Bidhelp
DG, Indo-Tibetan Border Police Force||IG, EASTERN FTR,ITBP
DG, Indo-Tibetan Border Police Force||IG, EASTERN FTR,ITBP
Dy. Commandant (Engineer)
Punjab QTY :

Items - ARM of Boundary wall for the year 2025-26 at 26th Bn ITBP, Ludhiana (Punjab)

Tender Details
Costs
Documents
BOQ

BoQ1

Percentage BoQ
BoQ_Ver3.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: DEPUTY COMMANDANT (ENGINEER), SHQ (BAREILLY), I.T.B. POLICE, BUKHARA CAMP, BAREILLY (U.P)
Name of Work: ARM of Boundary Wall for the year 2025-26at 26th Bn ITBP, Ludhiana (Punjab)
Contract No: I.T.B. Poilice/SHQ(Brly)/Engg./251 (T-26)/2025-7351 Dated-19.08.2025
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
123345789101112131415161718192021222324252627282930313233343536373839404142434445464748495051526547
1Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq-meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge, with cement mortar 1.4 (l Cement:4 coarse sand).622.20Sqm545.37Excess(+)1Full ConversionINR339329.21339329.21INR Three Lakh Thirty Nine Thousand Three Hundred & Twenty Nine and Paise Twenty One Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.2197.80Sqm151.84Excess(+)1Full ConversionINR333713.95333713.95INR Three Lakh Thirty Three Thousand Seven Hundred & Thirteen and Paise Ninety Five Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
3Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface.2197.80Sqm117.49Excess(+)1Full ConversionINR258219.52258219.52INR Two Lakh Fifty Eight Thousand Two Hundred & Nineteen and Paise Fifty Two Only2Construction of chamber for 100mm sluices valveitem310Nos
4Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work.345.95Sqm100.02Excess(+)1Full ConversionINR34601.9234601.92INR Thirty Four Thousand Six Hundred & One and Paise Ninety Two Only
Total in Figures965864.60965864.60INR Nine Lakh Sixty Five Thousand Eight Hundred & Sixty Four and Paise Sixty Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.00INR Zero Only
Quoted Rate in WordsINR Zero Only