Items - Resurfacing of Asphalt Patrolling road for security around INRP Project, NRB, Tarapur.
Item Rate BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Rate | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | Less (-) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Project Director, INRPC, NRB, BARC. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: Resurfacing of Asphalt Patrolling road for security around INRP Project, NRB, Tarapur. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
NIT No: BARC/NRB(T)/INRPC/PTC-131/2025/ 1461 Date: 21/08/2025 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only. Rebate/Discount shall be entered in Row No.23 ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | RATE (With Tax) In Figures To be entered by the Bidder in Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT (With Tax) in Rs. P | TOTAL AMOUNT With Taxes | TOTAL AMOUNT (With Tax) In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 |
1 | Labour charge for murum filling under floor of specified thick in layer of not exceeding 150 mm thickness including consolidation etc. complete. (using murum available at site) Note: a) Only compacted volume will be measured and paid, b) Selected / approved excavated stuff stored within the DAE premises shall be issued free of cost to the contractor for filling purposes. | 1650 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||||
2 | Providing and laying in position cement of 1:3:6 ( 1 cement, 3 crushed sand, 6 graded stone aggregate of nominal size 20 mm) including consolidation, finishing, curing etc. complete as per specification and Drawing but excluding the cast of Form work shuttering, centering and steel reiforcement at all levels. | 140 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
3 | Providing, centering, shuttering Form work using steel plates, timber planks for all types of structures including necessary strutting, proping, staging, supports, bracings etc. and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels- For Sub Structure | 250 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
4 | Providing and laying non pressure NP2 class RCC Hume pipes of approved make, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2, laying to the levels, slopes and as per the drawings and specifications and as directed by the Engineer-in-charge including testing of joints etc. complete- 450 mm Dia RCC Hume pipe class Np2 | 275 | Mtr | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
5 | Providing and laying, spreading and compacting granular sub-base (GSB) material 300 mm thick (150 mm thick in each layer) compacted layer of crushed sand, murrum, gravel crushed stone and combination there of as per specification including spreading on the prepared sub grade, maintaining the required slope and grade and cross fall (camber) etc. complete as directed by the Engineer-in-charge (Compacted thickness only will be measured and paid for.) | 775 | Cum | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
6 | Providing and applying tack coat using hot straight run bitumen of grade 60/70 (VG 20) including heating the bitumen, spraying the bitumen mechanically / manually, cleaning and preparing the existing road surface as per specifications on bituminous surface @ 0.75 kg /sqm. | 10800 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
7 | Providing laying bituminous macadam of thickness 50 to 75 mm as directed on prepared surface with specified graded crushed stone aggregate for profile corrective base / binder course including loading of aggregate with FE loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixed material by tippers to paver and laying the mixed material with paver to the required level and grade and rolling with road rollers, as per specification to achieve the proper compaction but excluding the cost of primer / tack coat with bitumen of 60/70 grade (VG 20) @ 3.5% (percentage by weight of total mix) | 1100 | MT | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
8 | Providing and applying tack coat using hot straight run bitumen of grade 60/70 (VG 20) including heating the bitumen, spraying the bitumen mechanically / manually, cleaning and preparing the existing road surface as per specifications on bituminous surface @ 0.50 kg /sqm. | 10800 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
9 | Providing and laying seal coat average 9.00 mm thickness of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade 60/70 (VG 20) bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road roller all complete. | 10800 | Sqm | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Excess (+) | 0.00% | 0.00 | 0.00 | INR Zero Only | |||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |