Items - Construction of shed for Stretcher and Wheel chairs in front of OPD at Hospital Complex, AIIMS, Bhubaneswar.
Percentage BoQ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
BoQ_Ver3.0 | Percentage | Normal | INR Only | INR | ||||||||||||||||||||||||||||||||||||||||||||||||||
Select, At Par, Excess (+), Less (-) | IOCL | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Tender Inviting Authority: Executive Engineer (Civil) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of Work: Construction of shed for Stretcher and Wheel chairs in front of OPD at Hospital Complex, AIIMS, Bhubaneswar. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Contract No: AIIMS/BBSR/Engg/004/2025-26 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name of the Bidder/ Bidding Firm / Company : | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRICE SCHEDULE 1. (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ). | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sl. No. | Item Description | Item Code / Make | Quantity | Units | Estimated Rate in Rs. P | Addition / Deduction | Addition / Deduction Values | Currency Convertion against each Item | Quoted Currency in INR / Other Currency | BASIC RATE In Figures To be entered by the Bidder Rs. P | Excise Duty | VAT | Freight Charges ( Unloading & Stacking) | Any Other Taxes/Duties/Levies | Other Taxes 2 | IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax | Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category | TOTAL AMOUNT With Taxes in Rs. P | TOTAL AMOUNT With Taxes | TOTAL AMOUNT In Words | ||||||||||||||||||||||||||||||||||
1 | 2 | 3 | 3 | 4 | 5 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 6 | 54 | 7 |
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift , as directed by Engineer-in charge. All kinds of soil | Item-1 | 50.00 | Cum | 172.71 | 326.15 | Excess(+) | 1 | Full Conversion | INR | 8635.50 | 8635.50 | INR Eight Thousand Six Hundred & Thirty Five and Paise Fifty Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | Item-2 | 140.00 | SQM | 33.23 | 122643.48 | Excess(+) | 1 | Full Conversion | INR | 4652.20 | 4652.20 | INR Four Thousand Six Hundred & Fifty Two and Paise Twenty Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | Item-3 | 50.00 | Cum | 190.71 | 14973.26 | Excess(+) | 1 | Full Conversion | INR | 9535.50 | 9535.50 | INR Nine Thousand Five Hundred & Thirty Five and Paise Fifty Only | 3 | Supplying, Conveying and fixing spls. Including ea | item4 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
4 | Supplying and filling in plinth with river sand under floors, including watering, ramming, consolidating and dressing complete. | Item-4 | 32.00 | Cum | 2066.41 | 32730.44 | Excess(+) | 1 | Full Conversion | INR | 66125.12 | 66125.12 | INR Sixty Six Thousand One Hundred & Twenty Five and Paise Twelve Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||
5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | Item-5 | 23.00 | Cum | 6628.08 | 27124.19 | Excess(+) | 1 | Full Conversion | INR | 152445.84 | 152445.84 | INR One Lakh Fifty Two Thousand Four Hundred & Forty Five and Paise Eighty Four Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | Item-6 | 8.00 | Cum | 8801.51 | 11766.85 | Excess(+) | 1 | Full Conversion | INR | 70412.08 | 70412.08 | INR Seventy Thousand Four Hundred & Twelve and Paise Eight Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars of grade Fe-500D or more. | Item-7 | 720.00 | Kg | 104.94 | 11766.85 | Excess(+) | 1 | Full Conversion | INR | 75556.80 | 75556.80 | INR Seventy Five Thousand Five Hundred & Fifty Six and Paise Eighty Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
8 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : | 0 | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | |||||||||||||||||||||||||||||||||||||||||||||||
8.1 | Foundations, footings, bases of columns, etc. for mass concrete | Item-9 | 31.00 | Sqm | 381.56 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 11828.36 | 11828.36 | INR Eleven Thousand Eight Hundred & Twenty Eight and Paise Thirty Six Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
8.2 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | Item-10 | 15.00 | Sqm | 716.52 | 11766.85 | Excess(+) | 1 | Full Conversion | INR | 10747.80 | 10747.80 | INR Ten Thousand Seven Hundred & Forty Seven and Paise Eighty Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | Item-11 | 2.00 | Cum | 6939.68 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 13879.36 | 13879.36 | INR Thirteen Thousand Eight Hundred & Seventy Nine and Paise Thirty Six Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
10 | Brick work with non modular flyash brick confirming to IS:12894 of class designation 10 average compressive strength in superstructure above plinth level up to floor five level in :Cement mortar 1:4 (1 cement : 4 coarse sand) | Item-12 | 11.00 | Cum | 8720.37 | 10413.69 | Excess(+) | 1 | Full Conversion | INR | 95924.07 | 95924.07 | INR Ninety Five Thousand Nine Hundred & Twenty Four and Paise Seven Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||
11 | Half Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in : Cement mortar 1:4 (1 cement : 4 Coarse sand) | Item-13 | 13.00 | Sqm | 1075.94 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 13987.22 | 13987.22 | INR Thirteen Thousand Nine Hundred & Eighty Seven and Paise Twenty Two Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
12 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | Item-14 | 86.00 | Sqm | 324.35 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 27894.10 | 27894.10 | INR Twenty Seven Thousand Eight Hundred & Ninety Four and Paise Ten Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
13 | 15 mm cement plaster on the rough side of single or half brick wall of mix :: 1:6 (1 cement: 6 fine sand) | Item-15 | 43.00 | Sqm | 372.66 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 16024.38 | 16024.38 | INR Sixteen Thousand &Twenty Four and Paise Thirty Eight Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
14 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre /10 sqm) | Item-16 | 129.00 | Sqm | 156.26 | 326.15 | Excess(+) | 1 | Full Conversion | INR | 20157.54 | 20157.54 | INR Twenty Thousand One Hundred & Fifty Seven and Paise Fifty Four Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
15 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work | Item-17 | 300.00 | Sqm | 235.22 | 122643.48 | Excess(+) | 1 | Full Conversion | INR | 70566.00 | 70566.00 | INR Seventy Thousand Five Hundred & Sixty Six Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
16 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | Item-18 | 100.00 | Sqm | 220.14 | 14973.26 | Excess(+) | 1 | Full Conversion | INR | 22014.00 | 22014.00 | INR Twenty Two Thousand &Fourteen Only | 3 | Supplying, Conveying and fixing spls. Including ea | item4 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
17 | Providing, fabricating, assembling and erection of Tensile Fabric Roof over steel truss ( steel truss to be paid for separately) as per the approved drawing and design all complete as per direction of engineer in charge. The fabric shall be heavy duty opaque white sheets of base PES and precoated with PVDF/PTFE/ PVC of reputed make like Serge Ferrari /Verseidag or equivalent having minimum weight of 900 g/sqm and total thickness of 0.70mm. It may have tensile Strength (warp/ weft) :4200/ 4000N/ 5cm as per EN ISO 1421, Tear Strength (warp/ weft) :550/ 500N - DIN 53.363, Adhesion-120 N/5cm and flame retardancy & solar reflectance index conforming to Euroclass. Warranty on the fabric shall be of minimum 10 years. The fabric shall be fixed to steel truss as per manufacturer's specification with the help of Galvanised MS Membrane/ End Plate, Shackles, Rigging Screws, Turnbuckles, galvanized MS strands/ cables with stainless steel end terminals etc. all complete as per drawing & instructions of Engineer-in-charge. (Rate includes all operations like cutting, designing, fabrication, hot weld stich of fabric etc upto the desired height including shop drawings for foundation, structural steel truss for canopy, transportation to the site, all hardwares, Aluminium flat, EPDM gasket, tools and plants, and necessary scaffolding etc.). | Item-19 | 140.00 | Sqm | 4213.00 | 32730.44 | Excess(+) | 1 | Full Conversion | INR | 589820.00 | 589820.00 | INR Five Lakh Eighty Nine Thousand Eight Hundred & Twenty Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||
