Items - Construction of civil works at various locations to enable installation of STPs
Item Wise BoQ | 15 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Wise | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Director General Assam Rifles | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work:Constr of Civil Works at Various locs to enable installation of STPs at HQ IGAR (E), ARTC & S, HQ 6 Sect AR, HQ 9 Sect AR, HQ 10 Sect AR, HQ 23 Sect AR, HQ 25 Sect AR and HQ 26 Sect AR. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: VIII.11014/STP(B&R) Work/Engr/2025-26/ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (DOMESTIC TENDERS - RATES ARE TO GIVEN IN RUPEES (INR) ONLY) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder in Rs. P | Excise Duty Amount in INR Rs. P | GST Amount in INR Rs. P | Freight Charges ( Unloading & Stacking) in Rs. P | Any Other Taxes in Rs. P | Any Other Duties/Levies in Rs. P | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes col (13) = (4) x (7) in Rs. P | TOTAL AMOUNT With Taxes col (14) = sum (8) to (13) in Rs. P | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 7 | 8 | 9 | 10 | 11 | 12 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 13 | 14 | 15 |
1 | Constr of Civil Works at Various locs to enable installation of STPs at HQ IGAR (E), ARTC & S, HQ 6 Sect AR, HQ 9 Sect AR, HQ 10 Sect AR, HQ 23 Sect AR, HQ 25 Sect AR and HQ 26 Sect AR. | 1 | Construction of chamber for 100mm sluices valve | item1 | 10 | 1 Nos | ||||||||||||||||||||||||||||||||||||||||||||||||
1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | item1 | 503.40 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
1.02 | Provoding and laying Cement conctrte 1:3:6 sub base to tank | item2 | 64.05 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.03 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing andreinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size | item3 | 127.50 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.04 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more | item4 | 24750.00 | Kgs | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.05 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | item5 | 900.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.06 | Providing 20 mm thick cement plaster with CM 1:3 using 3% approved brand WPC | item6 | 900.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.07 | Supply only water proofing compound of approved make | item7 | 450.00 | Kgs | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
1.08 | Back filling with available earth including ramming, watering etc complete | item8 | 108.45 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | % | 0 | 0 | Zero Only | |||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |