Items - CONTRACT FOR MISC. URGENT JOBS RELATED TO TRANSPORT OF UREA REACTOR FOR UNIT 11 AND 31 AT RCF THAL

Tender Details
Costs
Documents
BOQ

BoQ1

Percentage BoQ
BoQ_Ver3.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: DGM (CC) RCF LTD THAL
Name of Work: NOTICE INVITING TENDER FOR THE JOB OF MISC. URGENT JOBS RELATED TO TRANSPORT OF UREA REACTOR FOR UNIT 11 AND 31 AT RCF THAL
E-TENDER No: TH/CC/86381/25/D24-02(II)/085
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsRateAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without TaxesTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051527548
1.01Earthwork in excavation by Mechanical means (Hydraulic Excavator)/ Manual means in foundations of buildings, footings, columns, plinth beams, walls machine / equipment foundations isolated pits, pavements, trenches for pipelines / cables, pipe sleepers drains etc., to the required levels and grades in both dry and wet conditions,including dewatering, ramming of bottoms, getting out including dressing of sides and excavated earth with lift up to 1.5 M and disposal of surplus excavated materials within a lead of 500.00 M including stacking, leveling and dressing etc., complete as per direction of Engineer-in-charge in all kinds of soils including providing temporary supports to all service lines such as overhead and underground water sewage and drain pipes, cables etc and shoring and strutting wherever necessary, complete in all respects as per direction of Engineer- in - ChargeC622016001100.00Cu.M207.00Excess(+)1Full ConversionINR20700.0020700.0000INR Twenty Thousand Seven Hundred Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
1.02Filling with available excavated good earth (excluding rocks / boulders), as approved and directed by Engineer Engineer in-Charge, in trenches, plinth, under floors, sides of foundation etc., at all depths in layers not exceeding 20 cms. in thickness including consolidating and dressing each deposited layer by ramming with lead up to 500.00 meters complete in all respects.C622016002260.00Cu.M120.00Excess(+)1Full ConversionINR31200.0031200.0000INR Thirty One Thousand Two Hundred Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.03Removal and carriage of surplus excavated earth, debris, dismantled materials etc., from the site of work to other areas anywhere within the factory upto 3 KM / plant battery limits beyond the initial lead of 500 M and spreading and leveling the same including loading and unloading as per the direction of Engineer-in- Charge.C62201600330.00TRIPS1354.00Excess(+)1Full ConversionINR40620.0040620.0000INR Forty Thousand Six Hundred & Twenty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.04Providing & Laying 20-23 CM thick dry stone Rubble Soling hard stone set in regular lines, handpacked and interstices thoroughly filled with small chips including filling in with good quality murum brought from RCF premises, compacting with iron rammers, watering, metal-1 with grit spreading 12mm thk. layer on top etc complete as directed by Engineer In Charge.complete as directed.C622016004220.00Cu.M1382.00Excess(+)1Full ConversionINR304040.00304040.0000INR Three Lakh Four Thousand &Forty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.05Supplying, spreading and levelling of dry trap rubble/metal size of 1/2/3 nos packing average size as per EIC for bedding in pond base area in thickness as directed by EIC including cutting of existing liner/membrane in proper shape whwrever required, removal of sludge/slush and unwanted materials/debris at base area of pond as directed, necessary labour etc. complete.C622016005210.00Cu.M1457.00Excess(+)1Full ConversionINR305970.00305970.0000INR Three Lakh Five Thousand Nine Hundred & Seventy Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.06Providing and laying plain cement concrete, manual / machine mixed and manual / mechanically vibrated in foundations, plinth, under floors, under IPS at floor level etc., including all necessary cost of centring and shuttering & curing etc. complete in ratio of : 1:3:6 (1 cement: 3 fine aggregate :6 graded stone aggregate 20 mm nominal size). The minimum cement content irrespective of design mix should be 240 kg/cum.C6220160065.00Cu.M5538.00Excess(+)1Full ConversionINR27690.0027690.0000INR Twenty Seven Thousand Six Hundred & Ninety Only2Construction of chamber for 100mm sluices valveitem310Nos
