacking)GST in %HSN/SAC codeIIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category GSTTOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
12334675910116789108919201022232425262728293031323334353637383940414243444546474849505152111213
1Cleaning the structural / other surface neatly at all heights, manually with suitable tools or with high pressure water jet spray (using suitable machanical means), and scraping if required, to remove the whole accumulated dust, rust, dirt etc. as per departmental instructions.9000.00M20.00Excess(+)1Full ConversionINRSelect0.0000.000.00INR Zero Only11.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
2Applying one coat of surface tolerant self priming high build epoxy primer "PROTECTOMASTIC" of Berger paints or equivalent approved quality of epoxy priming coat with minimum volume of solid of 80% including cost of material,scaffolding charges,labour charges and all other incidential charges etc at all heights. complete as per departmental instructions at site.9000.00M20.00Excess(+)1Full ConversionINRSelect0.0000.000.00INR Zero Only11.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
3Applying one coat of finish paint with Acrylic Aliphatic Polyurathane coating, "BR PU HI GLOSS ENAMEL" of Berger paints or equivalent approved quality of finish paint with minimum volume of solid of 52% after cleaning the surface including cost of material,scaffolding charges,labour charges and all other incidential charges etc at all heights. complete as per departmental instructions at site.9000.00M20.00Excess(+)1Full ConversionINRSelect0.0000.000.00INR Zero Only11.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.00000.0000 Zero Only
Quoted Rate in WordsINR Zero Only