Bidhelp
DG, Indo-Tibetan Border Police Force||IG, EASTERN FTR,ITBP
DG, Indo-Tibetan Border Police Force||IG, EASTERN FTR,ITBP
COMMANDANT 30TH BN
Punjab QTY :

Items - ARMOF NON RESIDENTIAL BUILDING CIVIL WORK FOR THE YEAR 2025-26 AT 30TH BN ITB POLICE JALANDHAR PUNJAB

Tender Details
Costs
Documents
BOQ

BoQ1

Percentage BoQ
BoQ_Ver4.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCLSelectExcess (+)Less (-)Excess (+)Less (-)
Tender Inviting Authority: COMANDANT 30TH BN ITB POLICE JALANDHAR PUNJAB.
Name of Work: Annual repair and maintenance of Non Residential Building (Civil Work) for the year 2025-26 at 30th Bn ITB Police Jalandhar (Punjab). (Sh: Distempering & Painting).
Contract No: 3804-05 DATED:- 20.08.2025
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. PTOTAL AMOUNT With Taxes in Rs. PTOTAL AMOUNT In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1DISTEMPERING AND PAINTINGBI01010001010000000000000515BI01000011121Construction of chamber for 100mm sluices valveitem1101 Nos
1.01Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. BI01010001010000000000000515BI0100001113102.44Sqm151.8367Excess(+)1Full ConversionINR15554.1515554.15INR Fifteen Thousand Five Hundred Fifty Four & Paise Fifteen Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
1.02Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, including applying additional coats wherever required, to achieve even shade and colour. (Old Work one or more coats) BI01010001010000000000000515BI01000011182342.383Sqm61.0071Excess(+)1Full ConversionINR142901.99142901.99INR One Lakh Forty Two Thousand Nine Hundred One & Paise Ninety Nine Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.03Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: One or more coats on old work.BI01010001010000000000000515BI0100001122810.13Sqm100.0244Excess(+)1Full ConversionINR81032.7781032.77INR Eighty One Thousand Thirty Two & Paise Seventy Seven Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.04Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surfaceBI01010001010000000000000515BI01000011231513.65Sqm117.49Excess(+)1Full ConversionINR177838.74177838.74INR One Lakh Seventy Seven Thousand Eight Hundred Thirty Eight & Paise Seventy Four Only2Construction of chamber for 100mm sluices valveitem310Nos
1.05Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. Meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1 cement : 4 fine sand).BI01010001010000000000000515BI0100001124102.44Sqm532.62Excess(+)1Full ConversionINR54561.5954561.59INR Fifty Four Thousand Five Hundred Sixty One & Paise Fifty Nine Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
Total in Figures471889.24471889.24INR Four Lakh Seventy One Thousand Eight Hundred Eighty Nine & Paise Twenty Four Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.00INR Zero Only
Quoted Rate in WordsINR Zero Only