Bidhelp
THDC India Limited||Tehri-THDC India Ltd||Planning Department-THDC India Ltd
THDC India Limited||Tehri-THDC India Ltd||Planning Department-THDC India Ltd
AGM(PLANNING/PROCUREMENT)
Uttarakhand QTY :

Items - Annual Sweeping Cleaning Mopping of Urja Sanchay Bhawan PSP Office Complex at B.Puram

Tender Details
Costs
Documents
BOQ

Annexure-A

BOQ (Schedule -A) / PRICE BID FORMAT
Name of Work : Annual Sweeping Cleaning & Mopping of Urja Sanchay Bhawan PSP Office Complex at B.Puram.
Tender No: THDC/TEHRI/PROC/LIMITED/2025-26/22
Name of Bidder
S/No Category of Manpower/Description of WorkUnitManpower Required per day Quantity (Total man-day days=Total Working Days x Manpower Required per day )Minimum wages wef 01.10.2020PPE's 1.5% on minimum wagesT & P @ 1.00%Total Fixed CostTotal Estimated Bidder's charges /profit (overheads)To be quoted by Bidder's Total Charges/Profit (Overheads) in Percentage (%) Over and above Minimum wagesTotal Charges/Profit (Overheads) Quoted by Bidder (in Rs.)Total Rate including profits quoted by bidder (in Rs.)Total Amount for Contract Period (After Quoted by Bidder( excluding GST)
123467= (6)*1.5%(8) =(6)X1%(9)=(6)+(7)+(8)(10)=(6)*10%1112=(11)*(6)13=(12)+(9)14= (13)*(4)
1Sweeping,cleanning & Mopping work of PSP building such as mopping of internal area, & drains, collecting wast papers & other wastes from the dust bins, removing unwanted vegetation growth cleaning of water closet,urinal, wash basins, toilet& dedo tiles and other cleaning work as directed by the E -I-etc.i/c of all labours and T&P required for proper completion of work.
1.1supervisor ( Semi skilled labour )Nos12896329.486.32647.863.20647.8187214.2
1.2Safai Nayak ( unskilled labour)Nos617345418.125.410554.5354.10554.53961555.02
Total Amount ₹ 1,148,769.22
TOTAL AMOUNT₹ 1,148,769.22
Total amount of statutary reqirements for contract period in (Rs.)
EPF @ 12 % + EDLI @1 %(13 % of minimum wages) (Rs.) (to be reimbursed on documentary proof)₹ 145,696.46
ESI @ 3.25 % OF Minimum wages max limit upto Rs21000.00/month (Rs.) (to be reimbursed on documentary proof)₹ 36,424.12
Bonus @ 8.33 % of Minimum wages( Rs)₹ 93,357.81
Leaves compensation Charges (12 CL + 03 NH) = ((12+3)/289)*100 = 5.19% OF minimum wages₹ 58,166.51
Note:
1Bidder has to Quote their total charges/profit (in %) in coloumn K which should not be less than 5% of minimum wages, If the bidder quotes less than 5% of minimum wages under colum-K [Total Charges/Profit (Overheads) in %] for any item, the bid shall be treated as "Non responsive" and will be leable for rejection.
2EPF& ESI shall be rembursed as per actual based on documentary proof.
3Minimum wages shall be payable/adjustable as applicable time to time as per Government norms.

Annexure-A1

Percentage BoQ
BoQ_Ver3.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: AGM, Procurement
Name of Work: Annual Sweeping Cleaning & Mopping of Urja Sanchay Bhawan PSP Office Complex at B.Puram.
Contract No: THDC/TEHRI/PROC/LIMITED/2025-26/22 ( Annexure A1)
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate(Including bidder Profit) in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT(including bidders profit) in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
123345789101112131415161718192021222324252627282930313233343536373839404142434445464748495051526547
1Disposing of the collecting garbage at mukari dumping point through mechanical transport i/c cost of loding & unloding BI01010001010000000000000515BI010000111562.40CUM127.360Excess(+)1Full ConversionINR7947.267947.26INR Seven Thousand Nine Hundred & Forty Seven and Paise Twenty Six Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
Total in Figures7947.267947.26 Seven Thousand Nine Hundred & Forty Seven and Paise Twenty Six Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.00INR Zero Only
Quoted Rate in WordsINR Zero Only

