Items - Raising and repairing of boundary wall, cleaning and disposal of waste and malba from various vacant plots at Dilshad Garden.
Percentage BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Percentage | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, At Par, Excess (+), Less (-) | IOCL | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Delhi Development Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: M/o various schemes under NA-II (East Zone). SH:- Raising & repairing of boundary wall, cleaning and disposal of waste and malba from various vacant plots at Dilshad Garden. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
NIT No: 10/EE/EMD-1/DDA/2025-26 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT in Rs. P | TOTAL AMOUNT | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 3 | 4 | 5 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 6 | 54 | 7 |
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 52.45 | cum | 177.50 | Excess(+) | 1 | Full Conversion | INR | 9310 | 9310 | INR Nine Thousand Three Hundred & Ten Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level : (a) 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.21 | cum | 6518.60 | Excess(+) | 1 | Full Conversion | INR | 33962 | 33962 | INR Thirty Three Thousand Nine Hundred & Sixty Two Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
3 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 58.00 | cum | 7387.25 | Excess(+) | 1 | Full Conversion | INR | 428461 | 428461 | INR Four Lakh Twenty Eight Thousand Four Hundred & Sixty One Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
4 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level Cement mortar 1:6 (1 cement : 6 coarse sand) | 23.25 | cum | 9844.65 | Excess(+) | 1 | Full Conversion | INR | 228888 | 228888 | INR Two Lakh Twenty Eight Thousand Eight Hundred & Eighty Eight Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.16 | cum | 7878.50 | Excess(+) | 1 | Full Conversion | INR | 64289 | 64289 | INR Sixty Four Thousand Two Hundred & Eighty Nine Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
6 | Centering and shuttering including strutting, propping etc. and removal of form for Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like | 38.00 | sqm | 392.15 | Excess(+) | 1 | Full Conversion | INR | 14902 | 14902 | INR Fourteen Thousand Nine Hundred & Two Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
7 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 80.00 | sqm | 54.65 | Excess(+) | 1 | Full Conversion | INR | 4372 | 4372 | INR Four Thousand Three Hundred & Seventy Two Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
8 | 12 mm cement plaster of mix : (a) 1:6 (1 cement: 6 fine sand) | 40.00 | sqm | 333.35 | Excess(+) | 1 | Full Conversion | INR | 13334 | 13334 | INR Thirteen Thousand Three Hundred & Thirty Four Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
9 | 15 mm cement plaster on the rough side of single or half brick wall of mix : (a) 1:6 (1 cement: 6 fine sand) | 100.00 | sqm | 383.00 | Excess(+) | 1 | Full Conversion | INR | 38300 | 38300 | INR Thirty Eight Thousand Three Hundred Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
10 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) | 214.00 | metre | 375.80 | Excess(+) | 1 | Full Conversion | INR | 80421 | 80421 | INR Eighty Thousand Four Hundred & Twenty One Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
11 | Lettering with black Japan paint of approved brand and manufacture | 6975.00 | per letter per cm height | 6.15 | Excess(+) | 1 | Full Conversion | INR | 42896 | 42896 | INR Forty Two Thousand Eight Hundred & Ninety Six Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
12 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 60.00 | sqm | 156.05 | Excess(+) | 1 | Full Conversion | INR | 9363 | 9363 | INR Nine Thousand Three Hundred & Sixty Three Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
13 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | 82.50 | sqm | 226.25 | Excess(+) | 1 | Full Conversion | INR | 18666 | 18666 | INR Eighteen Thousand Six Hundred & Sixty Six Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
14 | Disposal of garbage/rubbish/muncipal solid waste/ malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge for all lift involved( THE PAYMENT SHALL BE MADE TO THE AGENCY AFTER SUBMISSION OF MCD DUMING GROUND WEIGHING RECIEPT AND PAYMENT RECIEPT) | 450.00 | MT | 3395.00 | Excess(+) | 1 | Full Conversion | INR | 1527750 | 1527750 | INR Fifteen Lakh Twenty Seven Thousand Seven Hundred & Fifty Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
15 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 100.00 | cum | 263.95 | Excess(+) | 1 | Full Conversion | INR | 26395 | 26395 | INR Twenty Six Thousand Three Hundred & Ninety Five Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
16 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge 15.7.4 In cement mortar | 45.00 | cum | 2060.20 | Excess(+) | 1 | Full Conversion | INR | 92709 | 92709 | INR Ninety Two Thousand Seven Hundred & Nine Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
17 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1748.00 | kg | 117.35 | Excess(+) | 1 | Full Conversion | INR | 205128 | 205128 | INR Two Lakh Five Thousand One Hundred & Twenty Eight Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||||
18 | GST correction factor @ 0.973 | 1.0000 | Each | -76657.00 | Excess(+) | 1 | Full Conversion | INR | -76657 | -76657 | INR Minus Seventy Six Thousand Six Hundred & Fifty Seven Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
19 | Cost Index 3% | 1.0000 | Each | 82875.00 | Excess(+) | 1 | Full Conversion | INR | 82875 | 82875 | INR Eighty Two Thousand Eight Hundred & Seventy Five Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||
Total in Figures | 2845364.00 | 2845364.00 | INR Twenty Eight Lakh Forty Five Thousand Three Hundred & Sixty Four Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |