Bidhelp
DG,BSF,MHA||Rajasthan FTR(Rajasthan),BSF,MHA
DG,BSF,MHA||Rajasthan FTR(Rajasthan),BSF,MHA
Asstt.Commandant(Works)
Rajasthan QTY :

Items - Replacement of filter media of 02 nos slow sand filters of 173 BN HQ Ramgarh II under SHQ BSF Jaisalmer south

Tender Details
Costs
Documents
BOQ

BoQ1

Percentage BoQ
BoQ_Ver3.0PercentageNormalINR OnlyINR
Select, At Par, Excess (+), Less (-)IOCL
Tender Inviting Authority: AssistantCommandant (works)/AE (Civil) , SHQ BSF JSMR(S)
Name of Work - : Replacement of filter media of 02 nos slow sand filters of 173 BN HQ Ramgarh-II under SHQ BSF Jaisalmer (south)
Contract No: 05/AE/ENGG/SHQ BSF JSMR-S/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
Sl. No.Item DescriptionItem Code / MakeQuantityUnitsEstimated Rate in Rs. PAddition / DeductionAddition / Deduction ValuesCurrency Convertion against each ItemQuoted Currency in INR / Other CurrencyBASIC RATE In Figures To be entered by the Bidder Rs. P Excise DutyVATFreight Charges ( Unloading & Stacking)Any Other Taxes/Duties/LeviesOther Taxes 2IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service TaxLess for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. PTOTAL AMOUNT With TaxesTOTAL AMOUNT In Words
123345789101112131415161718192021222324252627282930313233343536373839404142434445464748495051526547
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil155.36Cum177.50Excess(+)1Full ConversionINR27576.4027576.40INR Twenty Seven Thousand Five Hundred & Seventy Six and Paise Forty Only
2Cleaning of under ground sump, Over Head R.C.C. Tank ( independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i)Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge.75.36Sqm84.85Excess(+)1Full ConversionINR6394.306394.30INR Six Thousand Three Hundred & Ninety Four and Paise Thirty Only
3Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.60.29Cum1509.80Excess(+)1Full ConversionINR91025.8491025.84INR Ninety One Thousand &Twenty Five and Paise Eighty Four Only
4Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.60.29Cum1538.25Excess(+)1Full ConversionINR92741.0992741.09INR Ninety Two Thousand Seven Hundred & Forty One and Paise Nine Only
5Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -in- charge.60.29Cum1538.25Excess(+)1Full ConversionINR92741.0992741.09INR Ninety Two Thousand Seven Hundred & Forty One and Paise Nine Only
6 Modified Estimated Cost after using correction factor on DSR 2023 on account of GST @ 0.973 1.00na8383.00Excess(+)1Full ConversionINR-8383.00-8383.00INR Minus Eight Thousand Three Hundred & Eighty Three Only1.02Construction of chamber for 100mm sluice platesitem2213Nos
Total in Figures302096.00302096.00INR Three Lakh Two Thousand &Ninety Six Only4Construction of chamber for 100mm sluice platesitem510Nos
Quoted Rate in FiguresSelect0.000.00INR Zero Only
Quoted Rate in WordsINR Zero Only