18 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Item-20 | 3,000.00 | Kg | 130.09 | 27124.19 | Excess(+) | 1 | Full Conversion | INR | 390270.00 | 390270.00 | INR Three Lakh Ninety Thousand Two Hundred & Seventy Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
19 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate | Item-21 | 144.00 | Sqm | 597.62 | 11766.85 | Excess(+) | 1 | Full Conversion | INR | 86057.28 | 86057.28 | INR Eighty Six Thousand &Fifty Seven and Paise Twenty Eight Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
20 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | Item-22 | 30.00 | sqm | 128.19 | 11766.85 | Excess(+) | 1 | Full Conversion | INR | 3845.70 | 3845.70 | INR Three Thousand Eight Hundred & Forty Five and Paise Seventy Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
21 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. | Item-23 | 1,500.00 | Kg | 231.91 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 347865.00 | 347865.00 | INR Three Lakh Forty Seven Thousand Eight Hundred & Sixty Five Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
22 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | Item-24 | 4.00 | CUM | 2368.53 | 10413.69 | Excess(+) | 1 | Full Conversion | INR | 9474.12 | 9474.12 | INR Nine Thousand Four Hundred & Seventy Four and Paise Twelve Only | 1.01 | Supplying, Conveying and fixing spls. Including eart | item1 | 123.223 | Nos | ||||||||||||||||||||||||||||||||||||
23 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | Item-25 | 10.00 | CUM | 256.82 | 7625.60 | Excess(+) | 1 | Full Conversion | INR | 2568.20 | 2568.20 | INR Two Thousand Five Hundred & Sixty Eight and Paise Twenty Only | 1.02 | Construction of chamber for 100mm sluice plates | item2 | 213 | Nos | ||||||||||||||||||||||||||||||||||||
24 | Providing and fixing Polyvinyl Chloride (PVC) pipes, having thermal stability for hot & cold water supply including all PVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 110 mm nominal dia Pipes | Item-26 | 45.00 | Mtr. | 543.00 | 11766.85 | Excess(+) | 1 | Full Conversion | INR | 24435.00 | 24435.00 | INR Twenty Four Thousand Four Hundred & Thirty Five Only | 2 | Construction of chamber for 100mm sluices valve | item3 | 10 | Nos | ||||||||||||||||||||||||||||||||||||
Total in Figures | 2144721.17 | 2144721.17 | Twenty One Lakh Forty Four Thousand Seven Hundred & Twenty One and Paise Seventeen Only | 4 | Construction of chamber for 100mm sluice plates | item5 | 10 | Nos | ||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Figures | Select | 0.00 | 0.00 | INR Zero Only | ||||||||||||||||||||||||||||||||||||||||||||||||||
Quoted Rate in Words | INR Zero Only |
Andaman & Nicobar Tenders |Andhra Pradesh Tenders |Arunachal Pradesh Tenders |Assam Tenders |Bihar Tenders |Chandigarh Tenders |Chhattisgarh Tenders |Dadra & Nagar Haveli Tenders |Daman & Diu Tenders |Delhi Tenders |Goa Tenders |Gujarat Tenders |Haryana Tenders |Himachal Pradesh Tenders |Jammu & Kashmir Tenders |Jharkhand Tenders |Karnataka Tenders |Kerala Tenders |Ladakh Tenders |Lakshadweep Tenders |Madhya Pradesh Tenders |Maharashtra Tenders |Manipur Tenders |Meghalaya Tenders |Mizoram Tenders |Nagaland Tenders |Odisha Tenders |Pondicherry Tenders |Punjab Tenders |Rajasthan Tenders |Sikkim Tenders |Tamil Nadu Tenders |Telangana Tenders |Tripura Tenders |Uttarakhand Tenders |Uttar Pradesh Tenders |West Bengal Tenders |