Items - Provision of boundary wall for Shangshak Garrison of Assam Rifles
Item Wise BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Item Wise | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, Excess (+), Less (-) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Directorate General Assam Rifles,Shillong-10 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: Provision of boundary wall for shangshak Garrison of Assam Rifles | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: VIII.11014/8972/Engr/2025/HQ 10 Sect AR | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder Name : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (DOMESTIC TENDERS - RATES ARE TO GIVEN IN RUPEES (INR) ONLY) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty Amount in INR | VAT Amount in INR | Freight Charges ( Unloading & Stacking) | Any Other Taxes | Any Other Duties/Levies | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Without Taxes col (13) = (4) x (7) | TOTAL AMOUNT With Taxes col (14) = sum (8) to (13) | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 7 | 8 | 9 | 10 | 11 | 12 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 13 | 14 | 15 |
1.01 | SCHEDULE `A' PART -I (For Boundary wall). Clearing of jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. | Item1 | 2520.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge for Ordinary rock. | Item2 | 774.40 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). | Item3 | 135.95 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from naturalsources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | Item4 | 196.06 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.05 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns. | Item5 | 402.95 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for plinth and string courses fillets, kerbs and steps etc. | Item6 | 882.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.07 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | Item7 | 130.92 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.08 | Centering and shuttering including strutting, propping etc. and removal of form work for : Columns. | Item8 | 1544.26 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). | Item9 | 127.13 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand). | Item10 | 501.86 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto andn above plinth level. Hot rolled deformed bars. | Item11 | 27710.80 | Kg | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.12 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | Item12 | 5378.69 | Kg | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.13 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used with GI barbed wire. | Item13 | 15120.00 | Rm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.14 | 15 mm cement plaster on rough side of single or half brick wall of mix 1:4 (1 cement : 4 coarse sand) | Item14 | 5796.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.15 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works. | Item15 | 208.66 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
1.16 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : two or more coats on new works. | Item16 | 208.66 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
1.17 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade : Two or more coats on new work. | Item17 | 5796.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
2.01 | SCHEDULE `A' PART -II (PCC Footpath). Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil. | Item18 | 1512.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
2.02 | Supplying and stacking at site 90 mm to 45 mm size of WBM with moroum as binding material including 13.2 mm size stone screening sorting, watering spreading to template, compacting stone aggregateto uniformed thickness and consolodiation with power road roller of 8 to 10 tone capacity on two layer woth proper gradaint . | Item19 | 189.00 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
2.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering with mix of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) - All work up to plinth level. | Item20 | 151.20 | Cum | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
2.04 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | Item21 | 252.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||
2.05 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). | Item22 | 1512.00 | Sqm | 0.00 | Excess(+) | 1 | Full Conversion | INR | 0.00 | 0.00 | INR Zero Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
Total in Figures | 0.00 | 0.00 | INR Zero Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | % | 0 | 0 | Zero Only | |||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |