Items - MCW works at BSC Jammikunta for the year 2025-26. S.H. Providing grilled sliding door shutters.
Percentage BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.1 | Percentage | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, At Par, Excess (+), Less (-) | IOCL | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: AGM(Engg) FCI RO HYDEREABAD | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: MCW works at BSC Jammikunta for the year 2025-26. S.H: Providing grilled sliding door shutters to godowns | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: ENGG/09/2025-26 dtd.20.08.2025 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes in Rs. P | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 7 | 54 | 8 |
1 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 1 | 22200.000 | Kg | 172.60 | Excess(+) | 1.00 | Full Conversion | INR | 3831720.00 | 3831720.00 | INR Thirty Eight Lakh Thirty One Thousand Seven Hundred & Twenty Only | 1 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 1 | 22200 | Kg | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||
2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | 2 | 687.000 | Sqm | 226.25 | Excess(+) | 1.00 | Full Conversion | INR | 155433.75 | 155433.75 | INR One Lakh Fifty Five Thousand Four Hundred & Thirty Three and Paise Seventy Five Only | 2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | 2 | 687 | Sqm | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||
3 | Cutting holes of required size in brick masonry wall/stone masonry wall/cement concrete wall and fixing M.S iron hold fasts by embedding in cement concrete holes in 1:3:6 | 3 | 360.000 | Each | 652.15 | Excess(+) | 1.00 | Full Conversion | INR | 234774.00 | 234774.00 | INR Two Lakh Thirty Four Thousand Seven Hundred & Seventy Four Only | 3 | Cutting holes of required size in brick masonry wall/stone masonry wall/cement concrete wall and fixing M.S iron hold fasts by embedding in cement concrete holes in 1:3:6 | 3 | 360 | Each | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||
4 | Demolishing Cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 4 | 30.000 | Cum | 2434.25 | Excess(+) | 1.00 | Full Conversion | INR | 73027.50 | 73027.50 | INR Seventy Three Thousand &Twenty Seven and Paise Fifty Only | 4 | Demolishing Cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 4 | 30 | Cum | Supplying, Conveying and fixing spls. Including ea | item4 | 10 | Nos | |||||||||||||||||||||||||||||||||
5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in- charge, beyond 50 m initial lead, for all leads including all lifts involved. | 5 | 30.000 | Cum | 263.95 | Excess(+) | 1.00 | Full Conversion | INR | 7918.50 | 7918.50 | INR Seven Thousand Nine Hundred & Eighteen and Paise Fifty Only | 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in- charge, beyond 50 m initial lead, for all leads including all lifts involved. | 5 | 30 | Cum | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||
6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutterin- All work up to plinth level: 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-III) derived from naturalsources : 3 graded stone aggregate 20mm nominal size derived from natural sources) | 6 | 20.000 | Cum | 8340.85 | Excess(+) | 1.00 | Full Conversion | INR | 166817.00 | 166817.00 | INR One Lakh Sixty Six Thousand Eight Hundred & Seventeen Only | 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutterin- All work up to plinth level: 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-III) derived from naturalsources : 3 graded stone aggregate 20mm nominal size derived from natural sources) | 6 | 20 | Cum | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||
Total in Figures | 4469690.75 | 4469690.75 | INR Forty Four Lakh Sixty Nine Thousand Six Hundred & Ninety and Paise Seventy Five Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |