Bidhelp
Archaeological Survey of India||O/o SA-ASI-Guwahati Circle-Guwahati
Archaeological Survey of India||O/o SA-ASI-Guwahati Circle-Guwahati
SA, ASI, Guwahati Circle.
Assam QTY :

Items - Please refer tender document

Tender Details
Costs
Documents
BOQ

BoQ1

Item Rate BoQ
BoQ_Ver3.0Item RateNormalINR OnlyINR
Select, Excess (+), Less (-)Less (-)
Tender Inviting Authority: Superintending Archaeologist, Archaeological Survey of India, Guwahati Circle, Assam
Name of Work: (Upgradation Procurement of Heritage Assets) SR to Shri Suryapahar Ruins at Gaolpara as specified.
Contract No:
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder inclusive of all statutory provisions as relevant and including GST as applicable Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1Execution of worksBI01010001010000000000000515BI01000011121Construction of chamber for 100mm sluices valveitem1101 Nos
1.01Dismantling roofing including ridges, hips, valleys and gutters etc. and stacking the material within 50 m lead of G.S. sheet.94.8sqm Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.02Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.3.22sqm Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.03Renewing lime concrete in (1:2:4) of lime surkhi and brick aggregate mixing with organic material including beating up to 7 days to the floor and roof after removal of dead decomposed and deteriorated lime concrete. Materials: (For 14.22 Cum)
1.041.       Unslaked lime 2140kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.052.       Brick surkhi 3.4cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.063.       River sand 3.4cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.074.       Brick aggregate 13.5cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.085.       Mollases 35.55kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.096.       Gul nut 21.33kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.107.       Matidal 14.22kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.118.       White katha3.55kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.129.       Methi7.11kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.1310. Bel gum 142nosExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.14Provision for pointing & edging of the walls etc. with lime- sand-surkhi mortar (1:1:1) mixing with organic materials after racking the joints of wall surface including cleaning, washing etc. complete Materials: (For 118.01 sqm.)
1.151.       Unslaked lime 355.21kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.162.       Brick surkhi 0.56cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.173.       River sand 0.56cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.184.       Mollases 5.9kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.195.       Gul nut 3.54kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.206.       Matidal 2.36kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.217.       White katha0.59kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.228.       Methi1.18kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.239. Bel gum 24nos. Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.24Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil. 70.14cumExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.25Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.6.66cumExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.26Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level: Mild steel and Medium Tensile steel bars.126.29kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.27Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)9.97cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.28Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)120.12cumExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.29Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.19.05cumExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.30Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)1.57cumExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.31Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and Plinth in: Cement mortar 1:4 (1 cement:4 coarse sand)18.44cumExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.32Cement Plaster 1:4 (1 cement: 4 coarse sand) finished with a floating coat of neat cement. 20 mm cement plaster.76.36sqmExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.33Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specification: Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm400.52sqmExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.34Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specification:Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture64.43sqmExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.35Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.611.58kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.36Providing and fixing of Chain link fabric fencing mesh of size 50x50 mm made of G.I. wire of dia 4 mm39sqm Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.37Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.89.62kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.38Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m² sqm. 94.8sqmExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.39Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means/manual means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved38.43cum Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.40Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)189.31kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.41Structural steel work riveted, bolted or welded inbuilt up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a riming coat of approved steel primer all complete.142.87kg Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.42Provision for fixing radium signage on steel plate.13.04sqm Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.43Providng and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1 cement: 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of engineer-in-charge with granite stone of area less than 0.50 sqm.9.94sqm Excess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.44Provision for engraving charges on stone plate.9.94sqm Excess(+)1Full ConversionINR0.000.00INR Zero Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.45Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.13.59sqmExcess(+)1Full ConversionINR0.000.00INR Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
1.46Pointg on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Flush/ Ruled pointing88.59sqmExcess(+)1Full ConversionINR0.000.00INR Zero Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.47Supply and fixing of decorative iron benches of length .50 m of cast iron in both sides with arm and rectangular M.S. pipe in sitting and back portion fixing with PCC (1:2:4) platform of size 1.5x2.50X0.10 m for sittting facilities to the visitors including priming coat and paint etc. as per direction of Engineer-in-charge.11eachExcess(+)1Full ConversionINR0.000.00INR Zero Only2Construction of chamber for 100mm sluices valveitem310Nos
1.48Provision for supply of locally made bamboo dustbin (Eco Friendly) and firmly fixing with the MS frame to keep it erect at site as per direction of engineer in charge.15eachExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.49Providing and fixing of L.E.D solar light (12-15 watt) including all accessories.10each Excess(+)1Full ConversionINR0.000.00INR Zero Only
1.50Provision for Repair of existing Entrance gate Size: 2.05x1.80 m) on the birck on edge pathway towards the excavated site as per the direction of engineer-in-charge1eachExcess(+)1Full ConversionINR0.000.00INR Zero Only
1.51Provision for shed above the visitors benches with corrugate G.S sheet 0.35 mm thick with truss made of square bars and joined with 50 mm dia MS hollow pipes 8 ft from ground level.11eachExcess(+)1Full ConversionINR0.000.00INR Zero Only
Total in Figures0.000.00INR Zero Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.00000.0000 Zero Only
Quoted Rate in WordsINR Zero Only