Items - Providing and laying CC in Roads in Sector-29(pt.) and 30(pt.), Rohini under the Jurisdiction of RMD-8
Percentage BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Percentage | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, At Par, Excess (+), Less (-) | IOCL | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Delhi Development Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: D/o 157.83 hect. of land in Sector 29 & 30 (Pt.) Ph-IV & V, Rohini. S.H.: - Providing and laying CC in Roads in Sector-29(pt.) & 30(pt.), Rohini under the Jurisdiction of RMD-8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: 21/EE/RMD-8/DDA/2025-26 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT Rs. P | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 3 | 4 | 5 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 6 | 54 | 7 |
1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (a)Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | BI01010001010000000000000515BI0100001113 | 145.000 | cum | 2434.25 | Excess(+) | 1 | Full Conversion | INR | 352966.25 | 352966.25 | INR Three Lakh Fifty Two Thousand Nine Hundred & Sixty Six and Paise Twenty Five Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
2 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : (a)Concrete of M40 grade with minimum cement content of 390 kg /cum | BI01010001010000000000000515BI0100001114 | 289.000 | cum | 9957.65 | Excess(+) | 1 | Full Conversion | INR | 2877760.85 | 2877760.85 | INR Twenty Eight Lakh Seventy Seven Thousand Seven Hundred & Sixty and Paise Eighty Five Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
3 | Centering and shuttering including strutting, propping etc. and removal of form work for : (a)Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001115 | 80.000 | sqm | 392.15 | Excess(+) | 1 | Full Conversion | INR | 31372.00 | 31372.00 | INR Thirty One Thousand Three Hundred & Seventy Two Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
4 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | BI01010001010000000000000515BI0100001116 | 145.000 | cum | 263.95 | Excess(+) | 1 | Full Conversion | INR | 38272.75 | 38272.75 | INR Thirty Eight Thousand Two Hundred & Seventy Two and Paise Seventy Five Only | 3 | Supplying, Conveying and fixing spls. Including ea | item4 | 10 | Nos | |||||||||||||||||||||||||||||||||||||
5 | Total amount after DSR correction factor @0.973 = (Rs.) ₹ 32,11,261.81 | BI01010001010000000000000515BI0100001117 | 1.000 | rs | 89110.04 | Excess(+) | 1 | Full Conversion | INR | -89110.04 | -89110.04 | INR Minus Eighty Nine Thousand One Hundred & Eleven and Paise Ninety Six Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||
6 | Cost index @3% (Rs.) | BI01010001010000000000000515BI0100001118 | 1.000 | rs | 96337.85 | Excess(+) | 1 | Full Conversion | INR | 96337.85 | 96337.85 | INR Ninety Six Thousand Three Hundred & Thirty Seven and Paise Eighty Five Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | |||||||||||||||||||||||||||||||||||||
Total in Figures | 3307600.00 | 3307600.00 | INR Thirty Three Lakh Seven Thousand Six Hundred Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |