Goa QTY :

Items - Maintenance painting of compound wall at MRH-1 Bungalow, Headland

Tender Details
Costs
Documents
BOQ

BoQ1

Percentage BoQ
BoQ_Ver4.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCLSelectExcess (+)Less (-)Excess (+)Less (-)
Tender Inviting Authority: MORMUGAO PORT AUTHORITY ENGINEERING (CIVIL) DEPARTMENT
Name of Work: "Maintenance painting of compound wall at MRH-1 Bungalow, Headland”.
Contract No: CE/35/2025
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sr. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. PTOTAL AMOUNT With Taxes in Rs. PTOTAL AMOUNT In Words
12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455
1Application of a coat of exterior wall primer of approved quality ,scrapping the wall surfaces for removing all dirt, algae, fungus, vegetation, etc., cleaning and preparing the surface, scaffolding, etc. complete and as directed All tools, plants, labour materials, etc. complete.Item12730.00Sq.m69.00Excess(+)1Full ConversionINR188370.00188370.00INR One Lakh Eighty Eight Thousand Three Hundred Seventy & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
2Painting external wall surfaces, etc with exterior emulsion paint of reputed make/brand and as approved make having anti-fungal properties and of approved colours/shades applied in two or more coats including scrubbing and cleaning the surface of all dirt, dust filling cracks with Crack filler curing necessary scaffolding, painting bays band, chajjas, grooves, etc. complete as directed. All tools, plants, labour materials, etc. complete. (Note: The bidder has to produce the paint including application of paint samples in advance for approval before commencement of the work . The rate does not include the cost of application of external wall primer).Item22730.00Sq.m159.00Excess(+)1Full ConversionINR434070.00434070.00INR Four Lakh Thirty Four Thousand Seventy & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
3Painting iron work/metal work with a primer coat of Red Oxide Zinc Chromite including scrapping, cleaning, surfaces. All tools, plants, materials, labour, etc. completeItem390.00Sq.m75.00Excess(+)1Full ConversionINR6750.006750.00INR Six Thousand Seven Hundred Fifty & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
4Painting iron work/metal work with two coats of approved synthetic enamel paint of approved colour/shades (excluding priming coat) including preparing the surfaces, as directed, etc.. All tools, plants, materials, labour, etc. completeItem4345.00Sq.m168.00Excess(+)1Full ConversionINR57960.0057960.00INR Fifty Seven Thousand Nine Hundred Sixty & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
5Painting two coats on previously painted masonry/ concrete/plastered surfaces with synthetic enamel paint incl. Cleaning & preparing the surfaces. All labour, tool, plants, and material, etc. complete.Item5260.00Sq.m189.00Excess(+)1Full ConversionINR49140.0049140.00INR Forty Nine Thousand One Hundred Forty & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
6Painting internal walls, ceilings with distemper paint in two coats of approved colour/shade in two coats including cleaning and preparing surface, scaffolding etc. All labour & material complete.Item685.00Sq.m102.38Excess(+)1Full ConversionINR8702.308702.30INR Eight Thousand Seven Hundred Two & Paise Thirty Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
7Supplying & erecting in position structural steel work in single section (light sections up to 34 kg./m) using G.I. Pipes, M.S. tubes, Angles, flats, plates, incl. Cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of red oxide zinc chromite primer etc. All labour & materials tools & plant etc. complete.Item72.00Qtl11149.00Excess(+)1Full ConversionINR22298.0022298.00INR Twenty Two Thousand Two Hundred Ninety Eight & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
8Supplying and fixing of 1"x1" x12 gauge G.I. weld mesh including transportation, loading, unloading, etc. All labour & materials tools & plant etc. complete.Item820.00Sq.m988.00Excess(+)1Full ConversionINR19760.0019760.00INR Nineteen Thousand Seven Hundred Sixty & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
9Providing & fixing shuttering for the slab etc. of any size and shape including cleaning, oiling, closing, gaps, removing shuttering after concreting, provisions of necessary props, bracings and other supports etc. All labour, tools, plants, and material etc. completeItem93.00Sqm665.00Excess(+)1Full ConversionINR1995.001995.00INR One Thousand Nine Hundred Ninety Five & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
10RCC (1:11/2:3) mix using 20mm graded black trap stone metal out of quarried boulders as coarse aggregate, including mixing, placing, consolidating, vibrating, levelling, curing etc. but excluding the cost of shuttering and reinforcement. All labour, tools, plants, & material etc. complete.Item100.15cum6899.54Excess(+)1Full ConversionINR1034.931034.93INR One Thousand Thirty Four & Paise Ninety Three Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
11Providing and fixing reinforcement with TMT/tor steel/mild steel including cutting, bending, tying grills, placing in position, holding in position during concreting, including cost of binding wire. All labour and material, tools & plant etc. complete.Item110.15Qtl.8970.92Excess(+)1Full ConversionINR1345.641345.64INR One Thousand Three Hundred Forty Five & Paise Sixty Four Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
12Plastering with C.M. (1:5) 15mm thick in two coats for external surfaces (Backing coat of 10mm & finishing coat of 5mm) including Patches, bays, bands, fluting, scaffolding and cleaning of all dirts, stripping off old damaged/loose plaster raking out joints, hacking, scrubbing, chamfers, beading, curing, stripping off old plaster all lifts etc.as directed. All tools, plants, labour & material, etc. completeItem1220.00Sq.m483.00Excess(+)1Full ConversionINR9660.009660.00INR Nine Thousand Six Hundred Sixty & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
13Providing and fixing 2mm thick polycarbonate sheet including removing the old polycarbonate sheet and disposing off the same out of Port Estate. All labour and material, tools & plant etc. completeItem13110.00Sq.ft.129.00Excess(+)1Full ConversionINR14190.0014190.00INR Fourteen Thousand One Hundred Ninety & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
14Supply of labour for miscellaneous works along with tools for 8 hrs per day1Construction of chamber for 100mm sluices valveitem1101 Nos
14.1i. Fitter/Carpentar/MasonItem142.00nos.1164.00Excess(+)1Full ConversionINR2328.002328.00INR Two Thousand Three Hundred Twenty Eight & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
14.2ii. MazdoorItem152.00nos.882.00Excess(+)1Full ConversionINR1764.001764.00INR One Thousand Seven Hundred Sixty Four & Paise Zero Only1.01Supplying, Conveying and fixing spls. Including eartitem1123.223Nos
Total in Figures819367.87819367.87INR Eight Lakh Nineteen Thousand Three Hundred Sixty Seven & Paise Eighty Seven Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.00INR Zero Only