1.07Providing and laying reinforced cement concrete of grade M - 25 (using 20 mm, nominal gauge graded stone aggregate) machine mixed and mechanically vibrated and finished to a fair face including the cost of centering, shuttering and reinforcement in foundation,superstructure and plinth for: rafts, footings, bases of columns, pedestals, beams, walls, columns, machine and equipment foundations, pile caps, box sections, pipe supports, cable trench, drains etc., complete in all respects as per direction of Engineer -in- Charge .The minimum cement content irrespective of design mix should be 350 kg/cum.C62201600715.00Cu.M6922.00Excess(+)1Full ConversionINR103830.00103830.0000INR One Lakh Three Thousand Eight Hundred & Thirty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.08Providing and fixing in position precast reinforced cement concrete of grade M-25 ( using 12.5 mm. nominal gauge graded stone aggregate), machine mixed, mechanically vibrated and finished to a fair face including centring, shuttering etc. but excluding the cost of reinforcement in kerb stones and Trench/ drain covers, in foundation and plinth. The minimum cement content irrespective of design mix should be 350 kg/cum.C6220160087.00Cu.M11631.00Excess(+)1Full ConversionINR81417.0081417.0000INR Eighty One Thousand Four Hundred & Seventeen Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.09Providing and fixing in position steel bars reinforcement of various diameters for R.C.C. pile, pile caps,footings,raft,retaining wall,shear wall, lift wall,foundations, slabs, beams, columns, canopies,staircases, newels, chajjas, lintels, pardies,coping, fins, arches, etc. as per detailed designs,drawings and bar bending schedules,including straightening,cutting, bending, hooking the bars, binding with wires or tack welding, supporting as required etc. including binding with 18 SWG annealed wire, Thermo-Mechanically Treated steel bars HYSD/TMT/ steel reinforcements as per IS: 1786 including all necessary handling at all heights and depths complete in all respects and as per direction of the Engineer-in Charge (Fe 500D of only TATA/SAIL/JINDAL/RINL make steel to be used)C6220160091.50MT89703.00Excess(+)1Full ConversionINR134554.50134554.5000INR One Lakh Thirty Four Thousand Five Hundred & Fifty Four and Paise Fifty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.10Providing Supplying, de-rusting by shot blasting fabricating, erecting, hoisting and fixing in position structural steel work in rolled steel joints, channels, angles tees, flats, plates, lattice members built up / compound sections in columns, portals, girders, beams, bracings, trusses, purlins, rafters, staircase, steps, hand-railings, walkway, cat ladder with cages, toe plates, side walling, trestles, Conveyor gantries etc. including gusset plates, etc., including site and shop fasteners, riveting, bolting, welding at shop or work site at all heights including scaffolding with MS Pipe etc complete as directed by EIC. (All material supply is in contractor’s scope including one coat of anticorrosive paint(Zinc rich primer) and over it two coats of epoxy painting of approved quality and shade etc. complete. (As per TS). (only TATA/SAIL/JINDAL/RINL make steel to be used) .C6220160100.50MT97759.00Excess(+)1Full ConversionINR48879.5048879.5000INR Forty Eight Thousand Eight Hundred & Seventy Nine and Paise Fifty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.11Dismantling the existing structural steel works in columns, portals, beams, girders, bracings, trusses rafters, purlins, stair cases, steps gantries, trestles, walkways, railing side runners, louvers, etc., in single section/ built up or compound section in R.S. joists, channels, angles, tees, plates, base plates, lacings, bolts nuts, cutting rivets / welding at all heights including lowering down the steel canopy structure carefully and stacking separately the serviceable, handing over the same to the Owner's / Consultant's store/scrap yard at site and disposal of unserviceable materials to store/scrap yard in factory, complete in all respects and as directed by Engineer -in- Charge.Payment as per RCF weigh bridge weighment challan.(Crane will be supplied by RCF on nonchargeable basis.). C6220160112.00MT3237.00Excess(+)1Full ConversionINR6474.006474.0000INR Six Thousand Four Hundred & Seventy Four Only2Construction of chamber for 100mm sluices valveitem310Nos
1.12Fabricating structural steel work in rolled sections, fixed with connecting plates or angle cleats in main and cross beams, hip and jack rafters, purlins connecting to truss members, joists, channels, angles, tees gratings, railing, GI Pipe, gratting etc. as per detailed designs and drawing or as directed including cutting, fabricating, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of epoxy painting complete (RCF will supply only structural steel and consumable gases if available free of cost at RCF stores Contractor has to shift the material from stores to site at own cost.)(Crane will be supplied by RCF on nonchargeable basis.). C6220160122.00MT22234.00Excess(+)1Full ConversionINR44468.0044468.0000INR Forty Four Thousand Four Hundred & Sixty Eight Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.13Providing and constructing brick work using bricks of class designation 3.5(50) in cement mortar 1:6 ( 1 cement : 6 coarse sand ) in :Foundation, plinth and Superstructure at all heights. C6220160133.00Cu.M7514.00Excess(+)1Full ConversionINR22542.0022542.0000INR Twenty Two Thousand Five Hundred & Forty Two Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.14Providing & constructing uncoursed rubble stone masonry in cement mortar 1:6 ( 1 cement : 6 coarse sand ) in : Foundation, plinth and Superstructure at all heights. C6220160145.00Cu.M5534.00Excess(+)1Full ConversionINR27670.0027670.0000INR Twenty Seven Thousand Six Hundred & Seventy Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.15Providing external cement plaster 20mm thick in Single coats in cement mortar 1:5 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. completeC62201601530.00Sq.M375.00Excess(+)1Full ConversionINR11250.0011250.0000INR Eleven Thousand Two Hundred & Fifty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.16Providing & applying two or more coats of 100% exterior grade acrylic emulsion paint (Weathershield or Apex) colour /shade as per approved brand and make to exterior old/ new RCC/Masonry surfaces after one coat of compatible waterproof primer, necessary cleaning etc. complete as directed by EIC.C62201601630.00Sq.M174.00Excess(+)1Full ConversionINR5220.005220.0000INR Five Thousand Two Hundred & Twenty Only2Construction of chamber for 100mm sluices valveitem310Nos
1.17Providing flush grooved pointing for stone masonry in cement mortar-1:3. at all positions including scaffolding as directed.C62201601715.00Sq.M182.00Excess(+)1Full ConversionINR2730.002730.0000INR Two Thousand Seven Hundred & Thirty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.18Demolishing existing plain cement concrete work including RCC , bituminous road etc. at all heights / depths including disposal of materials debris & scrap metal within RCF factory premises within a lead of 3 km., complete as directed by Engineer-in-Charge.C6220160185.00CuM1451.00Excess(+)1Full ConversionINR7255.007255.0000INR Seven Thousand Two Hundred & Fifty Five Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.19Demolishing existing brick / stone masonry work in cement mortar (any proportion at any heights / depths including stacking of serviceable materials and disposal of unserviceable within a lead of 3 km., complete as directed by Engineer-in-ChargeC6220160195.00CuM335.00Excess(+)1Full ConversionINR1675.001675.0000INR One Thousand Six Hundred & Seventy Five Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.20Removing carefully roofing (metallic/cement/polycarbonate) without damaging at any height including ridges, hips, valleys and gutters etc., and stacking the material within 100 metres lead. C62201602050.00Sq.M60.00Excess(+)1Full ConversionINR3000.003000.0000INR Three Thousand Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.21Providing & applying two coats of synthetic enamel painting over one coat of primer of approved manufactured as directed to steel surface.C62201602150.00Sq.M96.00Excess(+)1Full ConversionINR4800.004800.0000INR Four Thousand Eight Hundred Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.22Removal and carriage of Kerb stones/precast covers dismantled materials etc., from the site of work to other areas anywhere within the factory upto 3 KM / plant battery limits and refixing at the original site after clearance of completion of job as per directed by EIC.C62201602250.00nos212.00Excess(+)1Full ConversionINR10600.0010600.0000INR Ten Thousand Six Hundred Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.23Removal and carriage of electric poles dismantled materials etc., from the site of work to other areas anywhere within the factory upto 3 KM / plant battery limits.C6220160232.00NO500.00Excess(+)1Full ConversionINR1000.001000.0000INR One Thousand Only2Construction of chamber for 100mm sluices valveitem310Nos
1.24Supply of JCB/Hydra/Truck with tools, tackels with manpwer for loading,unloading for activites not covered in items /for site clearance for 8 hrs (min two hrs payable ,rest pro rata)C62201602410.00SHIFT8000.00Excess(+)1Full ConversionINR80000.0080000.0000INR Eighty Thousand Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.25Compacting the subgrade/metal layer etc. With static/vibratory roller as directed by eic. Including necessary labour, materials, watering etc. Complete as directed by EIC.C622016025550.00Sq.M37.00Excess(+)1Full ConversionINR20350.0020350.0000INR Twenty Thousand Three Hundred & Fifty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.26Providing & Fixing in position Misc. Materials not covered in the Schedule of rates mentioned above including transporting, loading, unloading at site etc. (cash receipt to be submitted).C62201602630000.00NO1.10Excess(+)1Full ConversionINR33000.0033000.0000INR Thirty Three Thousand Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.27Supply of Welder / Fitter / Cutter including consumable and machinery, tools as directed by EIC. (FOR 8HRS SHIFT) for items not covered in above schedule of items. (RATE AS PER HR CIRCULAR FOR MIN. WAGES WHICH IS PRESENTLY Rs.807.23/REVISION IN CIRCULAR) (IN ADDITION TO MIN. WAGES, PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE TO BE PAID HENCE TOTAL DERIVED RATE TO BE PAID TO CONTRACTOR WILL BE Rs.807.23/REVISION IN CIRCULAR + PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE PRESENTLY PER DAY) NOTE: THIS IS FIXED RATE. QUOTED PERCENTAGE NOT APPLICABLE.C6220160275.00NO1005.64Excess(+)1Full ConversionINR5028.205028.2000INR Five Thousand &Twenty Eight and Paise Twenty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.28Supply of Rigger/Helper including consumable and machinery, tools as directed by EIC. (FOR 8HRS SHIFT) for items not covered above in above schedule of items.(RATE AS PER HR CIRCULAR FOR MIN. WAGES WHICH IS PRESENTLY Rs.765.69/REVISION IN CIRCULAR) (IN ADDITION TO MIN. WAGES, PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE TO BE PAID HENCE TOTAL DERIVED RATE TO BE PAID TO CONTRACTOR WILL BE Rs.765.69/REVISION IN CIRCULAR + PF 13% + BONUS 8.33% + ESIC 3.25% AS APPLICABLE PRESENTLY PER DAY) NOTE: THIS IS FIXED RATE. QUOTED PERCENTAGE NOT APPLICABLE.C62201602810.00NO953.89Excess(+)1Full ConversionINR9538.909538.9000INR Nine Thousand Five Hundred & Thirty Eight and Paise Ninety Only2Construction of chamber for 100mm sluices valveitem310Nos
1.29Providing and laying approved three component ,high performance ,high precision,low exothermic,pourable/hand applied,solvent free epoxy grout for walls,concrete,slab, racks,footings,pedastal,columns etc suitable by providing necessary scaffolding after curing ,cleaning etc complete.(Make Sikadur 42 IN or equivalent approved by EIC). (This item shall be paid on actual consumption of material used in Kgs).Weighment to be done at RCF weigh bridge during entry of Material at Gate.)C622016029600.00KG250.00Excess(+)1Full ConversionINR150000.00150000.0000INR One Lakh Fifty Thousand Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
Total in Figures1545502.101545502.1000INR Fifteen Lakh Forty Five Thousand Five Hundred & Two and Paise Ten Only
Quoted Rate in FiguresSelect0.000.0000INR Zero Only
Quoted Rate in WordsINR Zero Only
NOTE: BIDDERS TO SELECT EXCESS PERCENTAGE IN FIGURES ONLY. TAXES APPLICABLE ON THE SERVICE IS ONLY GST AS PER THE APPLICABLE PERCENTAGE QUOTED BY THE BIDDER IN TECHNICAL BID, ANNEXURE-III, Sr. No. 28