BoQ1

Percentage BoQ
BoQ_Ver3.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: AGM, Procurement
Name of Work: Annual Sweeping Cleaning & Mopping of Urja Sanchay Bhawan PSP Office Complex at B.Puram.
Contract No: THDC/TEHRI/PROC/LIMITED/2025-26/22 (Annexure B(BoQ1))
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate(Including bidder Profit) in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT(including bidders profit) in Rs. PTOTAL AMOUNT (including bidders profit)TOTAL AMOUNT In Words
123345789101112131415161718192021222324252627282930313233343536373839404142434445464748495051526547
1Cleaning consumables1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
1.01Floor Cleaner ( Lizol)BI01010001010000000000000515BI0100001115180.00Ltr219.065Excess(+)1Full ConversionINR39431.7039431.70INR Thirty Nine Thousand Four Hundred & Thirty One and Paise Seventy Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.02Toilet cleaner ( harpic)BI01010001010000000000000515BI010000111684.00Ltr195.767Excess(+)1Full ConversionINR16444.4316444.43INR Sixteen Thousand Four Hundred & Forty Four and Paise Forty Three Only2Construction of chamber for 100mm sluices valveitem310Nos
1.03Glass cleaner ( colin)BI01010001010000000000000515BI010000111724.00Ltr209.748Excess(+)1Full ConversionINR5033.955033.95INR Five Thousand &Thirty Three and Paise Ninety Five Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.04PhenylBI01010001010000000000000515BI0100001118180.00Ltr65.25Excess(+)1Full ConversionINR11745.0011745.00INR Eleven Thousand Seven Hundred & Forty Five Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.05Handwash (Dettol)BI01010001010000000000000515BI010000111960.00Ltr90.42Excess(+)1Full ConversionINR5425.205425.20INR Five Thousand Four Hundred & Twenty Five and Paise Twenty Only2Construction of chamber for 100mm sluices valveitem310Nos
1.061Room FreshnerBI01010001010000000000000515BI010000112096.00No144.496Excess(+)1Full ConversionINR13871.6213871.62INR Thirteen Thousand Eight Hundred & Seventy One and Paise Sixty Two Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.062Napthalin ballsBI01010001010000000000000515BI010000112124.00kg358.897Excess(+)1Full ConversionINR8613.538613.53INR Eight Thousand Six Hundred & Thirteen and Paise Fifty Three Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.07Toilet air Fareshner(Odonil)BI01010001010000000000000515BI010000112260.00No44.748Excess(+)1Full ConversionINR2684.882684.88INR Two Thousand Six Hundred & Eighty Four and Paise Eighty Eight Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.08Floor cleaning Broom ( Hard)BI01010001010000000000000515BI010000112360.00No46.607Excess(+)1Full ConversionINR2796.422796.42INR Two Thousand Seven Hundred & Ninety Six and Paise Forty Two Only2Construction of chamber for 100mm sluices valveitem310Nos
1.091wiperBI01010001010000000000000515BI010000112460.00No247.038Excess(+)1Full ConversionINR14822.2814822.28INR Fourteen Thousand Eight Hundred & Twenty Two and Paise Twenty Eight Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.092toilet brushBI01010001010000000000000515BI010000112560.00No102.54Excess(+)1Full ConversionINR6152.406152.40INR Six Thousand One Hundred & Fifty Two and Paise Forty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.10Mop BI01010001010000000000000515BI010000112660.00No35.42Excess(+)1Full ConversionINR2125.202125.20INR Two Thousand One Hundred & Twenty Five and Paise Twenty Only2Construction of chamber for 100mm sluices valveitem310Nos
1.11dry mopBI01010001010000000000000515BI010000112748.00No773.729Excess(+)1Full ConversionINR37138.9937138.99INR Thirty Seven Thousand One Hundred & Thirty Eight and Paise Ninety Nine Only3Supplying, Conveying and fixing spls. Including eaitem410Nos
1.12DusterBI01010001010000000000000515BI010000112896.00No18.65Excess(+)1Full ConversionINR1790.401790.40INR One Thousand Seven Hundred & Ninety and Paise Forty Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.13Dust panBI01010001010000000000000515BI010000112972.00No65.252Excess(+)1Full ConversionINR4698.144698.14INR Four Thousand Six Hundred & Ninety Eight and Paise Fourteen Only2Construction of chamber for 100mm sluices valveitem310Nos
1.14Floor cleaning Broom ( Shoft)BI01010001010000000000000515BI010000113060.00No102.542Excess(+)1Full ConversionINR6152.526152.52INR Six Thousand One Hundred & Fifty Two and Paise Fifty Two Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
1.15Bleaching powderBI01010001010000000000000515BI010000113124.00Kg335.588Excess(+)1Full ConversionINR8054.118054.11INR Eight Thousand &Fifty Four and Paise Eleven Only2Construction of chamber for 100mm sluices valveitem310Nos
Total in Figures186980.77186980.77 One Lakh Eighty Six Thousand Nine Hundred & Eighty and Paise Seventy Seven Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.00INR Zero Only
Quoted Rate in WordsINR Zero Only

Annexure-C

Name of Work: Annual Sweeping Cleaning & Mopping of Urja Sanchay Bhawan PSP Office Complex at B.Puram.
Contract No: THDC/TEHRI/PROC/LIMITED/2025-26/22
Name of the Bidder :
PRICE BID SUMMARY SHEET FORMAT
S.N.ParticularAmount(Rs.)
1Grand Total of price Schedule as per Annexure 'A' (excluding EPF/ESI, Bonus, Leaves compensation)1148769.22
2Grand Total of price Schedule as per Annexure 'A1'0.00
3Grand Total of price Schedule as per Annexure 'B' (BoQ1)0.00
TOTAL1148769
EPF on Annexture-A of BOQ145696.46
ESI on Annexture-A of BOQ36424.12
Bonus on Annexure-A of BOQ93357.81
Leaves Compensation on Annexure-A of BOQ58166.51
TOTAL1482413.90
GST@18%266834.50
GRANT TOTAL (Including EPF/ESI, Bonus Leave Compensation & GST)1749248.40
NOTE:
1. EPF & ESI shall be reimbursed as per actual based on documentary proof.